Library Xeriscape Project

Project Files

  • Xeriscape Examples
    • Aluminum Signage Example.docx Uploaded: 4/1/2025 (1404 kb)
    • rocks-desert-landscaping.jpg Uploaded: 4/1/2025 (66 kb)
    • xeriscape_landscape_ideas.jpg Uploaded: 4/1/2025 (185 kb)
  • Location Pictures
    • Library Front Door.JPG Uploaded: 4/1/2025 (2945 kb)
    • Library South Side.JPG Uploaded: 4/1/2025 (3209 kb)
    • Library West Side.JPG Uploaded: 4/1/2025 (2562 kb)
    • Library Xeriscape Project Location.pdf Uploaded: 4/1/2025 (460 kb)
  • Project Bid Documents and Scope
    • IFB Library Xeriscape Project Bid Documents.pdf Uploaded: 4/15/2025 (281 kb)
    • Library Xeriscape Project Scope 1.pdf Uploaded: 4/2/2025 (130 kb)

Project Info

Project #
Project Name Library Xeriscape Project
Location Town of Parker
Address Map It 1314 W 11th St
City Parker
State AZ
Zip 85344
Bid Date June 12, 2025
Bid Time 10:00 AM
Site Meeting Date May 27, 2025
Site Meeting Time 10:00 AM
 
Scope

Library Xeriscape Project Scope

This document outlines the details for the xeriscape landscaping project, which aims to create a water-conserving landscape with an educational trail.

Project Goals and Benefits

  • Implement a xeriscape design to minimize water usage.

  • Create a handicap accessible trail that will be used by the Library to educate the public about the importance of water conservation.

  • Enhance the aesthetic appeal of the area.

  • Utilize water retention techniques in the design. 

  • Promote awareness about sustainable landscaping practices.

  • Lower maintenance costs.

  • Enhanced biodiversity.

  • Educational opportunities for the community.

Plant Selection

The following is a list of plants selected for the project based on their drought tolerance and suitability for the local climate.


  • Hybrid Palo Verde Tree

  • Willow Acacia Tree

  • Saguaro 

  • Desert Spoon 

  • Medicinal Aloe 

  • Flame Honeysuckle

  • Ocotillo

  • Yellow Bird of Paradise

  • Black Dalea

  • Chuparosa

  • Guayacuan

Material

  • Water Irrigation Control Valves with Nodes or use existing control panel

  • Isolation Valves

  • Desert color irrigation boxes 

  • Drip Irrigation System

  • Bubblers for Trees

  • Crushed Granite

  • 1” minus

  • River Rock

  • Large Boulders

  • Heavy Duty Landscape Fabric for Weed Prevention

Educational Trail

The educational trail should feature the following:


  • The trail needs to meet ADA guidelines using crushed granite as the surface.

  • The trail color design should be different from the majority of the other crushed granite colors.

  • The trail entrances should be flush with the sidewalks and all other areas should slope into the project area for water retention.

  • Signage

    • Sign Type: Aluminum with metal stakes. See example.

    • Sign Info

      • Plant name (common and scientific)

      • Description and characteristics

      • Water requirements

      • Native region

Project Budget

The proposal will need to include a budget for the project with the following line item expenses:


  • Demolition

  • Trees, plants and materials

  • Irrigation system

  • Educational trail

  • Labor and mobilization

  • Total

Project Design

The proposal will need to include artist renderings of each area.

Project Schedule

The proposal will need to include an estimated project schedule.

Project Location and Square Footage

The project is located at 1001 Navajo Ave. in Parker Arizona and is approximately 19,416 square feet.

Demolition

  • Remove the top soil and dead bermuda grass down below the edge of the sidewalks to allow for crushed granite and rock installation.

  • Remove all existing irrigation that can’t be used for the purpose of this project.

  • Remove all existing plants and shrubs with the exception of the yellow bell near the entrance to the Library.

Installation

  • Layout design

  • Grade per design.

  • Install irrigation system, valves, valve boxes etc.

  • Install heavy duty landscape fabric.

  • Plant trees, shrubs and succulents.

  • Place granite, river rock, 1” minus and boulders.

  • Install signage.

Plans Design plans or renderings to be provided by the contractor with the bid. See overhead picture and existing condition pictures.
Other Info Project address is 1001 Navajo Ave.
Contacts
Type Company Estimator Phone Extension Fax Email
Public Works Director Town of Parker Steve Ziegler 928-669-9265 1007 pwdirector@townofparkeraz.us

If you have project-related questions, please contact your contractor or use the "Submit Question" tab.
If you are having technical difficulties downloading, please email support@pipelinesuite.com or call 949-222-0400.