NIVEN PARK PLAYGROUND IMPROVEMENT PROJECT

Project Files

  • 01_Notice Inviting Bids.pdf Uploaded: 9/20/2023 (912 kb)
  • 02_Specifications.pdf Uploaded: 9/20/2023 (2560 kb)
  • Addendum_1.pdf Uploaded: 9/29/2023 (213 kb)
  • Plans.pdf Uploaded: 9/20/2023 (45965 kb)
  • Q and A Document 1 - 09-27-23.pdf Uploaded: 9/29/2023 (3 kb)

Project Info

Project #
Project Name NIVEN PARK PLAYGROUND IMPROVEMENT PROJECT
Location
Address Map It 5 Barry Way Greenbrae
City Greenbrae
State CA
Zip 94904
Bid Date October 24, 2023
Bid Time 2:00 PM
 
Scope The Work consists of: Removal of the existing play structure, concrete curbing and wood fiber surfacing materials; installation of new water utility lines and drainage system; grading; installation of new play structures, ornamental features, art sculptures, tables, benches, drinking fountains, and other site furnishings; installation of new surfacing for pathways and the play areas; installation of short retaining walls and perimeter fencing; installation of landscaping materials, plants, and irrigation system. Standard vehicular & pedestrian traffic control and erosion control protocols shall be observed. Removal of packing materials and general cleanup of the project area shall be included.

All playground equipment, furnishings and materials shall be installed in a manner in accordance with current ASTM and CPSC playground safety standards and guidelines.
Plans
Other Info

If you have project-related questions, please contact your contractor or use the "Submit Question" tab.
If you are having technical difficulties downloading, please email support@pipelinesuite.com or call 949-222-0400.