Project Info
|
Project # |
24-045 |
Project Name
|
GC - Larry's Creek Water Treatment Plant
|
Location
|
Jersey Shore Area Joint Water Authority
|
Address
|
Map It
977 Water Company Road
|
City
|
Jersey Shore
|
State
|
PA
|
Zip
|
17740
|
Bid Date
|
January 8, 2025
|
Bid Time
|
12:00 PM
|
|
|
Scope |
This project consists of the construction of a new 2.0 million gallon per day capacity water treatment facility including earthwork, access roads, mechanical piping and equipment, membrane filtration system (cartridge type), chemical feed and storage systems, finish water clearwell, wastewater holding tanks, solids drying beds, a chemical pretreatment building, water transmission main, yard piping, instrumentation control and monitoring system, HVAC work, plumbing work, building architectural work, structural steel and reinforced concrete construction, site improvements and all required appurtenances.
|
Plans |
|
Other Info |
We are requesting quotes for the following Specification Sections:
DIVISION 02 - EXISTING CONDITIONS
Section 02 11 00: Demolition Section 02 41 00: Selective Demolition
DIVISION 03 - CONCRETE
Section 03 11 00: Concrete Forming and Accessories Section 03 20 00: Concrete Reinforcing Section 03 30 00: Cast-In-Place Concrete Section 03 41 00: Precast, Prestressed Structural Concrete Section 03 62 00: Non-Shrink Grouting
DIVISION 04 - MASONRY
Section 04 05 13: Masonry Mortars Section 04 22 00: Concrete Unit Masonry
DIVISION 05 - METALS
Section 05 12 00: Structural Steel Section 05 12 13: Miscellaneous Metals Section 05 14 00: Structural Aluminum Section 05 52 00: Aluminum Handrail, Grating, Stair Tread, and Access Hatches
DIVISION 06 - WOOD, PLASTICS AND COMPOSITES
Section 06 10 00: Rough Carpentry Section 06 11 00: Wood Framing Section 06 17 53: Plate Connected Wood Trusses Section 06 80 00: Structural Fiberglass Reinforced Plastic Section 06 81 00: Fiberglass (FRP) Grating, Ladders, Handrail and Stairs
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
Section 07 16 16: Crystalline Waterproofing Section 07 21 00: Building Insulation and Vapor Barrier Section 07 42 93: Vinyl Ceiling Section 07 46 00: Siding, Soffit, and Fascia Section 07 61 13: Aluminum Standing Seam Roofing Section 07 71 23: Gutters and Downspouts Section 07 84 00: Firestopping Section 07 92 00: Joint Sealants
DIVISION 08 - OPENINGS
Section 08 16 13: Fiberglass Reinforced Plastic Doors, Panels and Frames Section 08 33 23: Overhead Coiling Doors Section 08 71 00: Finish Hardware Section 08 80 00: Glass and Glazing
DIVISION 09 - FINISHES
Section 09 29 00: Gypsum Wallboard Systems Section 09 50 00: Vinyl Ceiling Section 09 51 23: Suspended Acoustical Ceiling Section 09 62 19: Laminate Flooring System Section 09 91 23: Painting
DIVISION 10 - SPECIALTIES
Section 10 14 00: Identifying Devices Section 10 28 13: Toilet Accessories Section 10 40 00: Building Specialties Section 10 51 13: Metal Lockers
DIVISION 11 - EQUIPMENT
Section 11 00 00: Equipment General Provisions Section 11 05 13: Motors Section 11 53 00: Laboratory Furniture, Apparatus, Instruments and Supplies
DIVISION 22 - PLUMBING
Section 22 05 05: Plumbing Basic Materials Section 22 05 10: Plumbing Pipe and Pipe Fittings Section 22 05 16: Drainage and Vent Systems Section 22 05 19: Tri-Gauges Section 22 05 20: Plumbing Specialties Section 22 05 25: Plumbing Valves Section 22 05 29: Supports and Anchors Section 22 05 53: Plumbing Identification Section 22 05 53.13: Mechanical Identification and Painting Section 22 07 19: Plumbing Insulation Section 22 10 05: Domestic Water Piping Section 22 10 06: Plumbing Piping Specialties Section 22 11 26: Facility Liquefied-Petroleum Gas Piping Section 22 40 00: Plumbing Fixtures Section 22 40 01: Trench Drains
DIVISION 23 - HEATING, VENTILATION AND AIR-CONDITIONING (HVAC)
Section 23 05 00: Basic Requirements for HVAC Work Section 23 05 93: Testing, Adjusting, and Balancing For HVAC Section 23 07 13: Duct Installation Section 23 08 00: Commissioning of HVAC Section 23 23 00: Refrigeration Piping Systems Section 23 31 00: HVAC Ducts and Casings Section 23 34 00: Exhaust Fans Section 23 37 13: Air Outlets and Inlets Section 23 55 33: Fuel-Fired Unit Heater Section 23 62 46: Variable Refrigerant Flow Units Section 23 82 39: Electrical Heating Equipment Section 23 84 16: Mechanical Dehumidification Units
DIVISION 31 - EARTHWORK
Section 31 00 00: Site Work General Provisions Section 31 11 00: Clearing and Grubbing Section 31 20 00: Earthmoving Section 31 22 19.13: Topsoil, Seeding, and Mulching Section 31 23 19: Dewatering Section 31 25 00: Erosion and Sediment Control
DIVISION 32 - EXTERIOR IMPROVEMENTS
Section 32 16 00: Paving, Surfacing, Walkways and Curbs Section 32 31 12: Chain Link Cantilever Slide Gates Section 32 31 13: Chain Link Fence and Gates Section 32 94 00: Trees, Plants, and Other Restoration
DIVISION 33 - UTILITIES
Section 33 01 10.58: Disinfection of Water Treatment Facility Section 33 01 12: Piping System Testing and Disinfection Section 33 05 31.11: Non pressure PVC Pipe Section 33 05 31.13: PVC Pressure Pipe Section 33 05 31.35: PVC/CPVC Valves Section 33 05 33.13: Corrugated Polyethylene Pipe
DIVISION 40 - PROCESS INTERCONNECTIONS
Section 40 00 00: Piping System General Provisions Section 40 05 07: Hangers and Supports for Process Piping Section 40 05 17: Copper Pipe Section 40 05 19: Ductile Iron Pipe Section 40 05 23: Stainless Steel Pipe Section 40 05 24: Steel Pipe Section 40 05 51: Valves General Provisions Section 40 05 59.23: Slide Gates Section 40 05 61: Gate Valves Section 40 05 62: Plug Valves Section 40 05 64: Butterfly Valves Section 40 05 65: Check Valves Section 40 79 00: Miscellaneous Valves and Piping Specialties Section 40 98 00: Piping System Appurtenances
DIVISION 42 - PROCESS DRYING EQUIPMENT
Section 42 30 00: Sand Drying Beds
DIVISION 43 - PROCESS GAS AND LIQUID HANDLING, PURIFICATION AND STORAGE EQUIPMENT
Section 43 23 01: Pumping Equipment Section 43 41 13: Caustic Soda Welded Steel Chemical Storage Tanks Section 43 41 43: Flat Bottom, High-Density Crosslinked Polyethylene Bulk Chemical Storage Tanks Section 43 41 45: Sodium Hypochlorite FRP Chemical Storage Tanks
DIVISION 46 - WATER AND WASTEWATER EQUIPMENT
Section 46 33 00: Liquid Chemical Feed Systems Section 46 41 11: Vertical Shaft Turbine Mixers Section 46 61 33: Packaged Microfiltration System
|
|