ARROYO HIGH SCHOOL ACCESS COMPLIANCE IMPROVEMENTS AND INTRUSION CONTROL MEASURES

Project Files

  • 01 Plumbing.pdf Uploaded: 7/27/2023 (7072 kb)
  • 02 Toilet Accessories Compartments.pdf Uploaded: 7/27/2023 (5015 kb)
  • 03 Finishes.pdf Uploaded: 7/27/2023 (2604 kb)
  • 04 Controls.pdf Uploaded: 7/27/2023 (3477 kb)
  • 05 Security Door Lock System.pdf Uploaded: 7/27/2023 (3550 kb)
  • 06 Hardware.pdf Uploaded: 7/27/2023 (10966 kb)
  • Addn-01-1.pdf Uploaded: 7/27/2023 (2015 kb)
  • Addn-01.pdf Uploaded: 7/27/2023 (168 kb)
  • Addn-02-1.pdf Uploaded: 7/27/2023 (1995 kb)
  • Addn-02.pdf Uploaded: 7/27/2023 (666 kb)
  • Addn-03-1.pdf Uploaded: 9/8/2023 (2576 kb)
  • Addn-03.pdf Uploaded: 9/8/2023 (1033 kb)
  • Addn-04-1.pdf Uploaded: 9/8/2023 (15889 kb)
  • Addn-04.pdf Uploaded: 9/8/2023 (10580 kb)
  • Addn-05-1.pdf Uploaded: 9/8/2023 (19085 kb)
  • Addn-05.pdf Uploaded: 9/8/2023 (634 kb)
  • Addn-06-1.pdf Uploaded: 9/8/2023 (7435 kb)
  • Addn-06.pdf Uploaded: 9/8/2023 (1032 kb)
  • Notice to Bidders.pdf Uploaded: 7/27/2023 (162 kb)
  • Plans.pdf Uploaded: 7/27/2023 (136598 kb)
  • Project Manual.pdf Uploaded: 7/27/2023 (11640 kb)
  • Tab-Cutsheets Cover.pdf Uploaded: 7/27/2023 (7 kb)

Project Info

Project #
Project Name ARROYO HIGH SCHOOL ACCESS COMPLIANCE IMPROVEMENTS AND INTRUSION CONTROL MEASURES
Location
Address Map It 5701 San Lorenzo Avenue
City San Lorenzo 
State CA
Zip 94580
Bid Date September 12, 2023
Bid Time 2:00 PM
 
Scope The Project consists of:
Site Work:
1. Paving repair and path of travel upgrades at:
A. Quad area
B. Various concrete walkways
C. Asphalt paving area

Building Work:
2. Restrooms accessibility compliance safety upgrades for students and staff at building A, B, C, D, F, T
3. Required mechanical, plumbing, electrical, fire - alarm infrastructure upgrades (at upgraded restrooms)
4. Replacement of non-compliant drinking fountains at path of travel
5. Removal of partial existing covered walkway at the quad area
6. Replacement of various damaged doors and frames

Security and intrusion control upgrades:
7. Campus-wide installation of a networked - wireless locking security system
8. Replacement of non-state compliant hardware with "columbine" locking hardware
9. Installation of a 8' high protective ornamental fence and gates adjacent to Building A and Library inclusive of approved hardware
10. Installation of double swing barrier vehicular gate at Students parking lot
11. New 8' high chain link fence and gates behind Building S
Plans
Other Info

If you have project-related questions, please contact your contractor or use the "Submit Question" tab.
If you are having technical difficulties downloading, please email support@pipelinesuite.com or call 949-222-0400.