GC - Cumberland County Shared Ride

Project Files

  • Specifications
    • Advertisement for Bids Uploaded: 10/7/2025 (420 kb)
    • Bid Attachments Uploaded: 10/7/2025 (569 kb)
    • Bid Breakdown Uploaded: 10/7/2025 (371 kb)
    • Bid Submittal Checklist Uploaded: 10/7/2025 (349 kb)
    • Bidders Qualifications Uploaded: 10/7/2025 (408 kb)
    • Construction Milestone Schedule Uploaded: 10/7/2025 (296 kb)
    • Contract Requirements Uploaded: 10/7/2025 (377 kb)
    • Cover Table of Contents 1 Uploaded: 10/7/2025 (551 kb)
    • Cover Table of Contents 2 Uploaded: 10/7/2025 (810 kb)
    • Div 01 General Requirements Uploaded: 10/7/2025 (3384 kb)
    • Div 02 Existing Conditions Uploaded: 10/7/2025 (776 kb)
    • Div 03 Concrete Uploaded: 10/7/2025 (864 kb)
    • Div 05 Metals Uploaded: 10/7/2025 (805 kb)
    • Div 06 Wood Plastic Composite Uploaded: 10/7/2025 (552 kb)
    • Div 07 Thermal Moisture Protection Uploaded: 10/7/2025 (1637 kb)
    • Div 08 Openings Uploaded: 10/7/2025 (1577 kb)
    • Div 09 Finishes Uploaded: 10/7/2025 (1491 kb)
    • Div 10 Specialties Uploaded: 10/7/2025 (1223 kb)
    • Div 11 Equipment Uploaded: 10/7/2025 (743 kb)
    • Div 12 Furnishings Uploaded: 10/7/2025 (683 kb)
    • Div 13 Special Construction Uploaded: 10/7/2025 (346 kb)
    • Div 21 Fire Suppression Uploaded: 10/7/2025 (1128 kb)
    • Div 22 Plumbing Uploaded: 10/7/2025 (1991 kb)
    • Div 23 HVAC Uploaded: 10/7/2025 (2816 kb)
    • Div 26 Electrical Uploaded: 10/7/2025 (3557 kb)
    • Div 27 Communications Uploaded: 10/7/2025 (714 kb)
    • Div 28 Electronic Safety Security Uploaded: 10/7/2025 (998 kb)
    • Div 31 Earthwork Uploaded: 10/7/2025 (1594 kb)
    • Div 32 Exterior Improvements Uploaded: 10/7/2025 (3045 kb)
    • Div 33 Utilities Uploaded: 10/7/2025 (845 kb)
    • Div 46 Water Wastewater Equipment Uploaded: 10/7/2025 (465 kb)
    • Diverse Business Participation Uploaded: 10/7/2025 (2714 kb)
    • Existing Conditions Information Uploaded: 10/7/2025 (289 kb)
    • General Conditions of the Contract Uploaded: 10/7/2025 (1455 kb)
    • Geotechnical Addendum Memo Uploaded: 10/7/2025 (4213 kb)
    • Geotechnical Data Uploaded: 10/7/2025 (288 kb)
    • Instructions to Bidders Uploaded: 10/7/2025 (436 kb)
    • List of Drawing Sheets Uploaded: 10/7/2025 (880 kb)
    • PA Steel Requirements ST-1 Uploaded: 10/7/2025 (305 kb)
    • PA Steel Requirements ST-2 Uploaded: 10/7/2025 (307 kb)
    • PA Steel Requirements ST-3 Uploaded: 10/7/2025 (326 kb)
    • PA Steel Requirements ST-4 Uploaded: 10/7/2025 (323 kb)
    • Standard Form of Agreement Uploaded: 10/7/2025 (1202 kb)
    • Thumbs-1 Uploaded: 10/7/2025 (24 kb)
    • Wage Rates Uploaded: 10/7/2025 (251 kb)
    • _Combined Specifications Uploaded: 10/7/2025 (39111 kb)
  • Addenda
    • Addendum 1 Uploaded: 10/16/2025 (508 kb)
    • Addendum 2 Uploaded: 10/16/2025 (704 kb)
    • Addendum 3 Uploaded: 10/16/2025 (508 kb)
    • Addendum 4 Uploaded: 10/16/2025 (392 kb)
    • Addendum 5 Uploaded: 10/16/2025 (8465 kb)
    • Thumbs Uploaded: 10/16/2025 (37 kb)
  • Drawings
    • Mechanical
      • M-001 GENERAL HVAC INFORMATION Uploaded: 10/7/2025 (145 kb)
      • M-100 ADMIN BLDG. HVAC PLAN Uploaded: 10/7/2025 (356 kb)
      • M-110 ADMIN BUILDING SECTION VIEW Uploaded: 10/7/2025 (181 kb)
      • M-200 BUS STORAGE BUILDING HVAC PLAN Uploaded: 10/7/2025 (255 kb)
      • M-210 BUS STORAGE BUILDING SECTION VIEW Uploaded: 10/7/2025 (177 kb)
      • M-300 BUS WASH BUILDING HVAC PLAN Uploaded: 10/7/2025 (236 kb)
      • M-400 HVAC DETAILS Uploaded: 10/7/2025 (208 kb)
      • M-500 HVAC SCHEDULES Uploaded: 10/7/2025 (160 kb)
      • M-600 HVAC CONTROLS Uploaded: 10/7/2025 (176 kb)
      • Thumbs-6 Uploaded: 10/7/2025 (18 kb)
    • General
      • G-001 COVER SHEET Uploaded: 10/7/2025 (763 kb)
      • G-002 GENERAL NOTES LEGEND Uploaded: 10/7/2025 (150 kb)
      • G-003 DRAWING INDEX Uploaded: 10/7/2025 (143 kb)
      • G-004 BUILDING CODE DATA Uploaded: 10/7/2025 (170 kb)
      • G-005 BUILDING CODE DATA Uploaded: 10/7/2025 (137 kb)
      • LS-100 ADMINISTRATION BLDG. LIFE SAFETY PLAN Uploaded: 10/7/2025 (312 kb)
      • LS-200 BUS STORAGE BLDG. LIFE SAFETY PLAN Uploaded: 10/7/2025 (230 kb)
      • LS-300 BUS WASH BLDG. LIFE SAFETY PLAN Uploaded: 10/7/2025 (512 kb)
      • Thumbs-5 Uploaded: 10/7/2025 (16 kb)
    • Structural
      • S-001 STRUCTURAL NOTES TECHNICAL TERMS LEGEND Uploaded: 10/7/2025 (182 kb)
      • S-002 STATEMENT OF SPECIAL INSPECTIONS AND TABLES Uploaded: 10/7/2025 (139 kb)
      • S-003 COMPONENTS CLADDING WIND LOAD DIAGRAMS Uploaded: 10/7/2025 (141 kb)
      • S-100 ADMIN BUILDING -FOUNDATION PLAN Uploaded: 10/7/2025 (187 kb)
      • S-101 ADMIN BUILDING -SLAB PLAN Uploaded: 10/7/2025 (177 kb)
      • S-102 ADMIN BUILDING -TRUSS BOTTOM CHORD BRACING PLAN Uploaded: 10/7/2025 (191 kb)
      • S-103 ADMIN BUILDING -ROOF FRAMING PLAN Uploaded: 10/7/2025 (166 kb)
      • S-120 ADMIN BUILDING -GIRT FRAMING _ BRACING ELEVATIONS Uploaded: 10/7/2025 (146 kb)
      • S-121 ADMIN BUILDING -GIRT FRAMING _ BRACING ELEVATIONS Uploaded: 10/7/2025 (155 kb)
      • S-122 ADMIN BUILDING -TRUSS ELEVATION _ BUILDING SECTION Uploaded: 10/7/2025 (254 kb)
      • S-130 ADMIN BUILDING -FOUNDATIONSECTIONS DETAILS Uploaded: 10/7/2025 (450 kb)
      • S-140 ADMIN BUILDING -STEEL FRAMING SECTIONS DETAILS Uploaded: 10/7/2025 (231 kb)
      • S-141 ADMIN BUILDING -STEEL FRAMING SECTIONS DETAILS Uploaded: 10/7/2025 (261 kb)
      • S-150 ADMIN BUILDING -COLUMN SCHEDULE Uploaded: 10/7/2025 (146 kb)
      • S-200 BUS STORAGE BUILDING -COMPOSITE FOUNDATION PLAN Uploaded: 10/7/2025 (163 kb)
      • S-201 BUS STORAGE BUILDING -FOUNDATION PLAN -AREA A Uploaded: 10/7/2025 (165 kb)
      • S-202 BUS STORAGE BUILDING -FOUNDATION PLAN -AREA B Uploaded: 10/7/2025 (169 kb)
      • S-203 BUS STORAGE BUILDING -COMPOSITE SLAB ON GRADE PLAN Uploaded: 10/7/2025 (169 kb)
      • S-204 BUS STORAGE BUILDING -SLAB PLAN -AREA A Uploaded: 10/7/2025 (192 kb)
      • S-205 BUS STORAGE BUILDING -SLAB PLAN -AREA B Uploaded: 10/7/2025 (167 kb)
      • S-206 BUS STORAGE-COMPOSITE TRUSS BOTTOM CHORD BRACING Uploaded: 10/7/2025 (154 kb)
      • S-207 BUS STORAGE-TRUSS BOTTOM CHORD BRACING-A Uploaded: 10/7/2025 (191 kb)
      • S-208 BUS STORAGE -TRUSS BOTTOM CHORD BRACING-B Uploaded: 10/7/2025 (164 kb)
      • S-209 BUS STORAGE BUILDING -COMPOSITE ROOF FRAMING Uploaded: 10/7/2025 (155 kb)
      • S-210 BUS STORAGE BUILDING -ROOF FRAMING-A Uploaded: 10/7/2025 (166 kb)
      • S-211 BUS STORAGE BUILDING -ROOF FRAMING-B Uploaded: 10/7/2025 (170 kb)
      • S-220 BUS STORAGE BUILDING -GIRT FRAMING BRACING Uploaded: 10/7/2025 (209 kb)
      • S-221 BUS STORAGE BUILDING -GIRT FRAMING BRACING Uploaded: 10/7/2025 (167 kb)
      • S-222 BUS STORAGE BUILDING -GIRT FRAMING BRACING Uploaded: 10/7/2025 (192 kb)
      • S-223 BUS STORAGE BUILDING -TRUSS ELEVATION Uploaded: 10/7/2025 (198 kb)
      • S-230 BUS STORAGE BUILDING -FOUNDATION Uploaded: 10/7/2025 (632 kb)
      • S-240 BUS STORAGE BUILDING -STEEL FRAMING Uploaded: 10/7/2025 (231 kb)
      • S-241 BUS STORAGE BUILDING -STEEL FRAMING Uploaded: 10/7/2025 (201 kb)
      • S-242 BUS STORAGE BUILDING -STEEL FRAMING Uploaded: 10/7/2025 (114 kb)
      • S-250 BUS STORAGE BUILDING -COLUMN SCHEDULE Uploaded: 10/7/2025 (227 kb)
      • S-300 BUS WASH BUILDING -FOUNDATION PLAN Uploaded: 10/7/2025 (181 kb)
      • S-301 BUS WASH BUILDING -SLAB PLAN Uploaded: 10/7/2025 (186 kb)
      • S-302 BUS WASH -TRUSS BOTTOM CHORD BRACING Uploaded: 10/7/2025 (155 kb)
      • S-303 BUS WASH BUILDING -ROOF FRAMING PLAN Uploaded: 10/7/2025 (154 kb)
      • S-320 BUS WASH BUILDING -GIRT FRAMING BRACING Uploaded: 10/7/2025 (150 kb)
      • S-321 BUS WASH BUILDING -GIRT FRAMING BRACING Uploaded: 10/7/2025 (167 kb)
      • S-322 BUS WASH BUILDING -TRUSS ELEVATION Uploaded: 10/7/2025 (170 kb)
      • S-330 BUS WASH BUILDING -FOUNDATION Uploaded: 10/7/2025 (969 kb)
      • S-340 BUS WASH BUILDING -STEEL FRAMING Uploaded: 10/7/2025 (240 kb)
      • S-341 BUS WASH BUILDING -STEEL FRAMING Uploaded: 10/7/2025 (132 kb)
      • S-350 BUS WASH BUILDING -COLUMN SCHEDULE Uploaded: 10/7/2025 (143 kb)
      • S-400 TYPICAL CONCRETE DETAILS Uploaded: 10/7/2025 (269 kb)
      • S-401 TYPICAL CONCRETE PAD SECTIONS Uploaded: 10/7/2025 (163 kb)
      • S-402 TYPICAL STEEL DETAILS Uploaded: 10/7/2025 (165 kb)
      • Thumbs-8 Uploaded: 10/7/2025 (28 kb)
    • Plumbing
      • P-001 GENERAL INFORMATION Uploaded: 10/7/2025 (139 kb)
      • P-100 ADMIN BLDG. PLUMBING PLAN Uploaded: 10/7/2025 (403 kb)
      • P-110 ADMIN BLDG. SANITARY PLAN Uploaded: 10/7/2025 (630 kb)
      • P-120 ADMIN BLDG. PLUMBING SCHEDULES Uploaded: 10/7/2025 (147 kb)
      • P-200 BUS STORAGE BUILDING DOMESTIC WATER PLAN Uploaded: 10/7/2025 (202 kb)
      • P-210 BUS STORAGE BUILDING SANITARY PLAN Uploaded: 10/7/2025 (174 kb)
      • P-300 BUS WASH DOMESTIC WATER PLAN Uploaded: 10/7/2025 (164 kb)
      • P-310 BUS WASH SANITARY PLAN Uploaded: 10/7/2025 (180 kb)
      • P-400 PLUMBING DETAILS Uploaded: 10/7/2025 (190 kb)
      • Thumbs-7 Uploaded: 10/7/2025 (16 kb)
    • Architectural
      • A-001 ARCHITECTURAL SITE PLAN Uploaded: 10/7/2025 (332 kb)
      • A-002 TYPICAL ADA Uploaded: 10/7/2025 (271 kb)
      • A-100 ADMIN BLDG. FLOOR PLAN Uploaded: 10/7/2025 (460 kb)
      • A-101 ADMIN BLDG. FURNITURE PLAN Uploaded: 10/7/2025 (262 kb)
      • A-102 ADMIN BLDG. SIGNAGE SCHEDULE Uploaded: 10/7/2025 (289 kb)
      • A-103 ADMIN BLDG. FLOOR FINISH PLAN Uploaded: 10/7/2025 (843 kb)
      • A-104 ADMIN BLDG. RCP Uploaded: 10/7/2025 (504 kb)
      • A-110 ADMIN BLDG. SLAB PLAN Uploaded: 10/7/2025 (156 kb)
      • A-120 ADMIN BLDG. ELEVATIONS SECTION Uploaded: 10/7/2025 (186 kb)
      • A-160 ADMIN BLDG. DOOR WINDOW SCHEDULE Uploaded: 10/7/2025 (300 kb)
      • A-161 FRAME TYPE AND DETAILS Uploaded: 10/7/2025 (254 kb)
      • A-162 ADMIN BLDG. FINISH SCHEDULE Uploaded: 10/7/2025 (147 kb)
      • A-170 ADMIN BLDG. ENLARGED TOILET PLAN Uploaded: 10/7/2025 (252 kb)
      • A-171 ADMIN BLDG. TOILET ELEVATIONS Uploaded: 10/7/2025 (340 kb)
      • A-172 ADMIN BLDG. SHOWER ELEVATIONS Uploaded: 10/7/2025 (195 kb)
      • A-173 ADMIN BLDG. VESTIBULE PLAN DETAILS Uploaded: 10/7/2025 (200 kb)
      • A-180 ADMIN BLDG. BREAKROOM CASEWORK Uploaded: 10/7/2025 (176 kb)
      • A-190 ADMIN BLDG. OPERABLE PARTITION Uploaded: 10/7/2025 (259 kb)
      • A-191 ADMIN BLDG. DETAILS Uploaded: 10/7/2025 (204 kb)
      • A-192 ADMIN BLDG. PLAN SECTION Uploaded: 10/7/2025 (637 kb)
      • A-200 BUS STORAGE BLDG. FLOOR PLAN SIGNAGE Uploaded: 10/7/2025 (363 kb)
      • A-220 BUS STORAGE BLDG. ELEVATIONS Uploaded: 10/7/2025 (221 kb)
      • A-221 BUS STORAGE BLDG. SECTIONS Uploaded: 10/7/2025 (175 kb)
      • A-260 BUS STORAGE BLDG. DOOR WINDOW Uploaded: 10/7/2025 (145 kb)
      • A-300 BUS WASH BLDG. FLOOR PLAN Uploaded: 10/7/2025 (197 kb)
      • A-310 BUS WASH BLDG. EQUIPMENT PLAN Uploaded: 10/7/2025 (1037 kb)
      • A-320 BUS WASH BUILDING ELEVATIONS Uploaded: 10/7/2025 (160 kb)
      • A-321 BUS WASH BLDG. SECTION Uploaded: 10/7/2025 (561 kb)
      • A-360 BUS WASH BLDG. DOOR SCHEDULE Uploaded: 10/7/2025 (143 kb)
      • A-400 ROOF DETAILS Uploaded: 10/7/2025 (463 kb)
      • A-401 SECTIONS AND DETAILS Uploaded: 10/7/2025 (421 kb)
      • A-402 BUS WASH BUS STORAGE BLDG. OH DOOR Uploaded: 10/7/2025 (289 kb)
      • A-420 CLEARANCE BAR FENCE AND GATE DETAILS Uploaded: 10/7/2025 (506 kb)
      • A-600 PARTITION TYPES Uploaded: 10/7/2025 (180 kb)
      • A-900 3D VIEWS Uploaded: 10/7/2025 (12826 kb)
      • Thumbs-2 Uploaded: 10/7/2025 (14 kb)
    • Electrical
      • E-001 LEGEND NOTES AND ABBREVIATIONS Uploaded: 10/7/2025 (174 kb)
      • E-010 SITE POWER PLAN Uploaded: 10/7/2025 (319 kb)
      • E-100 ADMIN BLDG. POWER PLAN Uploaded: 10/7/2025 (269 kb)
      • E-110 ADMIN BLDG. LIGHTING PLAN Uploaded: 10/7/2025 (506 kb)
      • E-120 ADMIN BLDG. DATA SPECIAL SYSTEMS PLAN Uploaded: 10/7/2025 (217 kb)
      • E-130 ADMIN BLDG. SCHEDULES Uploaded: 10/7/2025 (162 kb)
      • E-200 BUS STORAGE BUILDING POWER PLAN Uploaded: 10/7/2025 (198 kb)
      • E-210 BUS STORAGE BUILDING LIGHTING PLAN Uploaded: 10/7/2025 (214 kb)
      • E-220 BUS STORAGE BUILDING SYSTEMS PLAN Uploaded: 10/7/2025 (197 kb)
      • E-230 BUS STORAGE SCHEDULES Uploaded: 10/7/2025 (140 kb)
      • E-300 BUS WASH BLDG. POWER PLAN Uploaded: 10/7/2025 (466 kb)
      • E-310 BUS WASH BLDG. LIGHTING PLAN Uploaded: 10/7/2025 (155 kb)
      • E-320 BUS WASH BLDG. SYSTEMS PLAN Uploaded: 10/7/2025 (157 kb)
      • E-330 BUS WASH SCHEDULES Uploaded: 10/7/2025 (139 kb)
      • E-400 ELECTRICAL DISTRIBUTION Uploaded: 10/7/2025 (157 kb)
      • E-401 ELECTRICAL DETAILS Uploaded: 10/7/2025 (181 kb)
      • E-402 ELECTRICAL DETAILS CONT. Uploaded: 10/7/2025 (1220 kb)
      • E-403 FIRE ALARM RISER DIAGRAM Uploaded: 10/7/2025 (135 kb)
      • Thumbs-4 Uploaded: 10/7/2025 (26 kb)
    • Civil
      • C-002 CIVIL GENERAL NOTES Uploaded: 10/7/2025 (2209 kb)
      • C-100 EXISTING CONDITIONS DEMO Uploaded: 10/7/2025 (2333 kb)
      • C-101 E S CONTROL PLAN Uploaded: 10/7/2025 (4050 kb)
      • C-102 E S CONTROL DETAIL Uploaded: 10/7/2025 (3080 kb)
      • C-103 E S CONTROL DETAIL Uploaded: 10/7/2025 (2629 kb)
      • C-104 PCSM PLAN Uploaded: 10/7/2025 (3774 kb)
      • C-200 SITE PLAN INDEX Uploaded: 10/7/2025 (4464 kb)
      • C-202 SITE PLAN NORTH Uploaded: 10/7/2025 (3016 kb)
      • C-203 SITE PLAN SOUTH Uploaded: 10/7/2025 (3108 kb)
      • C-204 SITE DETAILS Uploaded: 10/7/2025 (2249 kb)
      • C-205 SITE DETAILS Uploaded: 10/7/2025 (2305 kb)
      • C-206 SITE DETAILS Uploaded: 10/7/2025 (2148 kb)
      • C-207 SITE DETAILS Uploaded: 10/7/2025 (12268 kb)
      • C-208 SITE DETAILS Uploaded: 10/7/2025 (7176 kb)
      • C-300 MASS GRADING PLAN NORTH Uploaded: 10/7/2025 (2940 kb)
      • C-301 MASS GRADING PLAN SOUTH Uploaded: 10/7/2025 (3062 kb)
      • C-302 MASS GRADING SIDEWALK PLAN Uploaded: 10/7/2025 (3165 kb)
      • C-303 SPOT ELEVATION NORTH Uploaded: 10/7/2025 (3602 kb)
      • C-304 SPOT ELEVATION SOUTH Uploaded: 10/7/2025 (3729 kb)
      • C-305 SPOT ELEVATION SIDEWALK Uploaded: 10/7/2025 (3406 kb)
      • C-306 CUT AND FILL PLAN Uploaded: 10/7/2025 (3873 kb)
      • C-400 STORM SEWER PLAN NORTH Uploaded: 10/7/2025 (2957 kb)
      • C-401 STORM SEWER PLAN SOUTH Uploaded: 10/7/2025 (3669 kb)
      • C-402 STORM SEWER PROFILES Uploaded: 10/7/2025 (3692 kb)
      • C-403 SANITARY SEWER PLAN WEST Uploaded: 10/7/2025 (2346 kb)
      • C-404 SANITARY SEWER PLAN NORTH Uploaded: 10/7/2025 (2952 kb)
      • C-405 SANITARY SEWER PLAN SOUTH Uploaded: 10/7/2025 (3058 kb)
      • C-406 SANITARY SEWER PROFILES Uploaded: 10/7/2025 (2205 kb)
      • DP-001 DEVELOPMENT PLAN Uploaded: 10/7/2025 (3709 kb)
      • Thumbs-3 Uploaded: 10/7/2025 (15 kb)
    • Thumbs-9 Uploaded: 10/7/2025 (13 kb)
    • _COMBINED ORIGINAL BID SET Uploaded: 10/7/2025 (109999 kb)
  • Attachment E.pdf Uploaded: 10/9/2025 (83 kb)

Project Info

Project # 25-030
Project Name GC - Cumberland County Shared Ride
Location Susquehanna Regional Transportation Authority
Address Map It 1601 Ritner Highway
City Carlisle
State PA
Zip 17013
Bid Date November 3, 2025
Bid Time 12:00 PM
 
Scope
This multi prime prevailing wage project consists of the new construction of a  multimodal facility which includes grading and construction of a one-story Bus Storage Building, Administrative Building, and Bus Wash Building. The site work includes but not limited to multiple parking areas, a concrete bus loop, and other improvements including sidewalks, lighting, and security measures.

We are requesting quotes for the following scopes of work:
 
Division 02 Existing Conditions
024119 Selective Demolition

Division 03 Concrete
030500 common Work Results for Concrete
031000 Concrete Forming and Accessories
032000 Concrete Reinforcing
033000 Cast in Place Concrete
033543 Polished Concrete Flooring
033547 Concrete Floor Sealer

Division 05 Metals
050500 Common Work Results for Metal
052100 Structural Steel Framing
053100 Steel Decking
054000 Cold Formed Metal Framing
055000 Metal Fabrications
055300 Metal Gratings

Division 06 Woods and Plastic
060500 Common Work Results for Wood, Plastics, and Composites
061000 Rough Carpentry
067413 Fiberglass Reinforced Gratings

Division 07 Thermal and Moisture Protection
070500 Common Work Results for Thermal and Moisture Protection
071616 Crystalline Waterproofing
072100 Thermal Insulation
072616 Below Grade Wapor Retarders
074100 Metal Roof Panels
074213 Metal Wall Panels
074213.1 Metal Wall Panels (Insulated)
076200 Sheet Metal Flashing and Trim
076536 Prefabricated Pipe Penetration Flashing
077200 Roof Accessories
078413 Penetration Firestopping
079200 Joint Sealants

Division 08 Openings
080500 Common Work Results for Openings
081113 Hollow Metal Doors and Frames
082200 Fiberglass (FRP) Doors and Frames
083113 Access Doors and Frames
083613 Sectional Doors
084113 Aluminum Framed Entrances and Storefronts
085113 Aluminum Windows
085619 Pass Through Windows
087100 Door Hardware
087123 Commercial Door Operators
088000 Glazing
089119 Fixed Louvers

Division 09 Finishes
090500 Common Work Results for Finishes
092216 Non Structural Metal Framing
092900 Gypsum Board
093013 Ceramic Tiling
095113 Acoustical Panel Ceilings
096500 Resilient Flooring and Accessories
096800 Carpeting
098100 Acoustic Insulation
099000 Painting
099600 High Performance Coatings

Division 10 Specialties
100500 Common Work Results for Specialties
101116 Markerboard
101423 Panel Signage
101423.16 Room Identification Panel Signage
102113.17 Phenolic Core Toilet Compartments
102226 Operable Partition
102800 Toilet Room Accessories
104116 Emergency Key Storage Cabinets
104400 Fire Protection Specialties
105113 Metal Lockers
105550 Key Storage Cabinet

Division 11 Equipment
111100 Drive Through Wash System
111233.21 Overhead Clearance Bars
113013 Kitchen Appliances
115200 Audio Visual Equipment
115219 Television Monitor Supports

Division 12 Furnishing
122113 Horizontal Louver Blinds
123216 Manufactured Plastic Laminate Clad Casework
123616.16 Solid Surfacing Countertops
125000 Furniture

Division 13 Special Construction
134713 Cathodic Protection

Division 31 Earthwork
311000 Site Clearing
312000 Earth Moving
312113 Radon Mitigation
313116 Termite Control
313219 Lime Dried Subgrade Treatment

Division 32 Exterior Improvements
321216 Asphalt Paving
321313 Concrete Paving
321373 Concrete Paving Joint Sealants
321400 Interlocking Concrete Unit Pavers
321713 Parking Bumpers
321723 Pavement Markings
321726 Tactile Warning Surfacing
323113 Chain Link Fences and Gates
329200 Turf and Grasses
329300 Plants

Division 33 Utilities
334200 Stormwater Conveyance
334600 Subdrainage

Division 46 Water and Wastewater Equipment
462514 Oil and Water Separators







   
Plans
Other Info

Notices

If you are looking for attached files related to a Notice, go back to the Home tab ("Project Files" are on the right side).
Title Created By Created On
GC - Cumberland County Shared Ride Valerie Slagle 10/7/2025
Cumberland Shared Ride Facility Attachment E Valerie Slagle 10/9/2025
Notice of Addendum 4 Valerie Slagle 10/10/2025
Notice of Addendum 5 Valerie Slagle 10/16/2025

Lobar, Inc. Contacts

Company Contact Title Phone Extension Fax Email
Lobar, Inc Aaron Eichelberger Estimator 717-432-9728 AaronE@lobar.com
Lobar, Inc. Eric Bowen Estimator 717-432-9728 4289 eric.bowen@lobar.com
Lobar, Inc. Lou Marchi Estimator 717-432-9728 4217 717-432-9162 lou.marchi@lobar.com

If you have project-related questions, please contact your contractor or use the "Submit Question" tab.
If you are having technical difficulties downloading, please email support@preconsuite.com or call 949-222-0400.