BWW Remodel (Kansas City) GC AWARDED

Project Files

  • BWW 154 Kansas City MO Construction Set Combined.pdf Uploaded: 6/10/2024 (14007 kb)
  • BWW-154-KansasCity-MO-R1.pdf Uploaded: 6/10/2024 (2527 kb)
  • BWW154 - KANSAS CITY MO - INTERACTIVE PDF.pdf Uploaded: 6/10/2024 (1894 kb)
  • CLARIFICATIONS BWW KANSAS CITY MO.pdf Uploaded: 6/10/2024 (624 kb)

Project Info

Project # 154
Project Name BWW Remodel (Kansas City) GC AWARDED
Location
Address Map It 9207 NE HWY. 152
City Kansas City
State MO
Zip 64158
Bid Date June 17, 2024
Bid Time 1:00 PM
 
Scope

GC AWARDED

Buffalo Wild Wings #154

9207 NE Hwy. 152

Kansas City, MO 64158

 

YOU MUST REVIEW CLARIFICATION SHEET FOR ADDITIONAL WORK THAT NEEDS TO BE PRICED THAT IS NOT FOUND ON THE DRAWINGS!

 



Our target project time frame is 8/11/24-8/23/24

 

The FIRST week of the project will be NIGHT work after the restaurant closes. The SECOND week of the project the restaurant will be completely closed for DAY work. The project is only 11 consecutive days long.

 

 

Click the below link to do a virtual walkthrough of the space – it’s really cool!!

BWW #154- Kansas City MO (matterport.com)

 

 

Clarifications:

 

Patio

·         Existing furniture at patio to remain

Dining

·         Any receptacle(s) in low wall need to be safely removed. Ensure power to neighboring areas not affected.

·         Existing ductwork in bar/dining to be painted to match existing ceiling color

Bar

·         Cut foot rail at ADA portion of bar. Paint rail black and cap. We may replace tile at bolted sections. If not, bolts are to be cut, filed, and filled with similar colored grout/fill.

·         We are not installing combo outlets at front bar diewall

·         Remove existing vinyls off refrigerators; Sign vendor to install new decals

General

·         Keep all memorabilia. At the end, hang pieces back up in locations requested by Operations

·         GC is to coordinate with vendors for all deliveries

·         Replace base tile as needed throughout dining and bar

·         Replace existing half wall top caps/side trim w/ Solid Surface top caps & side trim (supplied by Millwork vendor)

·         During closure for concrete polishing (3-4 days), Kitchen must remain open for Curbside pick up

 

Added Scope Requests NOT SHOWN ON THE DRAWINGS. Site survey may be required OR use the virtual walk-thru link to see the interior and exterior of the restaurant.

·         Address strong sewage smell coming from both RR drains. Men’s room is worse. A big complaint from guests, and it can be smelled in dining rooms.

·         Add tint to all windows in dining room

 Replace all ‘wood’ floor tile throughout bar, dining and corridor. Current tile is uneven, some cracked/popping, grout lines dirty and old. Use the below tile for replacement

·        Add 2-3 track lights above booths in dining A

·       Vestibule door scrapes floor, verify if door needs to be adjusted or if tile needs to be replaced.

Replace drywall at leaking bar taps

·       Replace missing tiles underneath bar glassware rack
Fill potholes  Reseal and restripe parking lot

 

 

 

 

 

 

 

SEND ALL BID QUESTIONS AND PROPOSALS DIRECTLY VIA EMAIL TO ERINS@VENATORCONTRACTING.COM
Cell: 586.873.4611


Plans
Other Info SEND ALL BID QUESTIONS AND PROPOSALS DIRECTLY VIA EMAIL TO ERINS@VENATORCONTRACTING.COM
Cell: 586.873.4611

Notices

If you are looking for attached files related to a Notice, go back to the Home tab ("Project Files" are on the right side).
Title Created By Created On
Bid Reminder Bid Reminder Alert 6/10/2024

Estimators

Company Estimator Phone Extension Fax Email
Venator Contracting Group LLC Erin Toth 586-229-2428 301 586-229-2430 erins@venatorcontracting.com

If you have project-related questions, please contact your contractor or use the "Submit Question" tab.
If you are having technical difficulties downloading, please email support@pipelinesuite.com or call 949-222-0400.