Breezeland Residence

Project Files

  • Addendum 3 - 4-27-18
    • A1.1 Lower Level Floor Plan Revised.pdf Uploaded: 4/27/2018 (1416 kb)
    • Addendum 3 Summary-1.pdf Uploaded: 4/27/2018 (94 kb)
    • E1.1 LL Electrical Revised.pdf Uploaded: 4/27/2018 (421 kb)
    • Gutter Spec Revised.pdf Uploaded: 4/27/2018 (27 kb)
    • Revised Alternate List.pdf Uploaded: 4/27/2018 (159 kb)
    • Revised Floor Schedule.pdf Uploaded: 4/27/2018 (67 kb)
    • Revised Lighting Schedule.pdf Uploaded: 4/27/2018 (97 kb)
    • Summary of Changes.pdf Uploaded: 4/27/2018 (59 kb)
  • Specifications
    • 01. Table of Contents Uploaded: 2/22/2018 (151 kb)
    • 02. Summary Uploaded: 2/22/2018 (134 kb)
    • 03. Price Payment Requirements Uploaded: 2/22/2018 (123 kb)
    • 04. Admin Requirements Uploaded: 2/22/2018 (144 kb)
    • 05. Quality Requirements Uploaded: 2/22/2018 (114 kb)
    • 06. Temporary Facilities Control Uploaded: 2/22/2018 (121 kb)
    • 07. Product Requirements Uploaded: 2/22/2018 (120 kb)
    • 08. Executive Requirements Uploaded: 2/22/2018 (119 kb)
    • 09. Selection Demo Debris Removal Uploaded: 2/22/2018 (120 kb)
    • 10. Site Clearing Uploaded: 2/22/2018 (9 kb)
    • 11. Earthwork Uploaded: 2/22/2018 (127 kb)
    • 12. Water Supply Wells Uploaded: 2/22/2018 (16 kb)
    • 13. Sanitary Sewage Uploaded: 2/22/2018 (124 kb)
    • 14. Foundation Drainage Piping Uploaded: 2/22/2018 (119 kb)
    • 15. Storm Drainage Uploaded: 2/22/2018 (10 kb)
    • 16. Cast in Place Concrete Uploaded: 2/22/2018 (129 kb)
    • 17. Unit Masonry Assembly Uploaded: 2/22/2018 (135 kb)
    • 18. Stone Veneer Arch. Stone Uploaded: 2/22/2018 (131 kb)
    • 19. Structural Steel Uploaded: 2/22/2018 (121 kb)
    • 20. Metal Fabrication Uploaded: 2/22/2018 (11 kb)
    • 21. Rough Carpentry Uploaded: 2/22/2018 (140 kb)
    • 22. Misc. Carpentry Uploaded: 2/22/2018 (120 kb)
    • 23. Metal Plate Connected Wood Trusses Uploaded: 2/22/2018 (12 kb)
    • 24. Finish Carpentry Uploaded: 2/22/2018 (121 kb)
    • 25. Ext Arch Millwork Uploaded: 2/22/2018 (118 kb)
    • 26. Interior Arch. Millwork Uploaded: 2/22/2018 (133 kb)
    • 27. Cabinet Hardware Uploaded: 2/22/2018 (112 kb)
    • 28. Composite Sheet Waterproofing Uploaded: 2/22/2018 (116 kb)
    • 29. Building Insulation Uploaded: 2/22/2018 (122 kb)
    • 30. Asphalt Shingles Uploaded: 2/22/2018 (117 kb)
    • 31. EPDM Membrane Roof Uploaded: 2/22/2018 (118 kb)
    • 32. Sheet Metal Roofing Uploaded: 2/22/2018 (127 kb)
    • 33. Gutters and Flashing Uploaded: 2/22/2018 (122 kb)
    • 34. Joint Sealants Uploaded: 2/22/2018 (6 kb)
    • 35. Weatherstripping Uploaded: 2/22/2018 (61 kb)
    • 36. Manufactured Doors Uploaded: 2/22/2018 (68 kb)
    • 37. Mill Made Doors Uploaded: 2/22/2018 (71 kb)
    • 38. Access Doors - Panels Uploaded: 2/22/2018 (64 kb)
    • 39. Screen Doors Uploaded: 2/22/2018 (67 kb)
    • 40. Screen Systems Uploaded: 2/22/2018 (66 kb)
    • 41. Sectional Overhead Doors Uploaded: 2/22/2018 (70 kb)
    • 42. Windows Uploaded: 2/22/2018 (68 kb)
    • 43. Door Hardware Uploaded: 2/22/2018 (68 kb)
    • 44. Gypsum Board Assemblies Uploaded: 2/22/2018 (71 kb)
    • 45. Stone Ceramic Tile Uploaded: 2/22/2018 (128 kb)
    • 46. Wood Flooring Uploaded: 2/22/2018 (79 kb)
    • 47. Vinyl Tile Uploaded: 2/22/2018 (69 kb)
    • 48. Composite Wall Panel Uploaded: 2/22/2018 (62 kb)
    • 49. Stone Composite Stone Fabrications Uploaded: 2/22/2018 (72 kb)
    • 50. Painting Uploaded: 2/22/2018 (76 kb)
    • 51. Concrete Finishes Uploaded: 2/22/2018 (121 kb)
    • 52. Metal Flue Uploaded: 2/22/2018 (115 kb)
    • 53. Bath Accessories and Hardware Uploaded: 2/22/2018 (64 kb)
    • 54. Mirror and Shower Glazing Uploaded: 2/22/2018 (68 kb)
    • 55. Appliances Uploaded: 2/22/2018 (62 kb)
    • 56. Preman Furnishings Uploaded: 2/22/2018 (87 kb)
    • 57. Central Vacuum Uploaded: 2/22/2018 (71 kb)
    • 58. Common Piping Requirements Uploaded: 2/22/2018 (84 kb)
    • 59. Mechanical Insulation Uploaded: 2/22/2018 (67 kb)
    • 60. Valves Uploaded: 2/22/2018 (71 kb)
    • 61. Pumps Uploaded: 2/22/2018 (71 kb)
    • 62. Domestic Water Piping Uploaded: 2/22/2018 (105 kb)
    • 62. Sanitary Waste Vent Piping Uploaded: 2/22/2018 (72 kb)
    • 63. Refrigerant Piping Uploaded: 2/22/2018 (85 kb)
    • 65. Natural Gas Piping Uploaded: 2/22/2018 (101 kb)
    • 66. Plumbing Specialties Uploaded: 2/22/2018 (90 kb)
    • 67. Domestic Water Heaters Uploaded: 2/22/2018 (70 kb)
    • 68. Furnaces Uploaded: 2/22/2018 (88 kb)
    • 69. Condensing Units Uploaded: 2/22/2018 (68 kb)
    • 70. Unit Heaters Uploaded: 2/22/2018 (64 kb)
    • 71. Ducts and Accessories Uploaded: 2/22/2018 (74 kb)
    • 72. Power Ventilators Uploaded: 2/22/2018 (80 kb)
    • 73. Diffusers Registers and Grilles Uploaded: 2/22/2018 (17 kb)
    • 74. HVAC Instrumentation and Controls Uploaded: 2/22/2018 (74 kb)
    • 75. Wiring Methods Uploaded: 2/22/2018 (96 kb)
    • 76. Wiring Devices Uploaded: 2/22/2018 (90 kb)
    • 77. Panelboards Uploaded: 2/22/2018 (71 kb)
    • 78. Low Voltage Transformers and Power Supplies Uploaded: 2/22/2018 (64 kb)
    • 79. Lighting Fixtures Uploaded: 2/22/2018 (68 kb)
    • 80. Generator Uploaded: 2/22/2018 (116 kb)
  • Drawings
    • A1.1 Lower Level Floor Plan Uploaded: 2/22/2018 (539 kb)
    • A1.2 First Floor Plan Uploaded: 2/22/2018 (593 kb)
    • A1.3 Second Floor Plan Uploaded: 2/22/2018 (458 kb)
    • A1.4 Roof Plan Uploaded: 2/22/2018 (124 kb)
    • A3.1 Lower Level Finish Plan Uploaded: 2/22/2018 (1143 kb)
    • A3.2 First Floor Finish Plan Uploaded: 2/22/2018 (731 kb)
    • A3.3 Second Floor Finish Plan Uploaded: 2/22/2018 (2881 kb)
    • A4.1 Exterior Elevations Uploaded: 2/22/2018 (993 kb)
    • A4.2 Exterior Elevations Uploaded: 2/22/2018 (741 kb)
    • A4.3 Exterior Elevations Sections Uploaded: 2/22/2018 (419 kb)
    • A5.1 Building Sections Uploaded: 2/22/2018 (350 kb)
    • A5.2 Building Sections Uploaded: 2/22/2018 (431 kb)
    • A5.3 Exterior Details Uploaded: 2/22/2018 (1499 kb)
    • A5.4 Exterior Details Uploaded: 2/22/2018 (1322 kb)
    • A5.5 Exterior Details Uploaded: 2/22/2018 (2329 kb)
    • A5.6 Exterior Details Uploaded: 2/22/2018 (796 kb)
    • A6.1 Interior Elevation Uploaded: 2/22/2018 (2598 kb)
    • A6.2 Interior Elevations Uploaded: 2/22/2018 (1592 kb)
    • A6.3 Interior Elevations Uploaded: 2/22/2018 (1208 kb)
    • A6.4 Interior Elevations Uploaded: 2/22/2018 (1917 kb)
    • A7.1 Interior Details Uploaded: 2/22/2018 (156 kb)
    • A7.2 Interior Details Uploaded: 2/22/2018 (321 kb)
    • A7.3 Interior Details Uploaded: 2/22/2018 (741 kb)
    • C1.1 Site Demolition Plan Uploaded: 2/22/2018 (5224 kb)
    • C1.2 Site Plan Uploaded: 2/22/2018 (824 kb)
    • E1.1 Lower Level Electrical Plan Uploaded: 2/22/2018 (397 kb)
    • E1.2 First Floor Electrical Plan Uploaded: 2/22/2018 (852 kb)
    • E1.3 Second Floor Electrical Plan Uploaded: 2/22/2018 (375 kb)
    • M1.1 HVAC Floor Plan Uploaded: 2/22/2018 (428 kb)
    • M1.2 HVAC Floor Plan Uploaded: 2/22/2018 (350 kb)
    • M1.3 HVAC Floor Plan Uploaded: 2/22/2018 (367 kb)
    • Structural Bid Set Uploaded: 2/22/2018 (6531 kb)
  • Selection Cut Sheets
    • Appliances.pdf Uploaded: 2/26/2018 (6435 kb)
    • Bath Accessories.pdf Uploaded: 2/26/2018 (4325 kb)
    • Cabinets and Tops.pdf Uploaded: 2/26/2018 (4931 kb)
    • Doors and Hardware.pdf Uploaded: 2/26/2018 (2305 kb)
    • Drywall.pdf Uploaded: 2/26/2018 (60 kb)
    • Ext. and Int. Millwork.pdf Uploaded: 2/26/2018 (123 kb)
    • Flooring.pdf Uploaded: 2/26/2018 (10776 kb)
    • Glass and Shower Doors.pdf Uploaded: 2/26/2018 (2490 kb)
    • Light Fixtures.pdf Uploaded: 2/26/2018 (20356 kb)
    • Masonry.pdf Uploaded: 2/26/2018 (199 kb)
    • Painting.pdf Uploaded: 2/26/2018 (118 kb)
    • Plumbing Fixtures.pdf Uploaded: 2/26/2018 (20146 kb)
    • Wall Coverings.pdf Uploaded: 2/26/2018 (1460 kb)
    • Windows.pdf Uploaded: 2/26/2018 (61 kb)
  • Addendum 1 - 3-09-18
    • AD1.1 First Floor Electrical Kitchen and Rear Hall - Change Fixture Dimensions and Type.pdf Uploaded: 3/14/2018 (59 kb)
    • AD1.10 First Floor Electrical - Covered Porch - Change Fixture Type.pdf Uploaded: 3/14/2018 (77 kb)
    • AD1.11 Second Floor Electrical - Office Lounge - Change Fixture Type.pdf Uploaded: 3/14/2018 (102 kb)
    • AD1.2 First Floor Electrical - Screen Porch - Label Fixture Type.pdf Uploaded: 3/14/2018 (146 kb)
    • AD1.3 Lower Level Floor Plan - Add Foundation Wall.pdf Uploaded: 3/14/2018 (69 kb)
    • AD1.4 First Floor Plan - Add Columns at Screen Porch.pdf Uploaded: 3/14/2018 (81 kb)
    • AD1.5 Exterior - Lower Terrace Sill Detail.pdf Uploaded: 3/14/2018 (150 kb)
    • AD1.6 Second Floor Electrical - Master Bath - Add Outlet in Drawer for Dryer.pdf Uploaded: 3/14/2018 (62 kb)
    • AD1.7 First Floor Finish Plan - Add Wood Transition Strip.pdf Uploaded: 3/14/2018 (154 kb)
    • AD1.8 Exterior Details - Front Door Jamb at Pilaster Detail.pdf Uploaded: 3/14/2018 (71 kb)
    • AD1.9 First Floor HVAC - Relocate Range Blower to Roof.pdf Uploaded: 3/14/2018 (63 kb)
    • Addendum 1 Summary of Changes.pdf Uploaded: 3/14/2018 (155 kb)
    • Alternate List Revised 3-09-18.pdf Uploaded: 3/14/2018 (121 kb)
    • Door Hardware Schedule Revised 3-09-18.pdf Uploaded: 3/14/2018 (54 kb)
    • Glazing Schedule Revised 3-09-18.pdf Uploaded: 3/14/2018 (56 kb)
    • Interior Paint Schedule Revised 3-09-18.pdf Uploaded: 3/14/2018 (97 kb)
    • Light Fixture Cutsheets Arch Revised 3-09-18.pdf Uploaded: 3/14/2018 (1139 kb)
    • Light Fixture Cutsheets Decorative Revised 3-09-18.pdf Uploaded: 3/14/2018 (445 kb)
    • Light Fixture Schedule Revised 3-09-18.pdf Uploaded: 3/14/2018 (97 kb)
    • Masonry Schedule Revised 3-09-18.pdf Uploaded: 3/14/2018 (74 kb)
    • Plumbing Fixture Schedule Revised 3-09-18.pdf Uploaded: 3/14/2018 (76 kb)
    • Spec Summary Page Revised 3-09-18.pdf Uploaded: 3/14/2018 (33 kb)
    • Structural Revisions 3-09-18.pdf Uploaded: 3/14/2018 (6459 kb)
    • Window Schedule Revised 3-09-18.pdf Uploaded: 3/14/2018 (65 kb)
  • Addendum 3 Summary-2.pdf Uploaded: 4/27/2018 (94 kb)
  • Addendum 3 Summary.pdf Uploaded: 4/27/2018 (94 kb)
  • Alternate List Uploaded: 2/22/2018 (108 kb)
  • Plat of Survey Uploaded: 2/22/2018 (1904 kb)
  • Soil Report 12-08-17 Uploaded: 2/22/2018 (1830 kb)

Project Info

Project #
Project Name Breezeland Residence
Location Oconomowoc/Delafield
Address Map It 34806 N Breezeland Drive
City Summit
State WI
Zip 53066
Bid Date May 2, 2018
Bid Time 12:00 PM
 
Scope Breezeland Residence - New Construction 

Removal of Existing Shed, Detached Garage and House and New Construction House with Attached Garage

This plan is VERY detailed - EVERYTHING is specified - down to cabinet hardware and handrail brackets. The architects have left nothing unselected.

Please be sure to review all plans, specifications and schedules that affect your scope of work thoroughly. 

ANY substitutions from what is specified MUST be noted on your proposals. If not, we can only assume that you are bidding per the plans, specifications and schedules provided. 

Please review the Alternate List and provide separate pricing for any/all alternates that affect your scope of work.

We are asking that bids be returned no later than Tuesday, 2/06/18 by the end of the day.

Bids can be submitted online or by emailing Amanda Proulx at aproulx@scherrerconstruction.com

Do not hesitate to call us with any questions. 

Plans Provided in Plan Room - See link for Plans, Specifications and Schedules
Other Info

Notices

If you are looking for attached files related to a Notice, go back to the Home tab ("Project Files" are on the right side).
Title Created By Created On
Bid Reminder Bid Reminder Alert 2/22/2018
Breezeland - Addendum #1 Amanda Proulx 3/14/2018
Breezeland Bid Revisions - Addendum #3 Amanda Proulx 4/27/2018

Estimators

Company Estimator Phone Extension Fax Email
Scherrer Construction Co., Inc. Amanda Proulx 262-539-3100 211 262-539-3101 aproulx@scherrerconstruction.com

If you have project-related questions, please contact your contractor or use the "Submit Question" tab.
If you are having technical difficulties downloading, please email support@pipelinesuite.com or call 949-222-0400.