EC - Horton Hall and Seth Grove Stadium

Project Files

  • Addenda
    • Addendum 1 Uploaded: 1/16/2026 (4003 kb)
    • Thumbs-2 Uploaded: 1/16/2026 (43 kb)
  • Drawings
    • CS001 COVER SHEET Uploaded: 1/2/2026 (332 kb)
    • E001 ELECTRICAL SYMBOLS NOTES Uploaded: 1/2/2026 (213 kb)
    • E101 HORTON HALL-BASEMENT-POWER-NEW WORK Uploaded: 1/2/2026 (225 kb)
    • E102 HORTON HALL-FIRST FLR-POWER-NEW WORK Uploaded: 1/2/2026 (223 kb)
    • E103 HORTON HALL-SECOND FLR-POWER-NEW WORK Uploaded: 1/2/2026 (224 kb)
    • E104 HORTON HALL-THIRD FLR-POWER-NEW WORK Uploaded: 1/2/2026 (223 kb)
    • E105 HORTON HALL-ATTIC FLR-POWER-NEW WORK Uploaded: 1/2/2026 (190 kb)
    • E106 SETH GROVE STADIUM-FIRST FLR-POWER-NEW WORK Uploaded: 1/2/2026 (261 kb)
    • E107 SETH GROVE STADIUM-SITE-POWER-NEW WORK Uploaded: 1/2/2026 (239 kb)
    • E401 ELECTRICAL DETAILS Uploaded: 1/2/2026 (245 kb)
    • E501 HORTON HALL-ELECTRICAL PANEL SCHEDULES Uploaded: 1/2/2026 (240 kb)
    • E502 HORTON HALL-ELECTRICAL PANEL SCHEDULES Uploaded: 1/2/2026 (235 kb)
    • E503 HORTON HALL-ELECTRICAL PANEL SCHEDULES Uploaded: 1/2/2026 (235 kb)
    • E504 HORTON HALL-ELECTRICAL PANEL SCHEDULES Uploaded: 1/2/2026 (194 kb)
    • E505 SETH GROVE STADIUM-ELECTRICAL PANEL SCHEDULES Uploaded: 1/2/2026 (240 kb)
    • E506 SETH GROVE STADIUM-ELECTRICAL PANEL SCHEDULES Uploaded: 1/2/2026 (204 kb)
    • E510 HORTON HALL-ONE LINE DIAGRAM-DEMOLITION Uploaded: 1/2/2026 (231 kb)
    • E511 HORTON HALL-ONE LINE DIAGRAM-NEW WORK Uploaded: 1/2/2026 (238 kb)
    • E515 ELECTRICAL FEEDER SCHEDULE Uploaded: 1/2/2026 (190 kb)
    • ED101 HORTON HALL-BASEMENT-POWER-DEMOLITION Uploaded: 1/2/2026 (213 kb)
    • ED102 HORTON HALL-FIRST FLR-POWER-DEMOLITION Uploaded: 1/2/2026 (214 kb)
    • ED103 HORTON HALL-SECOND FLR-POWER-DEMOLITION Uploaded: 1/2/2026 (213 kb)
    • ED104 HORTON HALL-THIRD FLR-POWER-DEMOLITION Uploaded: 1/2/2026 (214 kb)
    • ED105 HORTON HALL-ATTIC-POWER-DEMOLITION Uploaded: 1/2/2026 (190 kb)
    • ED106 SETH GROVE STADIUM-FIRST FLR-POWER-DEMOLITION Uploaded: 1/2/2026 (250 kb)
    • ED107 SETH GROVE STADIUM-SITE-POWER-DEMOLITION Uploaded: 1/2/2026 (245 kb)
    • Thumbs-1 Uploaded: 1/2/2026 (26 kb)
    • _COMBINED SET Uploaded: 1/2/2026 (5915 kb)
  • Specifications
    • Bid Form Uploaded: 1/2/2026 (195 kb)
    • Contract Bond Form Uploaded: 1/2/2026 (173 kb)
    • Cover Table of Contents Uploaded: 1/2/2026 (103 kb)
    • Division 01 General Requirements Uploaded: 1/2/2026 (630 kb)
    • Division 26 Electrical Uploaded: 1/2/2026 (497 kb)
    • General Conditions Uploaded: 1/2/2026 (374 kb)
    • General Instructions to Bidders Uploaded: 1/2/2026 (172 kb)
    • Insurance Rider Uploaded: 1/2/2026 (136 kb)
    • Prevailing Wage Rates Uploaded: 1/2/2026 (66 kb)
    • SDB Requirements Instructions Uploaded: 1/2/2026 (159 kb)
    • SDB Solicitation Form Uploaded: 1/2/2026 (197 kb)
    • Special Instructions to Bidders Uploaded: 1/2/2026 (159 kb)
    • Standard Form of Contract Uploaded: 1/2/2026 (187 kb)
    • Thumbs Uploaded: 1/2/2026 (39 kb)
    • _Combined Specifications Uploaded: 1/2/2026 (1569 kb)
  • Horton Hall and Seth Grove Gear RFQ 1.13.26.pdf Uploaded: 1/13/2026 (87 kb)
  • Screenshot MDP1 2026-01-13 092653.png Uploaded: 1/13/2026 (749 kb)
  • Screenshot MDP1 2026-01-13 092751.png Uploaded: 1/13/2026 (809 kb)

Project Info

Project # E26-001
Project Name EC - Horton Hall and Seth Grove Stadium
Location Shippensburg University
Address Map It 1871 Old Main Dr.
City Shippensburg
State PA
Zip 17257
Bid Date January 28, 2026
Bid Time 11:00 AM
 
Scope Work included under this project at Shippensburg University, Shippensburg Township, 
Cumberland County, Pennsylvania consists of the replacement of existing panelboards and 
feeders, and extension/reconnection of the associated branch circuit wiring to the new 
panelboards in Horton Hall and at the Seth Grove Stadium. Contractor shall perform the 
Overcurrent Coordination Study and Arc Flash Study required for each of the installations.  
Work shall include, but is not necessarily limited to, the furnishing of all labor, superintendence, 
materials, tools and equipment to perform all work necessary to complete all work shown in the 
construction documents at the satisfaction of, and subject to approval of, the Professional and 
the University. 

Lobar is requesting pricing for the following;
- Excavation
- Panelboards
- Overcurrent Protective Device Coordination Study


Plans
Other Info

Notices

If you are looking for attached files related to a Notice, go back to the Home tab ("Project Files" are on the right side).
Title Created By Created On
EC - Horton Hall and Seth Grove Stadium Valerie Slagle 1/2/2026
Notice of Addendum 1 Valerie Slagle 1/16/2026

Lobar, Inc. Contacts

Company Contact Title Phone Extension Fax Email
Lobar, Inc. James Hair Estimator 717-432-9728 4290 james.hair@lobar.com

If you have project-related questions, please contact your contractor or use the "Submit Question" tab.
If you are having technical difficulties downloading, please email support@preconsuite.com or call 949-222-0400.