GC - Thaddeus Stevens College – Multipurpose Dorm Building

Project Files

  • Addenda
    • Addendum 1 Uploaded: 1/9/2026 (90 kb)
    • Thumbs Uploaded: 1/9/2026 (29 kb)
  • Specifications
    • Administrative Procedures for Construction Contracts Uploaded: 1/9/2026 (638 kb)
    • Appendix M Standard Construction Provisions Uploaded: 1/9/2026 (301 kb)
    • Bid Protest Uploaded: 1/9/2026 (125 kb)
    • Bid Withdrawal Uploaded: 1/9/2026 (124 kb)
    • Cover Table of Contents Uploaded: 1/9/2026 (973 kb)
    • DGS 417-48 RFP 12162025 Uploaded: 1/9/2026 (895 kb)
    • Div 01 General Requirements Uploaded: 1/9/2026 (1764 kb)
    • Div 02 Existing Conditions Uploaded: 1/9/2026 (436 kb)
    • Div 03 Concrete Uploaded: 1/9/2026 (2022 kb)
    • Div 04 Masonry Uploaded: 1/9/2026 (882 kb)
    • Div 05 Metals Uploaded: 1/9/2026 (925 kb)
    • Div 06 Wood Plastic Composite Uploaded: 1/9/2026 (1149 kb)
    • Div 07 Thermal Moisture Protection Uploaded: 1/9/2026 (2195 kb)
    • Div 08 Openings Uploaded: 1/9/2026 (3018 kb)
    • Div 09 Finishes Uploaded: 1/9/2026 (1786 kb)
    • Div 10 Specialties Uploaded: 1/9/2026 (1221 kb)
    • Div 11 Equipment Uploaded: 1/9/2026 (5784 kb)
    • Div 12 Furnishings Uploaded: 1/9/2026 (488 kb)
    • Div 14 Conveying Equipment Uploaded: 1/9/2026 (1034 kb)
    • Div 21 Fire Suppression Uploaded: 1/9/2026 (1148 kb)
    • Div 22 Plumbing Uploaded: 1/9/2026 (2028 kb)
    • Div 23 HVAC Uploaded: 1/9/2026 (3031 kb)
    • Div 26 Electrical Uploaded: 1/9/2026 (3531 kb)
    • Div 27 Communications Uploaded: 1/9/2026 (662 kb)
    • Div 28 Security Uploaded: 1/9/2026 (880 kb)
    • Div 31 Earthwork Uploaded: 1/9/2026 (46435 kb)
    • Div 32 Site Improvements Uploaded: 1/9/2026 (1103 kb)
    • Div 33 Utilities Uploaded: 1/9/2026 (848 kb)
    • Enhanced Minimum Wage Uploaded: 1/9/2026 (53 kb)
    • Finding SDBs and VBEs Uploaded: 1/9/2026 (1187 kb)
    • General Conditions for the Construction Contract Uploaded: 1/9/2026 (909 kb)
    • Prevailing Wage Rates Uploaded: 1/9/2026 (2271 kb)
    • Public Works Employment Verification Form Uploaded: 1/9/2026 (198 kb)
    • SDB_Participation_Form_2024.01.26 Uploaded: 1/9/2026 (1035 kb)
    • Standard Construction Contract and Contract Bond Uploaded: 1/9/2026 (144 kb)
    • Thumbs-1 Uploaded: 1/9/2026 (54 kb)
    • VBE_Participation_Form_2024.01.26 Uploaded: 1/9/2026 (805 kb)
    • Worker Protection Form Public Works Uploaded: 1/9/2026 (74 kb)
    • _Combined Specifications Uploaded: 1/9/2026 (75128 kb)
  • Drawings
    • General
      • CS-1.1 - COVER SHEET Uploaded: 1/9/2026 (1608 kb)
      • CS-1.2 - COVER SHEET Uploaded: 1/9/2026 (1607 kb)
      • G-1 - GENERAL PROJECT NOTES Uploaded: 1/9/2026 (1030 kb)
      • G-2 - CODE REVIEW Uploaded: 1/9/2026 (4160 kb)
      • G-3 - CODE PLAN -OCCUPANCY Uploaded: 1/9/2026 (3222 kb)
      • Thumbs-5 Uploaded: 1/9/2026 (26 kb)
    • Food Service
      • QF-A100 - KEY PLAN Uploaded: 1/9/2026 (1421 kb)
      • QF-A112 - RESPONSIBILITY SCHEDULE Uploaded: 1/9/2026 (1251 kb)
      • QF-A113 - RESPONSIBILITY SCHEDULE Uploaded: 1/9/2026 (1240 kb)
      • QF-B120 - LEVEL 1 EQUIPMENT PLAN Uploaded: 1/9/2026 (1482 kb)
      • QF-B121 - LEVEL 1 OIL RECLAMATION TANK STORAGE Uploaded: 1/9/2026 (1270 kb)
      • QF-B130 - LEVEL 1 EQUIPMENT SCHEDULE Uploaded: 1/9/2026 (1273 kb)
      • QF-B131 - LEVEL 1 EQUIPMENT SCHEDULE Uploaded: 1/9/2026 (1267 kb)
      • QF-B132 - LEVEL 1 3D VIEW Uploaded: 1/9/2026 (1813 kb)
      • QF-B133 - LEVEL 1 3D VIEW Uploaded: 1/9/2026 (2371 kb)
      • QF-B134 - LEVEL 1 3D VIEW Uploaded: 1/9/2026 (1798 kb)
      • QF-B200 - LEVEL 1 ELECTRICAL ROUGH-IN PLAN Uploaded: 1/9/2026 (1465 kb)
      • QF-B300 - LEVEL 1 PLUMBING ROUGH-IN PLAN Uploaded: 1/9/2026 (1486 kb)
      • QF-B310 - ROUGH-IN DETAILS Uploaded: 1/9/2026 (1355 kb)
      • QF-B400 - KITCHEN ELEVATIONS Uploaded: 1/9/2026 (1456 kb)
      • QF-B401 - KITCHEN ELEVATIONS Uploaded: 1/9/2026 (1421 kb)
      • QF-B402 - KITCHEN ELEVATIONS Uploaded: 1/9/2026 (1444 kb)
      • QF-B403 - KITCHEN ELEVATIONS Uploaded: 1/9/2026 (1459 kb)
      • QF-B404 - KITCHEN ELEVATIONS Uploaded: 1/9/2026 (1387 kb)
      • QF-B405 - STORAGE ELEVATIONS Uploaded: 1/9/2026 (1373 kb)
      • QF-C120 - LEVEL 2 EQUIPMENT PLAN Uploaded: 1/9/2026 (1459 kb)
      • QF-C121 - LEVEL 2 PERSPECTIVES Uploaded: 1/9/2026 (2606 kb)
      • QF-C130 - LEVEL 2 EQUIPMENT SCHEDULE Uploaded: 1/9/2026 (1259 kb)
      • QF-C131 - LEVEL 2 EQUIPMENT SCHEDULE Uploaded: 1/9/2026 (1271 kb)
      • QF-C140 - LEVEL 2 3D VIEWS Uploaded: 1/9/2026 (2179 kb)
      • QF-C200 - LEVEL 2 ELECTRICAL ROUGH-IN PLAN Uploaded: 1/9/2026 (1497 kb)
      • QF-C201 - LEVEL 2 LED LIGHTING PLAN Uploaded: 1/9/2026 (1453 kb)
      • QF-C300 - LEVEL 2 PLUMBING ROUGH-IN PLAN Uploaded: 1/9/2026 (1514 kb)
      • QF-C400 - FOOD HALL ELEVATIONS Uploaded: 1/9/2026 (1392 kb)
      • QF-C401 - FOOD HALL ELEVATIONS Uploaded: 1/9/2026 (1375 kb)
      • QF-C402 - FOOD HALL ELEVATIONS Uploaded: 1/9/2026 (1403 kb)
      • QF-C403 - FOOD HALL ELEVATIONS Uploaded: 1/9/2026 (1402 kb)
      • QF-C404 - FOOD HALL ELEVATIONS Uploaded: 1/9/2026 (1360 kb)
      • QF-C405 - DISHWASHING ROOM ELEVATIONS Uploaded: 1/9/2026 (1370 kb)
      • QF-X500 - MILLWORK Uploaded: 1/9/2026 (1602 kb)
      • QF-X501 - MILLWORK Uploaded: 1/9/2026 (1516 kb)
      • QF-X502 - MILLWORK Uploaded: 1/9/2026 (1442 kb)
      • QF-X503 - MILLWORK Uploaded: 1/9/2026 (1582 kb)
      • QF-X504 - MILLWORK Uploaded: 1/9/2026 (1507 kb)
      • QF-X505 - MILLWORK Uploaded: 1/9/2026 (1463 kb)
      • QF-X506 - MILLWORK Uploaded: 1/9/2026 (1391 kb)
      • QF-X507 - MILLWORK Uploaded: 1/9/2026 (1655 kb)
      • QF-X508 - MILLWORK Uploaded: 1/9/2026 (1601 kb)
      • QF-X509 - MILLWORK Uploaded: 1/9/2026 (1523 kb)
      • QF-X510 - MILLWORK Uploaded: 1/9/2026 (1609 kb)
      • QF-X511 - MILLWORK Uploaded: 1/9/2026 (1574 kb)
      • QF-X512 - MILLWORK Uploaded: 1/9/2026 (1730 kb)
      • QF-X513 - MILLWORK Uploaded: 1/9/2026 (1476 kb)
      • QF-X514 - MILLWORK Uploaded: 1/9/2026 (1392 kb)
      • QF-X515 - MILLWORK Uploaded: 1/9/2026 (1466 kb)
      • QF-X516 - MILLWORK Uploaded: 1/9/2026 (1465 kb)
      • QF-X600 - SNEEZEGUARDS Uploaded: 1/9/2026 (1402 kb)
      • QF-X630 - POS REQUIREMENTS Uploaded: 1/9/2026 (1474 kb)
      • QF-X640 - COOKING OIL STORAGE TANKS Uploaded: 1/9/2026 (1835 kb)
      • QF-X641 - COOKING OIL STORAGE TANKS Uploaded: 1/9/2026 (3534 kb)
      • QF-X700 - EXHAUST HOODS Uploaded: 1/9/2026 (1350 kb)
      • QF-X701 - HOOD SPECS Uploaded: 1/9/2026 (1896 kb)
      • QF-X702 - HOOD SPECS Uploaded: 1/9/2026 (1694 kb)
      • QF-X703 - HOOD SPECS Uploaded: 1/9/2026 (1686 kb)
      • QF-X704 - HOOD SPECS Uploaded: 1/9/2026 (1647 kb)
      • QF-X705 - HOOD SPECS Uploaded: 1/9/2026 (1508 kb)
      • QF-X706 - HOOD SPECS Uploaded: 1/9/2026 (1831 kb)
      • QF-X707 - HOOD SPECS Uploaded: 1/9/2026 (1755 kb)
      • QF-X708 - HOOD SPECS Uploaded: 1/9/2026 (1880 kb)
      • QF-X709 - HOOD SPECS Uploaded: 1/9/2026 (1981 kb)
      • QF-X710 - HOOD SPECS Uploaded: 1/9/2026 (1926 kb)
      • QF-X711 - HOOD SPECS Uploaded: 1/9/2026 (1822 kb)
      • QF-X712 - HOOD SPECS Uploaded: 1/9/2026 (1910 kb)
      • QF-X713 - HOOD SPECS Uploaded: 1/9/2026 (1904 kb)
      • QF-X714 - HOOD SPECS Uploaded: 1/9/2026 (1458 kb)
      • QF-X715 - HOOD SPECS Uploaded: 1/9/2026 (1902 kb)
      • QF-X720 - ROTARY DISH ACCUMULATOR Uploaded: 1/9/2026 (1893 kb)
      • QF-X730 - DISH MACHINE SPECS Uploaded: 1/9/2026 (1981 kb)
      • QF-X731 5 25 25 - DISH MACHINE SPECS Uploaded: 1/9/2026 (1491 kb)
      • QF-X732 - DISH MACHINE SPECS Uploaded: 1/9/2026 (1400 kb)
      • QF-X800 - WALK-IN BOXES Uploaded: 1/9/2026 (1417 kb)
      • QF-X801 - WALK-IN BOX SPECS Uploaded: 1/9/2026 (1741 kb)
      • QF-X802 - WALK-IN BOX SPECS Uploaded: 1/9/2026 (1950 kb)
      • QF-X803 - WALK-IN BOX SPECS Uploaded: 1/9/2026 (1863 kb)
      • QF-X900 - MILLWORK CONSTRUCTION DETAILS Uploaded: 1/9/2026 (1368 kb)
      • QF-X901 - MILLWORK CONSTRUCTION DETAILS Uploaded: 1/9/2026 (1353 kb)
      • QF-X903 - TYPICAL DETAILS Uploaded: 1/9/2026 (1458 kb)
      • QF-X904 - TYPICAL DETAILS Uploaded: 1/9/2026 (1371 kb)
      • QF-X905 - BEVERAGE CONDUIT DETAIL Uploaded: 1/9/2026 (1370 kb)
      • QF-X906 - SPECIAL CONDITIONS Uploaded: 1/9/2026 (1416 kb)
      • QF-X907 - SPECIAL CONDITIONS Uploaded: 1/9/2026 (1436 kb)
      • Thumbs-4 Uploaded: 1/9/2026 (20 kb)
    • Plumbing
      • P1-01 - BASEMENT FLOOR -KITCHEN LEVEL PLAN Uploaded: 1/9/2026 (1394 kb)
      • P1-02 - FIRST FLOOR -DINING LEVEL PLAN Uploaded: 1/9/2026 (1264 kb)
      • P1-03 - ECOND FLOOR -DORM LEVEL PLAN Uploaded: 1/9/2026 (994 kb)
      • P1-04 - THIRD FLOOR -DORM LEVEL PLAN Uploaded: 1/9/2026 (941 kb)
      • P1-05 - FOURTH FLOOR -DORM LEVEL PLAN Uploaded: 1/9/2026 (1049 kb)
      • P1-06 - ROOF PLAN Uploaded: 1/9/2026 (817 kb)
      • P4-01 - ENLARGED BASEMENT FLOOR -KITCHEN LEVEL Uploaded: 1/9/2026 (1427 kb)
      • P4-02 - ENLARGED FIRST FLOOR -DINING LEVEL Uploaded: 1/9/2026 (1061 kb)
      • P4-03 - ENLARGED RESTROOM PLANS Uploaded: 1/9/2026 (1353 kb)
      • P4-04 - ENLARGED LAUNDRY KITCHENETTE Uploaded: 1/9/2026 (914 kb)
      • P4-05 - ENLARGED MECHANICAL ROOM PLAN Uploaded: 1/9/2026 (806 kb)
      • P5-01 - DETAILS Uploaded: 1/9/2026 (772 kb)
      • P6-01 - DOMESTIC WATER RISER DIAGRAM Uploaded: 1/9/2026 (833 kb)
      • P6-02 - DOMESTIC WATER RISER DIAGRAM Uploaded: 1/9/2026 (820 kb)
      • P6-03 - SANITARY RISER DIAGRAM Uploaded: 1/9/2026 (819 kb)
      • P6-04 - SANITARY RISER DIAGRAM Uploaded: 1/9/2026 (791 kb)
      • P7-01 - SCHEDULES NOTES AND LEGEND Uploaded: 1/9/2026 (770 kb)
    • HVAC
      • H1-01 - DUCTWORK -BASEMENT -KITCHEN LEVEL PLAN Uploaded: 1/9/2026 (1420 kb)
      • H1-02 - DUCTWORK -FIRST FLOOR -DINING LEVEL PLAN Uploaded: 1/9/2026 (1503 kb)
      • H1-03 - DUCTWORK -SECOND FLOOR -DORM LEVEL PLAN Uploaded: 1/9/2026 (1022 kb)
      • H1-04 - DUCTWORK -THIRD FLOOR -DORM LEVEL PLAN Uploaded: 1/9/2026 (997 kb)
      • H1-05 - DUCTWORK -FOURTH FLOOR -DORM LEVEL PLAN Uploaded: 1/9/2026 (997 kb)
      • H1-06 - MECHANICAL -ROOF PLAN Uploaded: 1/9/2026 (861 kb)
      • H2-01 - PIPING -BASEMENT -KITCHEN LEVEL PLAN Uploaded: 1/9/2026 (1326 kb)
      • H2-02 - PIPING -FIRST FLOOR -DINING LEVEL PLAN Uploaded: 1/9/2026 (1330 kb)
      • H2-03 - PIPING -SECOND FLOOR -DORM LEVEL PLAN Uploaded: 1/9/2026 (971 kb)
      • H2-04 - PIPING -THIRD FLOOR -DORM LEVEL PLAN Uploaded: 1/9/2026 (947 kb)
      • H2-05 - PIPING -FOURTH FLOOR -DORM LEVEL PLAN Uploaded: 1/9/2026 (1059 kb)
      • H3-01 - SECTIONS ENLARGED PLANS Uploaded: 1/9/2026 (820 kb)
      • H5-01 - DETAILS Uploaded: 1/9/2026 (806 kb)
      • H6-01 - PIPING DIAGRAM Uploaded: 1/9/2026 (798 kb)
      • H6-02 - NATURAL GAS RISER DIAGRAM Uploaded: 1/9/2026 (763 kb)
      • H6-03 - CONTROLS DIAGRAMS Uploaded: 1/9/2026 (1105 kb)
      • H6-04 - CONTROLS DIAGRAMS Uploaded: 1/9/2026 (1069 kb)
      • H6-05 - CONTROLS DIAGRAMS Uploaded: 1/9/2026 (1068 kb)
      • H7-01 - SCHEDULES Uploaded: 1/9/2026 (1654 kb)
      • H7-02 - SCHEDULES NOTES AND LEGEND Uploaded: 1/9/2026 (3448 kb)
    • Electrical
      • E1.0 - BASEMENT FLOOR KITCHEN LEVEL-POWER Uploaded: 1/9/2026 (1453 kb)
      • E1.1 - FIRST FLOOR DINING LEVEL-POWER Uploaded: 1/9/2026 (1203 kb)
      • E1.2 - SECOND FLOOR DORM LEVEL-POWER Uploaded: 1/9/2026 (844 kb)
      • E1.3 - THIRD FLOOR DORM LEVEL-POWER Uploaded: 1/9/2026 (953 kb)
      • E1.4 - FOURTH FLOOR DORM LEVEL-POWER Uploaded: 1/9/2026 (951 kb)
      • E1.5 - ROOF -ELECTRICAL POWER PLAN Uploaded: 1/9/2026 (747 kb)
      • E2.0 - BASEMENT FLOOR KITCHEN LEVEL-LIGHTING Uploaded: 1/9/2026 (920 kb)
      • E2.1 - FIRST FLOOR DINING LEVEL-LIGHTING Uploaded: 1/9/2026 (1172 kb)
      • E2.2 - SECOND FLOOR DORM LEVEL-LIGHTING Uploaded: 1/9/2026 (1492 kb)
      • E2.3 - THIRD FLOOR DORM LEVEL-LIGHTING Uploaded: 1/9/2026 (1491 kb)
      • E2.4 - FOURTH FLOOR DORM LEVEL-LIGHTING Uploaded: 1/9/2026 (1538 kb)
      • E2.5 - ROOF LEVEL-LIGHTING Uploaded: 1/9/2026 (796 kb)
      • E4.1 - ENLARGED POWER PLANS Uploaded: 1/9/2026 (1163 kb)
      • E4.2 - ENLARGED POWER PLANS Uploaded: 1/9/2026 (1115 kb)
      • E5.1 - DETAILS Uploaded: 1/9/2026 (740 kb)
      • E6.1 - ONE LINE DIAGRAM -N_E DISTRIBUTION Uploaded: 1/9/2026 (756 kb)
      • E6.2 - ONE LINE DIAGRAM -NORMAL DISTRIBUTION Uploaded: 1/9/2026 (736 kb)
      • E6.3 - ONE LINE DIAGRAM -15KV DISTRIBUTION Uploaded: 1/9/2026 (772 kb)
      • E6.4 - ELECTRICAL PANEL SCHEDULES Uploaded: 1/9/2026 (785 kb)
      • E6.5 - ELECTRICAL PANEL SCHEDULES Uploaded: 1/9/2026 (796 kb)
      • E6.6 - ELECTRICAL PANEL SCHEDULES Uploaded: 1/9/2026 (794 kb)
      • E6.7 - ELECTRICAL PANEL SCHEDULES Uploaded: 1/9/2026 (783 kb)
      • E6.8 - ELECTRICAL PANEL SCHEDULES Uploaded: 1/9/2026 (768 kb)
      • E7.1 - LEGEND SCHEDULES AND NOTES Uploaded: 1/9/2026 (773 kb)
      • E7.2 - LIGHTING CONTROL DIAGRAMS Uploaded: 1/9/2026 (764 kb)
      • ES0.0 - ELECTRICAL SITE DEMOLITION PLAN Uploaded: 1/9/2026 (973 kb)
      • ES1.0 - ELECTRICAL SITE PLAN Uploaded: 1/9/2026 (1057 kb)
      • ES2.0 - ELECTRICAL SITE LIGHTING PLAN Uploaded: 1/9/2026 (2230 kb)
      • ES2.1 - SITE LUMINAIRE DETAILS Uploaded: 1/9/2026 (2908 kb)
      • Thumbs-3 Uploaded: 1/9/2026 (31 kb)
    • Civil
      • C-001 COVER SHEET Uploaded: 1/9/2026 (1611 kb)
      • C-002 GENERAL NOTES Uploaded: 1/9/2026 (1527 kb)
      • C-003 MATERIAL SPECIFICATIONS Uploaded: 1/9/2026 (1208 kb)
      • C-101 OA EXISTING CONDITIONS Uploaded: 1/9/2026 (2855 kb)
      • C-102 EXISTING CONDITIONS DEMO Uploaded: 1/9/2026 (3351 kb)
      • C-103 OVERALL SITE PLAN Uploaded: 1/9/2026 (1748 kb)
      • C-104 LAYOUT PLAN Uploaded: 1/9/2026 (1770 kb)
      • C-105 GRADING PLAN Uploaded: 1/9/2026 (3654 kb)
      • C-106 ACCESSIBILITY PLAN Uploaded: 1/9/2026 (1500 kb)
      • C-107 UTILITY PLAN Uploaded: 1/9/2026 (1952 kb)
      • C-108 LANDSCAPE DETAILS Uploaded: 1/9/2026 (2168 kb)
      • C-109 LANDSCAPE PLAN Uploaded: 1/9/2026 (2513 kb)
      • C-301 SEWER PROFILE Uploaded: 1/9/2026 (1232 kb)
      • C-302 STORM PROFILES Uploaded: 1/9/2026 (1887 kb)
      • C-303 BMP-1 FACILITY PLAN AND PROFILES Uploaded: 1/9/2026 (2090 kb)
      • C-501 SITE DETAILS Uploaded: 1/9/2026 (1331 kb)
      • C-502 SITE DETAILS Uploaded: 1/9/2026 (1404 kb)
      • C-503 SEWER-WATER DETAILS Uploaded: 1/9/2026 (1812 kb)
      • C-504 STORM DETAILS Uploaded: 1/9/2026 (1982 kb)
      • C-505 STORM DETAILS Uploaded: 1/9/2026 (2101 kb)
      • C-506 STORM DETAILS Uploaded: 1/9/2026 (1343 kb)
      • C-801 COVER SHEET Uploaded: 1/9/2026 (1685 kb)
      • C-802 GENERAL NOTES Uploaded: 1/9/2026 (1407 kb)
      • C-803 EXISTING CONDITIONS DEMO Uploaded: 1/9/2026 (3814 kb)
      • C-804 OVERALL ES CONTROL PLAN Uploaded: 1/9/2026 (3515 kb)
      • C-805 ES CONTROL PLAN Uploaded: 1/9/2026 (3976 kb)
      • C-806 ES CONTROL PLAN Uploaded: 1/9/2026 (2375 kb)
      • C-807 ES DETAILS Uploaded: 1/9/2026 (1362 kb)
    • Water Meter Vault
      • C-101-WMV - KING SOUTH BROAD SITE PLANS Uploaded: 1/9/2026 (1106 kb)
      • C-401-WMV - KING STREET VAULT PLAN Uploaded: 1/9/2026 (1116 kb)
      • C-402-WMV - BROAD STREET VAULT PLAN Uploaded: 1/9/2026 (1466 kb)
      • C-501-WMV - CIVIL CONSTRUCTION DETAILS Uploaded: 1/9/2026 (1097 kb)
      • E-101-WMV - KING STREET METER VAULT PLAN Uploaded: 1/9/2026 (1743 kb)
      • E-102-WMV - SOUTH BROAD STREET VAULT PLAN Uploaded: 1/9/2026 (1142 kb)
      • E-501-WMV - ELECTRICAL CONSTRUCTION DETAILS Uploaded: 1/9/2026 (1115 kb)
      • G-002-WMV - DRAWING LEGENDS Uploaded: 1/9/2026 (1243 kb)
      • GD-101-WMV - KING STREET METER VAULT PLANS Uploaded: 1/9/2026 (2499 kb)
      • GD-102-WMV - SOUTH BROAD STREET SITE PLAN Uploaded: 1/9/2026 (2530 kb)
    • Fire Protection
      • FP1-01 - BASEMENT FLOOR -KITCHEN LEVEL PLAN Uploaded: 1/9/2026 (977 kb)
      • FP1-02 - FIRST FLOOR -DINING LEVEL PLAN Uploaded: 1/9/2026 (1216 kb)
      • FP1-03 - SECOND FLOOR -DORM LEVEL PLAN Uploaded: 1/9/2026 (1430 kb)
      • FP1-04 -THIRD FLOOR -DORM LEVEL PLAN Uploaded: 1/9/2026 (1382 kb)
      • FP1-05 -FOURTH FLOOR -DORM LEVEL PLAN Uploaded: 1/9/2026 (1379 kb)
      • FP1-06 -ROOF PLAN Uploaded: 1/9/2026 (869 kb)
      • FP7-01 -SCHEDULES NOTES DETAILS Uploaded: 1/9/2026 (852 kb)
    • Fire Alarm
      • FA1.0 - BASEMENT KITCHEN LEVEL-FA SYSTEM Uploaded: 1/9/2026 (1284 kb)
      • FA1.1 - FIRST FLOOR DINING LEVEL-FA SYSTEM Uploaded: 1/9/2026 (1251 kb)
      • FA1.2 - SECOND FLOOR DORM LEVEL-FA SYSTEM Uploaded: 1/9/2026 (907 kb)
      • FA1.3 - THIRD FLOOR DORM LEVEL-FA SYSTEM Uploaded: 1/9/2026 (884 kb)
      • FA1.4 - FOUTH FLOOR DORM LEVEL-FA SYSTEM Uploaded: 1/9/2026 (995 kb)
      • FA1.5 - ROOF LEVEL-FA SYSTEM Uploaded: 1/9/2026 (847 kb)
      • FA7.1 - -FA SYSTEM LEGEND Uploaded: 1/9/2026 (737 kb)
    • Audio Visual
      • AV0.1 - INFRASTRUCTURE LEGENDS AND NOTES Uploaded: 1/9/2026 (1240 kb)
      • AV0.2 - INFRASTRUCTURE LEGENDS AND NOTES Uploaded: 1/9/2026 (1215 kb)
      • AV1.0 - BASEMENT-KITCHEN LEVEL INFRASTRUCTURE PLAN Uploaded: 1/9/2026 (1671 kb)
      • AV1.1 - FIRST FLR-DINING LEVEL INFRASTRUCTURE PLAN Uploaded: 1/9/2026 (1731 kb)
      • AV1.2 - SECOND FLR -DORM LEVEL INFRASTRUCTURE PLAN Uploaded: 1/9/2026 (1341 kb)
      • AV1.3 - THIRD FLR-DORM LEVEL INFRASTRUCTURE PLAN Uploaded: 1/9/2026 (1290 kb)
      • AV1.4 - FOURTH FLR-DORM LEVEL INFRASTRUCTURE PLAN Uploaded: 1/9/2026 (1293 kb)
      • AV2.0 - BASEMENT-KITCHEN LEVEL INFRASTRUCTURE RCP Uploaded: 1/9/2026 (1249 kb)
      • AV2.1 - FIRST FLR-DINING LEVEL INFRASTRUCTURE RCP Uploaded: 1/9/2026 (1572 kb)
      • AV2.2 - SECOND FLR -DORM LEVEL INFRASTRUCTURE RCP Uploaded: 1/9/2026 (1874 kb)
      • AV2.3 - THIRD FLR -DORM LEVEL INFRASTRUCTURE RCP Uploaded: 1/9/2026 (1886 kb)
      • AV2.4 - FOURTH FLR -DORM LEVEL INFRASTRUCTURE RCP Uploaded: 1/9/2026 (1881 kb)
      • AV5.1 - INFRASTRUCTURE ROOM RISERS Uploaded: 1/9/2026 (1179 kb)
      • AV7.1 - INFRASTRUCTURE ELEVATIONS Uploaded: 1/9/2026 (1265 kb)
      • AV8.1 - INFRASTRUCTURE DETAILS Uploaded: 1/9/2026 (1290 kb)
      • T3.0 - BASEMENT-KITCHEN LEVEL TELECOM Uploaded: 1/9/2026 (1677 kb)
      • T3.1 - FIRST FLOOR -DINING LEVEL TELECOM Uploaded: 1/9/2026 (1725 kb)
      • T3.2 - SECOND LEVEL-DORM LEVEL TELECOM Uploaded: 1/9/2026 (1344 kb)
      • T3.3 - THIRD FLOOR -DORM LEVEL TELECOM Uploaded: 1/9/2026 (1293 kb)
      • T3.4 - FOURTH FLOOR -DORM LEVEL TELECOM Uploaded: 1/9/2026 (1295 kb)
    • Telecommunications
      • T0.00 - TELECOMMUNICATIONS DRAWING LIST Uploaded: 1/9/2026 (1318 kb)
      • T1.00 - IT DEVICE LOCATIONS - BASEMENT - KITCHEN LEVEL Uploaded: 1/9/2026 (1308 kb)
      • T1.01 - IT DEVICE LOCATIONS - FIRST FLR - DINING LEVEL Uploaded: 1/9/2026 (1404 kb)
      • T1.02 - IT DEVICE LOCATIONS - SECOND FLR - DORM LEVEL Uploaded: 1/9/2026 (1096 kb)
      • T1.03 - IT DEVICE LOCATIONS - THIRD FLR - DORM LEVEL Uploaded: 1/9/2026 (1064 kb)
      • T1.04 - IT DEVICE LOCATIONS - FOURTH FLR - DORM LEVEL Uploaded: 1/9/2026 (1068 kb)
      • T1.05 - IT DEVICE LOCATIONS - ATTIC LEVEL Uploaded: 1/9/2026 (932 kb)
      • T2.01 - TELECOMMUNICATIONS RISER DIAGRAM Uploaded: 1/9/2026 (968 kb)
      • T3.01 - MDF LAYOUT ELEVATIONS Uploaded: 1/9/2026 (1097 kb)
      • T3.02 - TYPICAL IDF LAYOUT ELEVATIONS Uploaded: 1/9/2026 (1031 kb)
      • T4.01 - TELECOMMUNICATIONS INSTALLATION DETAILS Uploaded: 1/9/2026 (1186 kb)
    • Structural
      • S0.0 - COVER SHEET Uploaded: 1/9/2026 (1324 kb)
      • S0.1 - GENERAL NOTES Uploaded: 1/9/2026 (844 kb)
      • S0.2 - SPECIAL INSPECTIONS Uploaded: 1/9/2026 (825 kb)
      • S0.3 - SCHEDULES Uploaded: 1/9/2026 (821 kb)
      • S1.0 - BASEMENT-KITCHEN LEVEL FOUNDATION Uploaded: 1/9/2026 (852 kb)
      • S1.1 - FIRST FLR -DINING LEVEL FND FRAM Uploaded: 1/9/2026 (881 kb)
      • S1.2 - SECOND FLR -DORM LEVEL FRAMING Uploaded: 1/9/2026 (865 kb)
      • S1.3 - THIRD FLR - DORM LEVEL FRAMING Uploaded: 1/9/2026 (877 kb)
      • S1.4 - FOURTH FLR - DORM LEVEL FRAMING Uploaded: 1/9/2026 (879 kb)
      • S1.5 - ROOF FRAMING PLANS Uploaded: 1/9/2026 (879 kb)
      • S2.0 - FOUNDATION TYPICAL DETAILS Uploaded: 1/9/2026 (901 kb)
      • S2.1 - FOUNDATION TYPICAL DETAILS Uploaded: 1/9/2026 (842 kb)
      • S2.2 - FOUNDATION SECTIONS Uploaded: 1/9/2026 (907 kb)
      • S2.3 - FOUNDATION SECTIONS Uploaded: 1/9/2026 (817 kb)
      • S3.0 - FRAMING TYPICAL DETAILS Uploaded: 1/9/2026 (866 kb)
      • S3.1 - FRAMING TYPICAL DETAILS Uploaded: 1/9/2026 (870 kb)
      • S3.2 - FRAMING TYPICAL DETAILS Uploaded: 1/9/2026 (971 kb)
      • S3.3 - WOOD FRAMING DETAILS Uploaded: 1/9/2026 (905 kb)
      • S3.4 - FRAMING SECTIONS Uploaded: 1/9/2026 (872 kb)
      • S3.5 - FRAMING SECTIONS Uploaded: 1/9/2026 (814 kb)
      • S3.6 - FRAMING SECTIONS Uploaded: 1/9/2026 (851 kb)
    • Architectural
      • A1.0 - BASEMENT-KITCHEN LEVEL Uploaded: 1/9/2026 (3143 kb)
      • A1.1 - FIRST FLR -DINING LEVEL Uploaded: 1/9/2026 (3213 kb)
      • A1.10 - FOURTH FLR -WOOD FLR EDGE PLAN Uploaded: 1/9/2026 (1162 kb)
      • A1.11 - ROOF MECH WELL LEVEL WOOD FLR EDGE Uploaded: 1/9/2026 (1101 kb)
      • A1.2 - SECOND FLR -DORMITORY LEVEL Uploaded: 1/9/2026 (1629 kb)
      • A1.3 - THIRD FLR -DORMITORY LEVEL Uploaded: 1/9/2026 (1330 kb)
      • A1.4 - FOURTH FLR -DORMITORY LEVEL Uploaded: 1/9/2026 (1327 kb)
      • A1.5 - ROOF MECH WELL LEVEL Uploaded: 1/9/2026 (1232 kb)
      • A1.6 - BASEMENT-SLAB EDGE PLAN Uploaded: 1/9/2026 (1491 kb)
      • A1.7 - FIRST FLR -SLAB EDGE PLAN Uploaded: 1/9/2026 (1727 kb)
      • A1.8 - SECOND FLR -SLAB EDGE PLAN Uploaded: 1/9/2026 (1225 kb)
      • A1.9 - THIRD FLR -WOOD FLR EDGE PLAN Uploaded: 1/9/2026 (1167 kb)
      • A2.0 - BASEMENT FLR -KITCHEN LEVEL RCP Uploaded: 1/9/2026 (1026 kb)
      • A2.1 - FIRST FLR -DINING LEVEL RCP Uploaded: 1/9/2026 (1993 kb)
      • A2.2 - SECOND FLR -DORMITORY LEVEL RCP Uploaded: 1/9/2026 (2441 kb)
      • A2.3 - THIRD FLR -DORMITORY LEVEL RCP Uploaded: 1/9/2026 (2087 kb)
      • A2.4 - FOURTH FLR -DORMITORY LEVEL RCP Uploaded: 1/9/2026 (2073 kb)
      • A2.5 - MECH WELL RCP Uploaded: 1/9/2026 (841 kb)
      • A3.1 - WEST ELEVATION Uploaded: 1/9/2026 (2062 kb)
      • A3.2 - EAST ELEVATION Uploaded: 1/9/2026 (1985 kb)
      • A3.3 - SOUTH ELEVATION Uploaded: 1/9/2026 (2102 kb)
      • A3.4 - NORTH ELEVATION Uploaded: 1/9/2026 (1911 kb)
      • A4.1 - BUILDING SECTION Uploaded: 1/9/2026 (2379 kb)
      • A4.2 - BUILDING SECTION Uploaded: 1/9/2026 (3011 kb)
      • A4.3 - BUILDING SECTION Uploaded: 1/9/2026 (2069 kb)
      • A5.1 - INTERIOR ELEVATIONS -BASEMENT-CORRIDOR Uploaded: 1/9/2026 (1561 kb)
      • A5.10 - INTERIOR ELEVATIONS -FIRST FLR-MAIN ENTRY Uploaded: 1/9/2026 (1100 kb)
      • A5.11 - INTERIOR ELEVATIONS -FIRST FLR-MEETING MGR OFC Uploaded: 1/9/2026 (1568 kb)
      • A5.12 - INTERIOR ELEVATIONS -FIRST FLR-FOOD SERVICE Uploaded: 1/9/2026 (889 kb)
      • A5.13 - INTERIOR ELEVATIONS -FIRST FLR-FOOD SERVICE Uploaded: 1/9/2026 (810 kb)
      • A5.14 - INTERIOR ELEVATIONS -FIRST FLR-RESTROOMS Uploaded: 1/9/2026 (1371 kb)
      • A5.15 - INTERIOR ELEVATIONS -FIRST FLR-WOMENS REST Uploaded: 1/9/2026 (1332 kb)
      • A5.16 - INTERIOR ELEVATIONS -FIRST FLR-MENS REST Uploaded: 1/9/2026 (1269 kb)
      • A5.17 - INTERIOR ELEVATIONS -FIRST FLR-UNISEX Uploaded: 1/9/2026 (1301 kb)
      • A5.18 - INTERIOR ELEVATIONS -FIRST FLR-DINING HALL N WING Uploaded: 1/9/2026 (2301 kb)
      • A5.19 - INTERIOR ELEVATIONS -FIRST FLR-DINING HALL SE WING Uploaded: 1/9/2026 (1057 kb)
      • A5.2 - INTERIOR ELEVATIONS -BASEMENT-CORRIDOR Uploaded: 1/9/2026 (1104 kb)
      • A5.20 - INTERIOR ELEVATIONS -FIRST FLR-DINING HALL W WING Uploaded: 1/9/2026 (1353 kb)
      • A5.21 - INTERIOR ELEVATIONS -FIRST FLR-SERVERY Uploaded: 1/9/2026 (3287 kb)
      • A5.22 - INTERIOR ELEVATIONS -FIRST FLR-OFC MAIL Uploaded: 1/9/2026 (824 kb)
      • A5.23 - INTERIOR ELEVATIONS -UPPER FLRS-CORRIDOR Uploaded: 1/9/2026 (898 kb)
      • A5.24 - INTERIOR ELEVATIONS -UPPER FLRS-DORM ROOMS Uploaded: 1/9/2026 (1741 kb)
      • A5.25 - INTERIOR ELEVATIONS -UPPER FLRS-ACCESSIBLE DORM Uploaded: 1/9/2026 (1692 kb)
      • A5.26 - INTERIOR ELEVATIONS -UPPER FLRS-BATHROOM Uploaded: 1/9/2026 (1298 kb)
      • A5.27 - INTERIOR ELEVATIONS -UPPER FLRS-BATHROOM Uploaded: 1/9/2026 (1284 kb)
      • A5.28 - INTERIOR ELEVATIONS -UPPER FLRS-BATHROOM Uploaded: 1/9/2026 (994 kb)
      • A5.29 - INTERIOR ELEVATIONS -UPPER FLRS-KITCHENETTE Uploaded: 1/9/2026 (1021 kb)
      • A5.3 - INTERIOR ELEVATIONS -BASEMENT-KITCHEN Uploaded: 1/9/2026 (2744 kb)
      • A5.30 - INTERIOR ELEVATIONS -UPPER FLRS-KITCHENETTE Uploaded: 1/9/2026 (1039 kb)
      • A5.31 - INTERIOR ELEVATIONS -UPPER FLRS-LAUNDRY Uploaded: 1/9/2026 (988 kb)
      • A5.4 - INTERIOR ELEVATIONS -BASEMENT-KITCHEN Uploaded: 1/9/2026 (2952 kb)
      • A5.5 - INTERIOR ELEVATIONS -BASEMENT-KITCHEN Uploaded: 1/9/2026 (1307 kb)
      • A5.6 - INTERIOR ELEVATIONS -BASEMENT-FOOD SERVICE OFC Uploaded: 1/9/2026 (944 kb)
      • A5.7 - INTERIOR ELEVATIONS -BASEMENT-STAFF LOUNGE Uploaded: 1/9/2026 (1362 kb)
      • A5.8 - INTERIOR ELEVATIONS -BASEMENT -STAFF LOUNGE Uploaded: 1/9/2026 (979 kb)
      • A5.9 - INTERIOR ELEVATIONS -FIRST FLR-MAIN ENTRY Uploaded: 1/9/2026 (1528 kb)
      • A6.1 - WALL SECTIONS Uploaded: 1/9/2026 (1920 kb)
      • A6.10 - STAIR 01_ SERVICE STAIRS PLANS Uploaded: 1/9/2026 (1363 kb)
      • A6.11 - STAIR 01_ SERVICE STAIR SECTIONS Uploaded: 1/9/2026 (2170 kb)
      • A6.12 - STAIR 01_ SERVICE STAIR DETAILS Uploaded: 1/9/2026 (1708 kb)
      • A6.13 - STAIR 02 SECTIONS PLANS Uploaded: 1/9/2026 (3175 kb)
      • A6.14 - STAIR DETAILS Uploaded: 1/9/2026 (855 kb)
      • A6.15 - STAIR DETAILS Uploaded: 1/9/2026 (833 kb)
      • A6.16 - OVERHEAD COILING GRILLE DETAILS Uploaded: 1/9/2026 (1038 kb)
      • A6.17 - EXTERIOR STAIRS Uploaded: 1/9/2026 (1640 kb)
      • A6.18 - ROOF DETAILS Uploaded: 1/9/2026 (1408 kb)
      • A6.19 - EXTERIOR DETAILS Uploaded: 1/9/2026 (1310 kb)
      • A6.2 - WALL SECTIONS Uploaded: 1/9/2026 (1589 kb)
      • A6.20 - EXTERIOR DETAILS PROFILES Uploaded: 1/9/2026 (1204 kb)
      • A6.21 - EXTERIOR DETAILS PROFILES Uploaded: 1/9/2026 (1051 kb)
      • A6.22 - WOOD WINDOW DETAILS Uploaded: 1/9/2026 (1952 kb)
      • A6.23 - METAL WINDOW DETAILS Uploaded: 1/9/2026 (1359 kb)
      • A6.24 - MAIN ENTRY DOOR PLAN DETAILS Uploaded: 1/9/2026 (1525 kb)
      • A6.25 - MECH PENETRATION DETAILS Uploaded: 1/9/2026 (907 kb)
      • A6.26 - RETAINING WALL DETAILS Uploaded: 1/9/2026 (974 kb)
      • A6.27 - DORMER DETAILS Uploaded: 1/9/2026 (1065 kb)
      • A6.3 - WALL SECTIONS Uploaded: 1/9/2026 (1672 kb)
      • A6.4 - WALL SECTIONS Uploaded: 1/9/2026 (2008 kb)
      • A6.5 - WALL SECTIONS Uploaded: 1/9/2026 (1563 kb)
      • A6.6 - WALL SECTIONS Uploaded: 1/9/2026 (1371 kb)
      • A6.7 - ENLARGED PLAN DETAILS Uploaded: 1/9/2026 (1391 kb)
      • A6.8 - ELEVATOR SECTION PLANS Uploaded: 1/9/2026 (1286 kb)
      • A6.9 - ELEVATOR DETAILS Uploaded: 1/9/2026 (993 kb)
      • A7.1 - BASEMENT FIRST FLR-SERVERY Uploaded: 1/9/2026 (1711 kb)
      • A7.10 - CASEWORK DETAILS Uploaded: 1/9/2026 (1123 kb)
      • A7.11 - CASEWORK DETAILS Uploaded: 1/9/2026 (1044 kb)
      • A7.2 - FIRST FLR -SERVERY INTERIOR DETAILS Uploaded: 1/9/2026 (1201 kb)
      • A7.3 - FIRST FLR -INTERIOR DETAILS Uploaded: 1/9/2026 (1601 kb)
      • A7.4 - FIRST FLR -MAIN ENTRY LOBBY Uploaded: 1/9/2026 (1082 kb)
      • A7.5 - FIRST FLR -MAIN ENTRY LOBBY Uploaded: 1/9/2026 (1105 kb)
      • A7.6 - FIRST FLR -MAIN ENTRY LOBBY Uploaded: 1/9/2026 (1832 kb)
      • A7.7 - TYP UPPER FLRS -INTERIOR DETAILS Uploaded: 1/9/2026 (805 kb)
      • A7.8 - HM INTERIOR STOREFRONT -BASEMENT FIRST Uploaded: 1/9/2026 (1024 kb)
      • A7.9 - HM INTERIOR STOREFRONT -TYP UPPER FLOORS Uploaded: 1/9/2026 (1109 kb)
      • A8.1 - WOOD WINDOW TYPES SCHEDULE Uploaded: 1/9/2026 (793 kb)
      • A8.10 - SIGNAGE TYPES Uploaded: 1/9/2026 (4143 kb)
      • A8.11 - SIGNAGE -BASEMENT FLOOR -KITCHEN LEVEL Uploaded: 1/9/2026 (2764 kb)
      • A8.12 - SIGNAGE -FIRST FLOOR -DINING LEVEL Uploaded: 1/9/2026 (1942 kb)
      • A8.13 - SIGNAGE -SECOND FLOOR -DORM LEVEL Uploaded: 1/9/2026 (1077 kb)
      • A8.14 - SIGNAGE -THIRD FLOOR -DORM LEVEL Uploaded: 1/9/2026 (1034 kb)
      • A8.15 - SIGNAGE -FOURTH FLOOR -DORM LEVEL Uploaded: 1/9/2026 (1053 kb)
      • A8.2 - ALUM WINDOW SF TYPES SCHEDULE Uploaded: 1/9/2026 (818 kb)
      • A8.3 - DOOR TYPES Uploaded: 1/9/2026 (810 kb)
      • A8.4 - DOOR SCHEDULE Uploaded: 1/9/2026 (888 kb)
      • A8.5 - PARTITION SCHEDULE Uploaded: 1/9/2026 (1712 kb)
      • A8.6 - PARTITION SCHEDULE Uploaded: 1/9/2026 (851 kb)
      • A8.7 - FLOOR CEILING ASSEMBLY DETAILS Uploaded: 1/9/2026 (1005 kb)
      • A8.8 - MECH SHAFT WALL DETAILS Uploaded: 1/9/2026 (1257 kb)
      • A8.9 - SIGNAGE TYPES Uploaded: 1/9/2026 (951 kb)
      • A9.0 - BASEMENT FLOOR -KITCHEN LEVEL FINISH PLAN Uploaded: 1/9/2026 (3006 kb)
      • A9.1 - FIRST FLOOR -DINING LEVEL FINISH PLAN Uploaded: 1/9/2026 (3275 kb)
      • A9.2 - UPPER FLOORS -TYP DORM LEVEL FINISH PLAN Uploaded: 1/9/2026 (1661 kb)
      • A9.3 - BASEMENT-KITCHEN LEVEL FIRST FINISH SCHEDULES Uploaded: 1/9/2026 (4552 kb)
      • A9.4 - UPPER FLOORS -DORM LEVEL FINISH SCHEDULE Uploaded: 1/9/2026 (2391 kb)
      • SP1.1 - SITE DEMOLITION PLAN Uploaded: 1/9/2026 (1859 kb)
      • SP1.2 - SITE PROPOSED PLAN Uploaded: 1/9/2026 (2279 kb)
      • Thumbs-2 Uploaded: 1/9/2026 (23 kb)
    • Security
      • SE0.00 - SECURITY DRAWING LIST NOTES Uploaded: 1/9/2026 (1587 kb)
      • SE1.00 - DEVICE LOCATIONS - BASEMENT- KITCHEN LEVEL Uploaded: 1/9/2026 (1298 kb)
      • SE1.01 - DEVICE LOCATIONS - FIRST FLR - DINING LEVEL Uploaded: 1/9/2026 (1398 kb)
      • SE1.02 - DEVICE LOCATIONS - SECOND FLR - DORM LEVEL Uploaded: 1/9/2026 (1095 kb)
      • SE1.03 - DEVICE LOCATIONS - THIRD FLR - DORM LEVEL Uploaded: 1/9/2026 (1061 kb)
      • SE1.04 - DEVICE LOCATIONS - FOURTH FLR - DORM LEVEL Uploaded: 1/9/2026 (1060 kb)
      • SE1.05 - DEVICE LOCATIONS - ATTIC LEVEL Uploaded: 1/9/2026 (939 kb)
      • SE2.01 - CONNECTIVITY DIAGRAMS Uploaded: 1/9/2026 (969 kb)
      • SE4.01 - INSTALLATION DETAILS - PART 1 Uploaded: 1/9/2026 (1012 kb)
      • SE4.02 - INSTALLATION DETAILS - PART 2 Uploaded: 1/9/2026 (1011 kb)
    • Combined Drawing Set Uploaded: 1/9/2026 (246447 kb)
    • Thumbs-6 Uploaded: 1/9/2026 (84 kb)

Project Info

Project # 26-004
Project Name GC - Thaddeus Stevens College – Multipurpose Dorm Building
Location PA Department of General Services
Address Map It 420 South Broad Street
City Lancaster
State PA
Zip 17602
Bid Date February 23, 2026
Bid Time 5:00 PM
 
Scope This prevailing wage, multi prime contract consists of the construction of a new 61,000 sf multipurpose / Dorm Building, located at the Thaddeus Steven College of Technology. The upper 3 floors are constructed with wood framing wall and floor systems along with a wood trussed roof system.  The lower levels are constructed with conventional structural steel and concrete systems.  

We are requesting prices for the following scopes of work:

DIVISION 02 - EXISTING CONDITIONS
024119 - SELECTIVE DEMOLITION

 DIVISION 03 - CONCRETE
033000 - CAST-IN-PLACE CONCRETE
033000 (WMV) - CAST-IN-PLACE CONCRETE
033010 - SITE CAST-IN-PLACE CONCRETE
034101 (WMV) - PRECAST VAULTS
034900 - GLASS-FIBER-REINFORCED CONCRETE (GFRC)
034414 - GYPSUM CEMENT UNDERLAYMENT
034416 - HYDRAULIC CEMENT UNDERLAYMENT

DIVISION 04 - MASONRY
042000 - UNIT MASONRY
042100 - THIN BRICK
047200 - CAST STONE MASONRY

DIVISION 05 - METALS
051200 - STRUCTURAL STEEL FRAMING
053100 - STEEL DECKING
055001 - MISCELLANEOUS ARCHITECTURAL METALS
055113 - METAL PAN STAIRS

DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES
061000 - ROUGH CARPENTRY
061600 - SHEATHING
061753 - SHOP-FABRICATED WOOD TRUSSES
062000 - FINISH CARPENTRY
062013 - EXTERIOR FINISH CARPENTRY
066400 - PLASTIC PANELING

DIVISION 07 - THERMAL & MOISTURE PROTECTION
071113 - BITUMINOUS DAMPPROOFING
071416 - COLD FLUID-APPLED WATERPROOFING
072100 - THERMAL INSULATION
072500 - WEATHER BARRIERS
072726 - FLUID-APPLIED MEMBRANE AIR BARRIERS
073113 - ASPHALT SHINGLES
075323 - EPDM ROOFING
075423 - THERMOPLASTIC-POLYOLEFIN (TPO) ROOFING
076200 - SHEET METAL FLASHING & TRIM
077200 - ROOF ACCESSORIES
077253 - SNOW GUARDS
078413 - PENETRATION FIRESTOPPING
078443 - JOINT FIRESTOPPING
079200 - JOINT SEALANTS
079219 - ACOUSTICAL JOINT SEALANTS

DIVISION 08 - OPENINGS
081113 - HOLLOW METAL DOORS AND FRAMES
081416 - FLUSH WOOD DOORS
081433 - STILE AND RAIL WOOD DOORS
083113 - ACCESS DOORS & FRAMES
083313 - COILING COUNTER DOORS
083323 - OVERHEAD COILING DOORS
084113 - ALUMINUM-FRAMED ENTRANCES AND STOREFRONTS
085113 - ALUMINUM WINDOWS
085213 - METAL-CLAD WOOD WINDOWS
087100 - DOOR HARDWARE
088000 - GLAZING
088813 - FIRE-RATED GLAZING
089119 - FIXED LOUVERS

DIVISION 09 - FINISHES
092116.13 - GYPSUM BOARD SHAFT WALL ASSEMBLIES
092216 - NON-STRUCTURAL METAL FRAMING
092400 - CEMENT PLASTERING
092900 - GYPSUM BOARD
093000 - TILING
095100 - ACOUSTICAL CEILINGS
096513 - RESILIENT BASE & ACCESSORIES
096519 - RESILIENT TILE FLOORING
096723 - RESINOUS FLOORING
096813 - TILE CARPETING
098400 - ACOUSTIC ROOM COMPONENTS
099000 - PAINTING AND COATING
099123 (WMV) - PAINTING

DIVISION 10 - SPECIALTIES
101100 VISUAL DISPLAY UNITS
101423 - PANEL SIGNAGE
102113.19 - PLASTIC TOILET COMPARTMENTS
102800 - TOILET, BATH, AND LAUNDRY ACCESSORIES
104413 - FIRE PROTECTION CABINETS
104416 - FIRE EXTINGUISHERS

DIVISION 11 - AV EQUIPMENT
113013 - RESIDENIAL APPLIANCES
114000 - FOOD SERVICE EQUIPMENT

DIVISION 12 - FURNISHINGS
122413 - ROLLER WINDOW SHADES

 DIVISION 14 - CONVEYING EQUIPMENT
142100 - ELECTRIC TRACTION ELEVATORS


DIVISION 31 - EARTHWORK
311000 - SITE CLEARING
312000 - EARTH MOVING
312000 (WMV) - EARTHWORK
312100 (WMV) - ROCK REMOVAL
312319 (WMV) - DEWATERING
313200 (WMV) - GROUND IMPROVEMENT - AGGREGATE GROUT PIERS
315000 (WMV) - EXCAVATION SUPPORT SYSTEMS

DIVISION 32 - SITE IMPROVEMENTS
321216 - ASPHALT PAVING
321313 - CONCRETE PAVING
321373 - CONCRETE PAVING JOINT SEALANTS
321400 - UNIT PAVING
321723 - PAVEMENT MARKINGS
329113 - SOIL PREPARATION
329200 - TURF AND GRASSES
329300 - PLANTS

DIVISION 33 - SITE UTILITIES
330500 - COMMON WORK RESULTS FOR UTILITIES
332950 (WMV) - BELOW GRADE DUCTILE IRON PIPE
333000 - GRAVITY SANITARY SEWER
333100 - SITE WATER DISTRIBUTION
334100 - STORM UTILITY DRAINAGE PIPING


Plans
Other Info THERE ARE THREE (3) BASE BIDS ASSOCIATED WITH THIS PROJECT, PLEASE CHECK SPEC SECTION 010300 TO SEE HOW THEY MAY EFFECT YOUR SCOPES OF WORK.

Notices

If you are looking for attached files related to a Notice, go back to the Home tab ("Project Files" are on the right side).
Title Created By Created On
GC - Thaddeus Stevens College – Multipurpose Dorm Building Valerie Slagle 1/9/2026
Thaddeus Stevens College – Multipurpose Dorm Building — Updated Due Date and Time Valerie Slagle 1/21/2026

Lobar, Inc. Contacts

Company Contact Title Phone Extension Fax Email
Lobar, Inc. Eric Bowen Estimator 717-432-9728 4289 eric.bowen@lobar.com
Lobar, Inc. Lou Marchi Estimator 717-432-9728 4217 lou.marchi@lobar.com
Lobar, Inc. Scott Lowery Estimator 717-432-9728 4212 717-432-9162 Scott.Lowery@lobar.com

If you have project-related questions, please contact your contractor or use the "Submit Question" tab.
If you are having technical difficulties downloading, please email support@preconsuite.com or call 949-222-0400.