GC - BCI Municipal Authority WWTP

Project Files

  • Addenda
    • Addendum 1 Uploaded: 4/10/2026 (21300 kb)
    • Addendum 2 Uploaded: 4/10/2026 (14747 kb)
    • Addendum 3 Uploaded: 4/10/2026 (296 kb)
    • Addendum 4 Uploaded: 4/10/2026 (2140 kb)
    • Thumbs-1 Uploaded: 4/10/2026 (22 kb)
  • Addenda Drawings
    • A340 BULK CHEMICAL STORAGE PLANS ADDN 1 Uploaded: 4/10/2026 (322 kb)
    • A341 BULK CHEMICAL STORAGE DETAILS ADDN 1 Uploaded: 4/10/2026 (233 kb)
    • C005 SITE PLAN ADDN 2 Uploaded: 4/10/2026 (1441 kb)
    • C006 GRADING DRAINAGE ADDN 2 Uploaded: 4/10/2026 (2521 kb)
    • C006 GRADING DRAINAGE ADDN 4 Uploaded: 4/10/2026 (1908 kb)
    • C007 SITE PIPING ADDN 2 Uploaded: 4/10/2026 (1364 kb)
    • C008 ENLARGED SITE PIPING ADDN 2 Uploaded: 4/10/2026 (1475 kb)
    • C410 PUMP STATION SITE PLAN ADDN 2 Uploaded: 4/10/2026 (290 kb)
    • E001 ELECTRICAL NOTES SYMBOLS ADDN 1 Uploaded: 4/10/2026 (705 kb)
    • E002 ELECTRICAL SITE PLAN ADDN 1 Uploaded: 4/10/2026 (389 kb)
    • E003 SINGLE LINE DIAG ADDN 1 Uploaded: 4/10/2026 (393 kb)
    • E004 NTERNET PHONE SING LINE DIAG ADDN 1 Uploaded: 4/10/2026 (239 kb)
    • E005 ELECTRICAL SCHEDULES ADDN 1 Uploaded: 4/10/2026 (457 kb)
    • E006 ELECTRICAL SCHEDULES ADDN 1 Uploaded: 4/10/2026 (450 kb)
    • E007 ELECTRICAL SCHEDULES ADDN 1 Uploaded: 4/10/2026 (629 kb)
    • E008 ELECTRICAL DETAILS ADDN 1 Uploaded: 4/10/2026 (371 kb)
    • E009 ELECTRICAL DETAILS ADDN 1 Uploaded: 4/10/2026 (281 kb)
    • E010 ELECTRICAL DETAILS ADDN 1 Uploaded: 4/10/2026 (250 kb)
    • E101 ELECTRICAL PLAN ADDN 1 Uploaded: 4/10/2026 (382 kb)
    • E102 LIGHTING PLAN ADDN 1 Uploaded: 4/10/2026 (370 kb)
    • E201 FIRST LEVEL ELEC KEY PLAN ADDN 1 Uploaded: 4/10/2026 (226 kb)
    • E202 SECOND LEVEL ELEC KEY PLAN ADDN 1 Uploaded: 4/10/2026 (218 kb)
    • E203 FIRST LEVEL LIGHTING KEY PLAN ADDN 1 Uploaded: 4/10/2026 (223 kb)
    • E204 SECOND LEVEL LIGHTING KEY PLAN ADDN 1 Uploaded: 4/10/2026 (185 kb)
    • E205 ROOF ELECTRICAL PLAN ADDN 1 Uploaded: 4/10/2026 (270 kb)
    • E206 SLUDGE PROCESSING ELEC PLAN ADDN 1 Uploaded: 4/10/2026 (292 kb)
    • E207 PUMP ROOM ELECTRICAL PLAN ADDN 1 Uploaded: 4/10/2026 (280 kb)
    • E208 BLOWER SCREEN RM ELEC PLAN ADDN 1 Uploaded: 4/10/2026 (315 kb)
    • E209 DISINFECTION RM ELEC PLAN ADDN 1 Uploaded: 4/10/2026 (326 kb)
    • E210 SLUDGE PROCESSING RM LIGHTING ADDN 1 Uploaded: 4/10/2026 (226 kb)
    • E211 PUMP ROOM LIGHTING PLAN ADDN 1 Uploaded: 4/10/2026 (244 kb)
    • E212 BLOWER SCREEN RM LIGHTING ADDN 1 Uploaded: 4/10/2026 (207 kb)
    • E213 DISINFECTION RM LIGHTING ADDN 1 Uploaded: 4/10/2026 (210 kb)
    • E214 ELECTRICAL DETAILS ADDN 1 Uploaded: 4/10/2026 (206 kb)
    • E215 ELECTRICAL DETAILS ADDN 1 Uploaded: 4/10/2026 (319 kb)
    • E216 ELECTRICAL DETAILS ADDN 1 Uploaded: 4/10/2026 (279 kb)
    • E230 TANK WALKWAY PLANS ADDN 1 Uploaded: 4/10/2026 (360 kb)
    • E310 INFLUENT WET WELL PLANS ADDN 1 Uploaded: 4/10/2026 (309 kb)
    • E311 INFLUENT WET WELL DETAILS ADDN 1 Uploaded: 4/10/2026 (293 kb)
    • E320 EFFLUENT AERATION TANK ADDN 1 Uploaded: 4/10/2026 (215 kb)
    • E340 BULK CHEMICAL STORAGE ADDN 1 Uploaded: 4/10/2026 (355 kb)
    • E410 PUMP STATION SINGLE LINE DIAG ADDN 1 Uploaded: 4/10/2026 (425 kb)
    • E411 PUMP STATION PLAN DETAILS ADDN 1 Uploaded: 4/10/2026 (282 kb)
    • E420 PUMP STATION SINGLE LINE DIAG ADDN 1 Uploaded: 4/10/2026 (414 kb)
    • E421 PUMP STATION ELECTRICAL PLAN ADDN 1 Uploaded: 4/10/2026 (258 kb)
    • E430 PUMP STATION SINGLE LINE DIAG ADDN 1 Uploaded: 4/10/2026 (415 kb)
    • E431 PUMP STATION ELECTRICAL PLAN ADDN 1 Uploaded: 4/10/2026 (257 kb)
    • H208 HVAC SCHEDULES ADDN 1 Uploaded: 4/10/2026 (310 kb)
    • H209 HVAC SCHEDULES ADDN 1 Uploaded: 4/10/2026 (360 kb)
    • MP340 BULK CHEMICAL STOR PLAN ADDN 1 Uploaded: 4/10/2026 (367 kb)
    • MP341 BULK CHEMICAL STOR DETAILS ADDN 1 Uploaded: 4/10/2026 (381 kb)
    • S203 SECOND LEVEL FRAM ADDN 2 Uploaded: 4/10/2026 (538 kb)
    • S205 ROOF FRAM ADDN 2 Uploaded: 4/10/2026 (306 kb)
    • S206 WALL SECTION DETAILS ADDN 2 Uploaded: 4/10/2026 (743 kb)
    • S209 WALL SECTION DETAILS ADDN 2 Uploaded: 4/10/2026 (530 kb)
    • S210 WALL SECTION DETAILS ADDN 2 Uploaded: 4/10/2026 (626 kb)
    • S232 TANK WALKWAY PLAN ADDN 1 Uploaded: 4/10/2026 (365 kb)
    • S340 BULK CHEMICAL STORAGE ADDN 1 Uploaded: 4/10/2026 (284 kb)
    • Thumbs-2 Uploaded: 4/10/2026 (43 kb)
  • Specifications
    • ADVERTISEMENT FOR BIDS Uploaded: 3/11/2026 (148 kb)
    • AGREEMENT Uploaded: 3/11/2026 (395 kb)
    • APPLICATION FOR PAYMENT Uploaded: 3/11/2026 (74 kb)
    • BID BOND Uploaded: 3/11/2026 (143 kb)
    • BID PACKAGE - CONTRACT 1 - GENERAL-MECH Uploaded: 3/11/2026 (1302 kb)
    • BID PACKAGE - CONTRACT 2 - HVAC Uploaded: 3/11/2026 (1285 kb)
    • BID PACKAGE - CONTRACT 3 - PLUMBING Uploaded: 3/11/2026 (1285 kb)
    • BID PACKAGE - CONTRACT 4 - ELECTRICAL Uploaded: 3/11/2026 (1288 kb)
    • BID PACKAGE - CONTRACT 5 - PUMP STATION Uploaded: 3/11/2026 (1286 kb)
    • CERTIFICATE OF SUBSTANTIAL COMPLETION Uploaded: 3/11/2026 (203 kb)
    • CHANGE ORDER FORMS Uploaded: 3/11/2026 (166 kb)
    • CONSENT OF SURETY TO FINAL PAYMENT Uploaded: 3/11/2026 (71 kb)
    • COVER TABLE OF CONTENTS Uploaded: 3/11/2026 (271 kb)
    • DBE SOLICITATION INFORMATION Uploaded: 3/11/2026 (545 kb)
    • DIVISION 01 Uploaded: 3/11/2026 (1112 kb)
    • DIVISION 02 Uploaded: 3/11/2026 (314 kb)
    • DIVISION 03 Uploaded: 3/11/2026 (455 kb)
    • DIVISION 04 Uploaded: 3/11/2026 (311 kb)
    • DIVISION 05 Uploaded: 3/11/2026 (504 kb)
    • DIVISION 06 Uploaded: 3/11/2026 (359 kb)
    • DIVISION 07 Uploaded: 3/11/2026 (688 kb)
    • DIVISION 08 Uploaded: 3/11/2026 (673 kb)
    • DIVISION 09 Uploaded: 3/11/2026 (538 kb)
    • DIVISION 10 Uploaded: 3/11/2026 (359 kb)
    • DIVISION 11 Uploaded: 3/11/2026 (320 kb)
    • DIVISION 12 Uploaded: 3/11/2026 (440 kb)
    • DIVISION 13 Uploaded: 3/11/2026 (230 kb)
    • DIVISION 21 Uploaded: 3/11/2026 (273 kb)
    • DIVISION 22 Uploaded: 3/11/2026 (1080 kb)
    • DIVISION 23 Uploaded: 3/11/2026 (1446 kb)
    • DIVISION 25 Uploaded: 3/11/2026 (495 kb)
    • DIVISION 26 Uploaded: 3/11/2026 (719 kb)
    • DIVISION 31 Uploaded: 3/11/2026 (578 kb)
    • DIVISION 32 Uploaded: 3/11/2026 (545 kb)
    • DIVISION 33 Uploaded: 3/11/2026 (697 kb)
    • DIVISION 40 Uploaded: 3/11/2026 (544 kb)
    • DIVISION 41 Uploaded: 3/11/2026 (398 kb)
    • DIVISION 43 Uploaded: 3/11/2026 (613 kb)
    • DIVISION 46 Uploaded: 3/11/2026 (779 kb)
    • FUNDING REQUIREMENTS Uploaded: 3/11/2026 (487 kb)
    • GEOTECHNICAL REPORT Uploaded: 3/11/2026 (10797 kb)
    • INSTRUCTIONS TO BIDDERS Uploaded: 3/11/2026 (281 kb)
    • NOTICE OF ACCEPTABILITY OF WORK Uploaded: 3/11/2026 (181 kb)
    • NOTICE OF AWARD Uploaded: 3/11/2026 (202 kb)
    • NOTICE TO PROCEED Uploaded: 3/11/2026 (177 kb)
    • PAYMENT BOND Uploaded: 3/11/2026 (229 kb)
    • PERFORMANCE BOND Uploaded: 3/11/2026 (227 kb)
    • PERMITS Uploaded: 3/11/2026 (2517 kb)
    • STANDARD GENERAL CONDITIONS Uploaded: 3/11/2026 (743 kb)
    • SUPPLEMENTARY CONDITIONS Uploaded: 3/11/2026 (273 kb)
    • Thumbs Uploaded: 3/11/2026 (28 kb)
    • WAGE RATES Uploaded: 3/11/2026 (120 kb)
    • _COMBINED VOLUME 1 Uploaded: 3/11/2026 (17645 kb)
    • _COMBINED VOLUME 2 Uploaded: 3/11/2026 (11488 kb)
  • Drawings
    • A001 GENERAL NOTES Uploaded: 4/10/2026 (531 kb)
    • A101 FLOOR PLAN Uploaded: 4/10/2026 (341 kb)
    • A102 REFLECTED CEILING PLAN Uploaded: 4/10/2026 (359 kb)
    • A103 BUILDING ELEVATIONS Uploaded: 4/10/2026 (363 kb)
    • A104 BUILDING SECTIONS Uploaded: 4/10/2026 (303 kb)
    • A105 WALL SECTIONS Uploaded: 4/10/2026 (440 kb)
    • A106 INT ELEV PLANS SCH Uploaded: 4/10/2026 (432 kb)
    • A107 INT ELEV SCHEDULES Uploaded: 4/10/2026 (439 kb)
    • A108 INT ELEV SCH PLANTING Uploaded: 4/10/2026 (431 kb)
    • A109 FINISH FURNITURE PLAN Uploaded: 4/10/2026 (395 kb)
    • A110 DOOR WINDOW SCH Uploaded: 4/10/2026 (592 kb)
    • A201 FIRST LEVEL PLAN Uploaded: 4/10/2026 (592 kb)
    • A202 SECOND LEVEL PLAN Uploaded: 4/10/2026 (409 kb)
    • A203 ROOF PLAN AND DETAILS Uploaded: 4/10/2026 (374 kb)
    • A204 BUILDING ELEVATIONS Uploaded: 4/10/2026 (637 kb)
    • A205 BUILDING ELEVATIONS Uploaded: 4/10/2026 (607 kb)
    • A206 BUILDING SECTIONS Uploaded: 4/10/2026 (510 kb)
    • A207 BUILDING SECTIONS Uploaded: 4/10/2026 (413 kb)
    • A208 BUILDING SECTIONS Uploaded: 4/10/2026 (352 kb)
    • A209 BUILDING SECTIONS Uploaded: 4/10/2026 (364 kb)
    • A210 BUILDING SECTIONS Uploaded: 4/10/2026 (391 kb)
    • A211 WALL SECTIONS Uploaded: 4/10/2026 (694 kb)
    • A212 WALL SECTIONS Uploaded: 4/10/2026 (616 kb)
    • A213 WALL SECTIONS Uploaded: 4/10/2026 (705 kb)
    • A214 WALL SECTIONS Uploaded: 4/10/2026 (632 kb)
    • A215 WALL SECTIONS Uploaded: 4/10/2026 (572 kb)
    • A216 WALL SECTIONS Uploaded: 4/10/2026 (674 kb)
    • A217 ENLARGED PLANS Uploaded: 4/10/2026 (557 kb)
    • A218 PLANS INTERIOR ELEV Uploaded: 4/10/2026 (516 kb)
    • A219 SIGNAGE PLANS Uploaded: 4/10/2026 (427 kb)
    • A220 DOOR WINDOW SCHEDULE Uploaded: 4/10/2026 (430 kb)
    • A221 DOOR WINDOW SCHEDULE Uploaded: 4/10/2026 (469 kb)
    • A222 DOOR WINDOW DETAILS Uploaded: 4/10/2026 (669 kb)
    • A230 TANK WALKWAY RAILING Uploaded: 4/10/2026 (336 kb)
    • A301 WET WELL KEY PLAN Uploaded: 4/10/2026 (183 kb)
    • A310 INFLUENT WET WELL PLAN Uploaded: 4/10/2026 (315 kb)
    • A311 INFLUENT WET WELL SECTIONS Uploaded: 4/10/2026 (333 kb)
    • A312 INFLUENT WET WELL DETAILS Uploaded: 4/10/2026 (269 kb)
    • A320 EFFLUENT AERATION TANK PLANS Uploaded: 4/10/2026 (214 kb)
    • A321 EFFLUENT AERATION TANK SECTIONS Uploaded: 4/10/2026 (226 kb)
    • A340 BULK CHEMICAL STORAGE PLANS Uploaded: 4/10/2026 (317 kb)
    • A340 BULK CHEMICAL STORAGE PLANS ADDN 1-1 Uploaded: 4/10/2026 (322 kb)
    • A341 BULK CHEMICAL STORAGE DETAILS Uploaded: 4/10/2026 (231 kb)
    • A341 BULK CHEMICAL STORAGE DETAILS ADDN 1-1 Uploaded: 4/10/2026 (233 kb)
    • A370 PRE-FAB MOD BLDG LIFE SAFETY Uploaded: 4/10/2026 (456 kb)
    • A371 PRE-FAB MOD BLDG PLAN Uploaded: 4/10/2026 (560 kb)
    • C001 CIVIL GENERAL NOTE Uploaded: 4/10/2026 (397 kb)
    • C002 EXISTING PROPERTY PLAN Uploaded: 4/10/2026 (282 kb)
    • C003 EXISTING SITE PLAN Uploaded: 4/10/2026 (365 kb)
    • C004 EXISTING SITE PIPING PLAN Uploaded: 4/10/2026 (382 kb)
    • C005 SITE PLAN Uploaded: 4/10/2026 (467 kb)
    • C005 SITE PLAN ADDN 2-1 Uploaded: 4/10/2026 (1441 kb)
    • C006 GRADING DRAINAGE Uploaded: 4/10/2026 (832 kb)
    • C006 GRADING DRAINAGE ADDN 2-1 Uploaded: 4/10/2026 (2521 kb)
    • C006 GRADING DRAINAGE ADDN 4-1 Uploaded: 4/10/2026 (1908 kb)
    • C007 SITE PIPING ADDN 2-1 Uploaded: 4/10/2026 (1364 kb)
    • C007 SITE PIPING PLAN Uploaded: 4/10/2026 (441 kb)
    • C008 ENLARGED SITE PIPING Uploaded: 4/10/2026 (459 kb)
    • C008 ENLARGED SITE PIPING ADDN 2-1 Uploaded: 4/10/2026 (1475 kb)
    • C009 STORMWATER PROFILES Uploaded: 4/10/2026 (209 kb)
    • C010 INFLUENT SANITARY PROFILES Uploaded: 4/10/2026 (241 kb)
    • C011 EFFLUENT SANITARY PROFILE Uploaded: 4/10/2026 (211 kb)
    • C012 SITE DETAILS Uploaded: 4/10/2026 (300 kb)
    • C013 SITE DETAILS Uploaded: 4/10/2026 (240 kb)
    • C014 FENCING DETAILS Uploaded: 4/10/2026 (477 kb)
    • C015 STORMWATER DETAILS Uploaded: 4/10/2026 (319 kb)
    • C016 STORMWATER DETAILS Uploaded: 4/10/2026 (339 kb)
    • C017 SITE PIPING DETAILS Uploaded: 4/10/2026 (428 kb)
    • C018 SITE PIPING DETAILS Uploaded: 4/10/2026 (382 kb)
    • C401 PUMP STATION SITE DETAILS Uploaded: 4/10/2026 (250 kb)
    • C410 PUMP STATION SITE PLAN Uploaded: 4/10/2026 (272 kb)
    • C410 PUMP STATION SITE PLAN ADDN 2-1 Uploaded: 4/10/2026 (290 kb)
    • C420 PUMP STATION SITE PLAN Uploaded: 4/10/2026 (285 kb)
    • C430 PUMP STATION SITE PLAN Uploaded: 4/10/2026 (273 kb)
    • CS-01 COVER SHEET Uploaded: 4/10/2026 (446 kb)
    • CS-02 DRAWING INDEX Uploaded: 4/10/2026 (498 kb)
    • CS-03 COVER SHEET VOL 2 Uploaded: 4/10/2026 (452 kb)
    • CS-04 DRAWING INDEX Uploaded: 4/10/2026 (527 kb)
    • CS-05 COVER SHEET VOL 3 Uploaded: 4/10/2026 (444 kb)
    • CS-06 DRAWING INDEX Uploaded: 4/10/2026 (490 kb)
    • D001 DEMOLITION SITE PLAN Uploaded: 4/10/2026 (422 kb)
    • D002 TREATMENT UNIT DEMO Uploaded: 4/10/2026 (451 kb)
    • D003 TREATMENT UNIT DEMO Uploaded: 4/10/2026 (325 kb)
    • D004 INFLUENT WET WELL DEMO Uploaded: 4/10/2026 (441 kb)
    • D005 INFLUENT VALVE VAULT DEMO Uploaded: 4/10/2026 (396 kb)
    • D006 SLUDGE PUMP VAULT DEMO Uploaded: 4/10/2026 (348 kb)
    • D007 DEMOLITION DETAILS Uploaded: 4/10/2026 (311 kb)
    • D101 GRND LEVEL DEMO RCP Uploaded: 4/10/2026 (435 kb)
    • D102 ELEVATION DEMOLITION Uploaded: 4/10/2026 (438 kb)
    • E001 ELECTRICAL NOTES SYMBOLS ADDN 1-1 Uploaded: 4/10/2026 (705 kb)
    • E001 NOTES SYMBOLS Uploaded: 4/10/2026 (695 kb)
    • E002 ELECTRICAL SITE PLAN Uploaded: 4/10/2026 (378 kb)
    • E002 ELECTRICAL SITE PLAN ADDN 1-1 Uploaded: 4/10/2026 (389 kb)
    • E003 ELECTRICAL SINGLE LINE DIAG Uploaded: 4/10/2026 (373 kb)
    • E003 SINGLE LINE DIAG ADDN 1-1 Uploaded: 4/10/2026 (393 kb)
    • E004 INTERNET PHONE SINGLE LINE DIAG Uploaded: 4/10/2026 (230 kb)
    • E004 NTERNET PHONE SING LINE DIAG ADDN 1-1 Uploaded: 4/10/2026 (239 kb)
    • E005 ELECTRICAL SCHEDULES Uploaded: 4/10/2026 (465 kb)
    • E005 ELECTRICAL SCHEDULES ADDN 1-1 Uploaded: 4/10/2026 (457 kb)
    • E006 ELECTRICAL SCHEDULES Uploaded: 4/10/2026 (449 kb)
    • E006 ELECTRICAL SCHEDULES ADDN 1-1 Uploaded: 4/10/2026 (450 kb)
    • E007 ELECTRICAL SCHEDULES Uploaded: 4/10/2026 (621 kb)
    • E007 ELECTRICAL SCHEDULES ADDN 1-1 Uploaded: 4/10/2026 (629 kb)
    • E008 ELECTRICAL DETAILS ADDN 1-1 Uploaded: 4/10/2026 (371 kb)
    • E008 ELECTRICAL SCHEDULES DETAILS Uploaded: 4/10/2026 (355 kb)
    • E009 ELECTRICAL DETAILS Uploaded: 4/10/2026 (274 kb)
    • E009 ELECTRICAL DETAILS ADDN 1-1 Uploaded: 4/10/2026 (281 kb)
    • E010 ELECTRICAL DETAILS Uploaded: 4/10/2026 (244 kb)
    • E010 ELECTRICAL DETAILS ADDN 1-1 Uploaded: 4/10/2026 (250 kb)
    • E101 ELECTRICAL PLAN Uploaded: 4/10/2026 (381 kb)
    • E101 ELECTRICAL PLAN ADDN 1-1 Uploaded: 4/10/2026 (382 kb)
    • E102 LIGHTING PLAN Uploaded: 4/10/2026 (375 kb)
    • E102 LIGHTING PLAN ADDN 1-1 Uploaded: 4/10/2026 (370 kb)
    • E201 FIRST LEVEL ELEC KEY PLAN Uploaded: 4/10/2026 (227 kb)
    • E201 FIRST LEVEL ELEC KEY PLAN ADDN 1-1 Uploaded: 4/10/2026 (226 kb)
    • E202 SECOND LEVEL ELEC KEY PLAN Uploaded: 4/10/2026 (219 kb)
    • E202 SECOND LEVEL ELEC KEY PLAN ADDN 1-1 Uploaded: 4/10/2026 (218 kb)
    • E203 FIRST LEVEL LIGHTING KEY PLAN Uploaded: 4/10/2026 (223 kb)
    • E203 FIRST LEVEL LIGHTING KEY PLAN ADDN 1-1 Uploaded: 4/10/2026 (223 kb)
    • E204 SECOND LEVEL LIGHTING KEY PLAN Uploaded: 4/10/2026 (187 kb)
    • E204 SECOND LEVEL LIGHTING KEY PLAN ADDN 1-1 Uploaded: 4/10/2026 (185 kb)
    • E205 ROOF ELECTRICAL PLAN Uploaded: 4/10/2026 (272 kb)
    • E205 ROOF ELECTRICAL PLAN ADDN 1-1 Uploaded: 4/10/2026 (270 kb)
    • E206 SLUDGE PROCESSING ELEC PLAN ADDN 1-1 Uploaded: 4/10/2026 (292 kb)
    • E206 SLUDGE PROCESSING ELEC PLAN Uploaded: 4/10/2026 (301 kb)
    • E207 PUMP ROOM ELECTRICAL PLAN ADDN 1-1 Uploaded: 4/10/2026 (280 kb)
    • E207 PUMP ROOM ELEC PLAN Uploaded: 4/10/2026 (284 kb)
    • E208 BLOWER SCREEN RM ELEC PLAN ADDN 1-1 Uploaded: 4/10/2026 (315 kb)
    • E208 BLOWER SCREEN RM ELEC Uploaded: 4/10/2026 (327 kb)
    • E209 DISINFECTION RM ELEC Uploaded: 4/10/2026 (324 kb)
    • E209 DISINFECTION RM ELEC PLAN ADDN 1-1 Uploaded: 4/10/2026 (326 kb)
    • E210 SLUDGE PROCESSING RM LIGHTING Uploaded: 4/10/2026 (225 kb)
    • E210 SLUDGE PROCESSING RM LIGHTING ADDN 1-1 Uploaded: 4/10/2026 (226 kb)
    • E211 PUMP ROOM LIGHTING PLAN Uploaded: 4/10/2026 (244 kb)
    • E211 PUMP ROOM LIGHTING PLAN ADDN 1-1 Uploaded: 4/10/2026 (244 kb)
    • E212 BLOWER SCREEN RM LIGHTING Uploaded: 4/10/2026 (206 kb)
    • E212 BLOWER SCREEN RM LIGHTING ADDN 1-1 Uploaded: 4/10/2026 (207 kb)
    • E213 DISINFECTION RM LIGHTING Uploaded: 4/10/2026 (208 kb)
    • E213 DISINFECTION RM LIGHTING ADDN 1-1 Uploaded: 4/10/2026 (210 kb)
    • E214 ELECTRICAL DETAILS Uploaded: 4/10/2026 (209 kb)
    • E214 ELECTRICAL DETAILS ADDN 1-1 Uploaded: 4/10/2026 (206 kb)
    • E215 ELECTRICAL DETAILS Uploaded: 4/10/2026 (317 kb)
    • E215 ELECTRICAL DETAILS ADDN 1-1 Uploaded: 4/10/2026 (319 kb)
    • E216 ELECTRICAL DETAILS Uploaded: 4/10/2026 (280 kb)
    • E216 ELECTRICAL DETAILS ADDN 1-1 Uploaded: 4/10/2026 (279 kb)
    • E230 TANK WALKWAY PLANS Uploaded: 4/10/2026 (364 kb)
    • E230 TANK WALKWAY PLANS ADDN 1-1 Uploaded: 4/10/2026 (360 kb)
    • E310 INFLUENT WET WELL PLAN Uploaded: 4/10/2026 (295 kb)
    • E310 INFLUENT WET WELL PLANS ADDN 1-1 Uploaded: 4/10/2026 (309 kb)
    • E311 INFLUENT WET WELL DETAILS Uploaded: 4/10/2026 (281 kb)
    • E311 INFLUENT WET WELL DETAILS ADDN 1-1 Uploaded: 4/10/2026 (293 kb)
    • E320 EFFLUENT AERATION TANK Uploaded: 4/10/2026 (206 kb)
    • E320 EFFLUENT AERATION TANK ADDN 1-1 Uploaded: 4/10/2026 (215 kb)
    • E340 BULK CHEMICAL STORAGE Uploaded: 4/10/2026 (333 kb)
    • E340 BULK CHEMICAL STORAGE ADDN 1-1 Uploaded: 4/10/2026 (355 kb)
    • E410 PUMP STATION SINGLE LINE DIAG Uploaded: 4/10/2026 (415 kb)
    • E410 PUMP STATION SINGLE LINE DIAG ADDN 1-1 Uploaded: 4/10/2026 (425 kb)
    • E411 PUMP STATION PLAN Uploaded: 4/10/2026 (276 kb)
    • E411 PUMP STATION PLAN DETAILS ADDN 1-1 Uploaded: 4/10/2026 (282 kb)
    • E420 PUMP STATION SINGLE LINE DIAG Uploaded: 4/10/2026 (406 kb)
    • E420 PUMP STATION SINGLE LINE DIAG ADDN 1-1 Uploaded: 4/10/2026 (414 kb)
    • E421 PUMP STATION ELECTRICAL PLAN ADDN 1-1 Uploaded: 4/10/2026 (258 kb)
    • E421 PUMP STATION PLAN Uploaded: 4/10/2026 (251 kb)
    • E430 PUMP STATION SINGLE LINE DIAG Uploaded: 4/10/2026 (408 kb)
    • E430 PUMP STATION SINGLE LINE DIAG ADDN 1-1 Uploaded: 4/10/2026 (415 kb)
    • E431 PUMP STATION ELECTRICAL PLAN ADDN 1-1 Uploaded: 4/10/2026 (257 kb)
    • E431 PUMP STATION PLAN Uploaded: 4/10/2026 (257 kb)
    • ES001 ES POLLUTION CONTROL NOTES Uploaded: 4/10/2026 (963 kb)
    • ES002 ES POLLUTION CONTROL NOTES Uploaded: 4/10/2026 (492 kb)
    • ES003 ES POLLUTION CONTROL DETAILS Uploaded: 4/10/2026 (486 kb)
    • ES004 ES POLLUTION CONTROL DETAILS Uploaded: 4/10/2026 (374 kb)
    • ES005 ES POLLUTION CONTROL PLAN Uploaded: 4/10/2026 (763 kb)
    • FP201 FIRST LEVEL FP PLAN Uploaded: 4/10/2026 (342 kb)
    • FP202 ENLARGED FP PLAN Uploaded: 4/10/2026 (504 kb)
    • G001 GENERAL NOTES Uploaded: 4/10/2026 (460 kb)
    • G002 SERIES INDEX PLAN Uploaded: 4/10/2026 (335 kb)
    • G003 SEQUENCE OF CONSTRUCTION Uploaded: 4/10/2026 (618 kb)
    • G004 PROCESS FLOW SCHEMATIC Uploaded: 4/10/2026 (322 kb)
    • G005 HYDRAULC PROFILE Uploaded: 4/10/2026 (291 kb)
    • G006 HYDRAULC PROFILE Uploaded: 4/10/2026 (204 kb)
    • G007 PROJECT TYPICAL DETAILS Uploaded: 4/10/2026 (456 kb)
    • G008 PROJECT TYPICAL DETAILS Uploaded: 4/10/2026 (476 kb)
    • G009 RESERVED FOR FUTURE Uploaded: 4/10/2026 (125 kb)
    • G100 LIFE SAFETY PLAN Uploaded: 4/10/2026 (589 kb)
    • G200 LIFE SAFETY PLAN Uploaded: 4/10/2026 (871 kb)
    • G201 LABORATORY ISOMETRIC PLAN Uploaded: 4/10/2026 (511 kb)
    • G202 SLUDGE PROCESSING RM ISOMETRIC Uploaded: 4/10/2026 (484 kb)
    • G203 PUMP RM ISOMETRIC Uploaded: 4/10/2026 (710 kb)
    • G204 DISINFECTION RM ISOMETRIC Uploaded: 4/10/2026 (467 kb)
    • G205 CHEMICAL FEED ISOMETRIC PLAN Uploaded: 4/10/2026 (444 kb)
    • G206 BLOWER ROOM ISOMETRIC PLAN Uploaded: 4/10/2026 (434 kb)
    • G207 SCREEN ROOM ISOMETRIC PLAN Uploaded: 4/10/2026 (557 kb)
    • H001 HVAC NOTES LEGENDS Uploaded: 4/10/2026 (617 kb)
    • H101 HVAC ROOF PROPOSED PLANS Uploaded: 4/10/2026 (288 kb)
    • H102 HVAC DIAGRAMS Uploaded: 4/10/2026 (163 kb)
    • H103 HVAC SCHEDULES Uploaded: 4/10/2026 (244 kb)
    • H201 FIRST LEVEL HVAC KEY PLAN Uploaded: 4/10/2026 (387 kb)
    • H202 SECOND LEVEL HVAC KEY PLAN Uploaded: 4/10/2026 (318 kb)
    • H203 ROOF HVAC PLAN Uploaded: 4/10/2026 (332 kb)
    • H204 SLUDGE PROCESSING LABORATORY Uploaded: 4/10/2026 (258 kb)
    • H205 PUMP ROOM HVAC PLAN Uploaded: 4/10/2026 (297 kb)
    • H206 DISINFECTION ROOM HVAC Uploaded: 4/10/2026 (269 kb)
    • H207 BLOWER SCREEN RM HVAC Uploaded: 4/10/2026 (289 kb)
    • H208 HVAC SCHEDULES Uploaded: 4/10/2026 (307 kb)
    • H208 HVAC SCHEDULES ADDN 1-1 Uploaded: 4/10/2026 (310 kb)
    • H209 HVAC SCHEDULES Uploaded: 4/10/2026 (355 kb)
    • H209 HVAC SCHEDULES ADDN 1-1 Uploaded: 4/10/2026 (360 kb)
    • H210 HVAC SCHEDULES Uploaded: 4/10/2026 (266 kb)
    • MP001 PROCESS NOTES LEGENDS Uploaded: 4/10/2026 (487 kb)
    • MP201 FOUNDATION PLAN Uploaded: 4/10/2026 (369 kb)
    • MP202 FIRST LEVEL PLAN Uploaded: 4/10/2026 (420 kb)
    • MP203 SECOND LEVEL PLAN Uploaded: 4/10/2026 (311 kb)
    • MP204 FIRST LEVEL RCP Uploaded: 4/10/2026 (396 kb)
    • MP205 SECOND LEVEL RCP Uploaded: 4/10/2026 (256 kb)
    • MP206 BUILDING SECTIONS Uploaded: 4/10/2026 (518 kb)
    • MP207 BUILDING SECTIONS Uploaded: 4/10/2026 (469 kb)
    • MP208 BUILDING SECTIONS Uploaded: 4/10/2026 (515 kb)
    • MP209 SLUDGE PROCESSING FLR PLAN Uploaded: 4/10/2026 (361 kb)
    • MP210 SLUDGE PROCESSING CEILING PLAN Uploaded: 4/10/2026 (288 kb)
    • MP211 SLUDGE PROCESSING ELEVATIONS Uploaded: 4/10/2026 (484 kb)
    • MP212 SLUDGE PROCESSING DETAILS Uploaded: 4/10/2026 (457 kb)
    • MP213 PUMP ROOM FLOOR PLAN Uploaded: 4/10/2026 (410 kb)
    • MP214 PUMP ROOM CEILING PLAN Uploaded: 4/10/2026 (355 kb)
    • MP215 PUMP ROOM ELEVATIONS Uploaded: 4/10/2026 (470 kb)
    • MP216 PUMP ROOM DETAILS Uploaded: 4/10/2026 (370 kb)
    • MP217 BLOWER SCREEN RM FLR PLAN Uploaded: 4/10/2026 (343 kb)
    • MP218 BLOWER SCREEN RM RCP Uploaded: 4/10/2026 (272 kb)
    • MP219 BLOWER RM SCREEN RM ELEV Uploaded: 4/10/2026 (473 kb)
    • MP220 SCREEN ROOM DETAILS Uploaded: 4/10/2026 (556 kb)
    • MP221 DISINFECTION RM FLR PLAN Uploaded: 4/10/2026 (340 kb)
    • MP222 DISINFECTION RM CEILING PLAN Uploaded: 4/10/2026 (302 kb)
    • MP223 DISINFECTION RM ELEV Uploaded: 4/10/2026 (451 kb)
    • MP230 TANK FOUNDATION PLAN Uploaded: 4/10/2026 (282 kb)
    • MP231 TANK PLAN Uploaded: 4/10/2026 (415 kb)
    • MP232 TANK WALKWAY PLAN Uploaded: 4/10/2026 (321 kb)
    • MP233 SBR DIGESTER TANK SECTIONS Uploaded: 4/10/2026 (508 kb)
    • MP234 SBR TANK ELEVATIONS Uploaded: 4/10/2026 (345 kb)
    • MP235 DIGESTER TANK ELEVATIONS Uploaded: 4/10/2026 (277 kb)
    • MP301 WET WELLS FLOOR PLAN Uploaded: 4/10/2026 (196 kb)
    • MP302 WET WELLS FOUND PLAN Uploaded: 4/10/2026 (278 kb)
    • MP303 WET WELLS SECTIONS Uploaded: 4/10/2026 (257 kb)
    • MP304 WET WELLS SECTIONS Uploaded: 4/10/2026 (265 kb)
    • MP310 INFLUENT WET WELL Uploaded: 4/10/2026 (297 kb)
    • MP320 EFFLUENT AERATION TANK Uploaded: 4/10/2026 (255 kb)
    • MP321 EFFLUENT AERATION TANK Uploaded: 4/10/2026 (281 kb)
    • MP322 EFFLUENT AERATION BLOWER Uploaded: 4/10/2026 (250 kb)
    • MP340 BULK CHEMICAL STOR PLAN ADDN 1-1 Uploaded: 4/10/2026 (367 kb)
    • MP340 BULK CHEMICAL STORAGE Uploaded: 4/10/2026 (358 kb)
    • MP341 BULK CHEMICAL STOR DETAILS ADDN 1-1 Uploaded: 4/10/2026 (381 kb)
    • MP341 BULK CHEMICAL STORAGE Uploaded: 4/10/2026 (380 kb)
    • MP410 FLOOR PLANS Uploaded: 4/10/2026 (229 kb)
    • MP411 FOUNDATION PLANS Uploaded: 4/10/2026 (322 kb)
    • MP412 SECTIONS Uploaded: 4/10/2026 (371 kb)
    • MP420 FLOOR PLANS Uploaded: 4/10/2026 (190 kb)
    • MP421 FOUNDATION PLANS Uploaded: 4/10/2026 (295 kb)
    • MP422 SECTIONS Uploaded: 4/10/2026 (347 kb)
    • MP430 FLOOR PLANS Uploaded: 4/10/2026 (202 kb)
    • MP431 FOUNDATION PLANS Uploaded: 4/10/2026 (291 kb)
    • MP432 SECTIONS Uploaded: 4/10/2026 (315 kb)
    • P001 PLUMBING NOTES LEGENDS Uploaded: 4/10/2026 (560 kb)
    • P101 PLUMBING DEMO PROPOSED SANITARY Uploaded: 4/10/2026 (319 kb)
    • P102 PROPOSED PLUMBING PLANS Uploaded: 4/10/2026 (305 kb)
    • P103 PLUMBING SCHEDULES Uploaded: 4/10/2026 (231 kb)
    • P201 FIRST LEVEL PLUMBING PLAN Uploaded: 4/10/2026 (386 kb)
    • P202 SECOND LEVEL PLUMBING PLAN Uploaded: 4/10/2026 (286 kb)
    • P203 ROOF DRAINAGE PLAN Uploaded: 4/10/2026 (266 kb)
    • P204 SANITARY ROOF DRAIN ISOMETRIC Uploaded: 4/10/2026 (417 kb)
    • P205 DOMESTIC WATER SYSTEMS ISOMETRIC Uploaded: 4/10/2026 (337 kb)
    • P206 SLUDGE PROCESSING PLAN Uploaded: 4/10/2026 (509 kb)
    • P207 PUMP ROOM PLAN Uploaded: 4/10/2026 (493 kb)
    • P208 BLOWER SCREEN RM FLR PLAN Uploaded: 4/10/2026 (420 kb)
    • P209 DISINFECTION RM PLAN Uploaded: 4/10/2026 (467 kb)
    • P210 PLUMBING SCHEDULES Uploaded: 4/10/2026 (266 kb)
    • S001 GENERAL NOTES Uploaded: 4/10/2026 (942 kb)
    • S101 GROUND LEVEL PLAN Uploaded: 4/10/2026 (219 kb)
    • S102 VESTIBULE DETAILS Uploaded: 4/10/2026 (303 kb)
    • S103 DETAILS SECTIONS Uploaded: 4/10/2026 (357 kb)
    • S201 FOUNDATION PLAN Uploaded: 4/10/2026 (433 kb)
    • S202 FIRST LEVEL SLAB PLAN Uploaded: 4/10/2026 (514 kb)
    • S203 SECOND LEVEL FRAM ADDN 2-1 Uploaded: 4/10/2026 (538 kb)
    • S203 SECOND LEVEL FRAMING PLAN Uploaded: 4/10/2026 (501 kb)
    • S204 SECOND LEVEL FLOOR PLAN Uploaded: 4/10/2026 (286 kb)
    • S205 ROOF FRAM ADDN 2-1 Uploaded: 4/10/2026 (306 kb)
    • S205 ROOF FRAMING PLAN Uploaded: 4/10/2026 (300 kb)
    • S206 WALL SECTION DETAILS Uploaded: 4/10/2026 (693 kb)
    • S206 WALL SECTION DETAILS ADDN 2-1 Uploaded: 4/10/2026 (743 kb)
    • S207 WALL SECTION DETAILS Uploaded: 4/10/2026 (593 kb)
    • S208 WALL SECTION DETAILS Uploaded: 4/10/2026 (753 kb)
    • S209 WALL SECTION DETAILS Uploaded: 4/10/2026 (495 kb)
    • S209 WALL SECTION DETAILS ADDN 2-1 Uploaded: 4/10/2026 (530 kb)
    • S210 WALL SECTION DETAILS Uploaded: 4/10/2026 (582 kb)
    • S210 WALL SECTION DETAILS ADDN 2-1 Uploaded: 4/10/2026 (626 kb)
    • S211 WALL SECTION DETAILS Uploaded: 4/10/2026 (486 kb)
    • S212 STAIR PLANS AND DETAILS Uploaded: 4/10/2026 (443 kb)
    • S213 STAIR A PLAN AND DETAILS Uploaded: 4/10/2026 (444 kb)
    • S214 STAIR B PLAN AND DETAILS Uploaded: 4/10/2026 (441 kb)
    • S215 CONCRETE MASONRY DETAILS Uploaded: 4/10/2026 (504 kb)
    • S216 STAIR LADDER DETAILS Uploaded: 4/10/2026 (330 kb)
    • S230 TANK SLAB Uploaded: 4/10/2026 (297 kb)
    • S231 TANK WALL REINFORCING Uploaded: 4/10/2026 (385 kb)
    • S232 TANK WALKWAY PLAN Uploaded: 4/10/2026 (356 kb)
    • S232 TANK WALKWAY PLAN ADDN 1-1 Uploaded: 4/10/2026 (365 kb)
    • S233 TANK WALL SECTIONS Uploaded: 4/10/2026 (433 kb)
    • S234 TANK WALL SECTIONS Uploaded: 4/10/2026 (522 kb)
    • S235 TANK STAIR PLAN SECTIONS Uploaded: 4/10/2026 (421 kb)
    • S301 WET WELL PLAN Uploaded: 4/10/2026 (222 kb)
    • S310 INFLUENT WET WELL PLANS Uploaded: 4/10/2026 (250 kb)
    • S311 INFLUENT WET WELL SECTIONS Uploaded: 4/10/2026 (271 kb)
    • S312 INFLUENT WET WELL CANOPY Uploaded: 4/10/2026 (331 kb)
    • S320 EFFLUENT AERATION TANK Uploaded: 4/10/2026 (194 kb)
    • S321 EFFLUENT AERATION TANK Uploaded: 4/10/2026 (172 kb)
    • S322 EFFLUENT AERATION BLOWER Uploaded: 4/10/2026 (181 kb)
    • S340 BULK CHEMICAL STORAGE Uploaded: 4/10/2026 (270 kb)
    • S340 BULK CHEMICAL STORAGE ADDN 1-1 Uploaded: 4/10/2026 (284 kb)
    • S350 STAND-BY GENERATOR Uploaded: 4/10/2026 (170 kb)
    • S370 FOUNDATION PLAN Uploaded: 4/10/2026 (265 kb)
    • S401 PANEL MOUNTING STAND Uploaded: 4/10/2026 (336 kb)
    • S410 PUMP STATION FLR PLAN Uploaded: 4/10/2026 (282 kb)
    • S411 VAULT PLANS AND DETAILS Uploaded: 4/10/2026 (320 kb)
    • Thumbs-3 Uploaded: 4/10/2026 (43 kb)
  • BABA Guidelines.pdf Uploaded: 4/9/2026 (492 kb)

Project Info

Project # 26-011
Project Name GC - BCI Municipal Authority WWTP
Location BCI Municipal Authority
Address Map It 625 Cressview Street
City Irvona
State PA
Zip 16656
Bid Date April 16, 2026
Bid Time 2:00 PM
 
Scope

This project includes the following Work: Construction of a new Treatment Building which will have equipment including sequencing batch reactors, aerobic digesters, and all pumps, blowers, piping, wiring, and appurtenances necessary. Construction also includes rehabilitation of the existing Control Building and sewage pump stations, as well as new influent wet well, effluent aeration, and chemical storage facilities. Work also involves demolition of all decommissioned equipment and piping.
 
 !!!Pleaese only submit bids for Contract 2026-1 General/Mechanical. We are not Bidding Contract 2026-5 Pump Station Work.!!!!
Plans
Other Info

We are requesting pricing for the following specification sections:
 
Section 024116 Structure Demolition
Section 024119 Selective Demolition
Section 028800 Solids Removal and Dewatering

Section 033053 Miscellaneous Cast-In-Place Concrete
Section 033100 Structural Concrete
Section 034113 Precast Concrete Hollow Core Planks

Section 042000 Unit Masonry
Section 050519 Post-Installed Anchors

Section 051200 Structural Steel Framing
Section 054000 Cold-Formed Metal Framing
Section 055000 Metal Fabrications
Section 055119 Metal Grating Stairs
Section 055150 Ladders
Section 055213 Pipe and Tube Railings

Section 061000 Rough Carpentry
Section 061600 Sheathing
Section 064116 Plastic Laminate-Faced Architectural Cabinets
Section 066500 Plastic Trim
Section 067013 Fiber Reinforced Polymer (FRP) Fabrications

Section 071113 Bituminous Dampproofing
Section 072100 Thermal Insulation
Section 072726 Fluid-Applied Membrane Air Barriers
Section 074113 Metal Roof Panels
Section 074213 Metal Wall Panels
Section 075323 EPDM Roofing
Section 077150 Roof Specialties and Accessories
Section 077233 Roof Hatches
Section 077253 Snow Guards
Section 077273 Roof Edge Protection Systems
Section 078413 Penetration Firestopping
Section 079200 Joint Sealants
Section 079500 Expansion Control

Section 081113 Hollow Metal Doors and Frames
Section 081119 Stainless-Steel Doors and Frames
Section 081416 Flush Wood Doors
Section 081616 Fiberglass Reinforced Plastic (FRP) Doors and Frames
Section 083013 Specialty Doors and Frames
Section 083123 Floor Doors
Section 083323 Overhead Coiling Doors
Section 084113 Aluminum-Framed Entrances and Storefronts
Section 084523 Fiberglass-Sandwich-Panel Assemblies
Section 085413 Fiberglass Reinforced Plastic (FRP) Windows
Section 087100 Door Hardware

Section 092900 Gypsum Board
Section 095113 Acoustical Panel Ceilings
Section 095421 Linear Metal Ceilings
Section 096513 Resilient Base and Accessories
Section 096519 Resilient Tile Flooring
Section 096813 Tile Carpeting
Section 099100 Painting

Section 101400 Signage
Section 102800 Toilet, Bath, and Workplace Accessories
Section 104416 Fire Extinguishers
Section 105113 Metal Lockers and Benches
Section 108013 Miscellaneous Accessories

Section 111313 Loading Dock Bumpers
Section 114330 Electric Hauling Winches
Section 115300 Laboratory Equipment

Section 122113 Horizontal Louver Blinds
Section 122123 Roller Shades
Section 123553 Laboratory Casework
Section 123623 Plastic-Laminate-Clad Countertops
Section 125100 Office Furniture
Section 125700 Industrial Furniture

Section 133423 Portable and Mobile Buildings

Section 212400 Dry Chemical Fire Extinguishing Systems

Section 311000 Site Clearing
Section 312213 Rough Grading
Section 312316 Structural Excavation, Backfill, and Compaction
Section 312319 Dewatering
Section 312333 Trenching and Backfilling
Section 315000 Excavation Support and Protection
Section 316613 Ground Improvements

Section 321113 Chain Link Fences and Gates
Section 321216 Asphalt Paving
Section 321219 Finish Grading
Section 321313 Concrete Paving
Section 321500 Aggregate Surfacing
Section 321610 Curbs, Gutters, and Sidewalks
Section 329000 Planting

Section 330110 Testing and Disinfection of Water Piping Systems
Section 330561 Concrete Manholes
Section 330563 Concrete Vaults and Chambers
Section 330564 Protective Lining for Concrete Structures
Section 333100 Sanitary Sewerage Piping
Section 333212 Sewage Pumping Stations
Section 334200 Stormwater Conveyance

Section 400507 Hangers and Supports for Process Piping
Section 400510 Process Piping, Valves and Appurtenances
Section 400598 Identification for Valves and Process Equipment
Section 407590 Refrigerated Sampler

Section 411213 Shaftless Screw Conveyor
Section 412213 Bridge Cranes
Section 412219 Portable Davit Cranes
Section 412223 Hoists and Hoist Trolleys
Section 412233 Pallet Jack / Stacker

Section 431133 Rotary Lobe Blowers
Section 431134 Effluent Aeration Rotary Lobe Blower
Section 432305 Mixing Pumps
Section 432310 Influent Wet Well Pumps
Section 432315 Effluent Re-Use PumpSection 432316 Effluent Re-Use System
Section 432378 Reciprocating Positive Displacement Pumps
Section 462100 Screening Equipment
Section 463300 Liquid Chemical Feed Equipment and Appurtenances
Section 465121 Coarse Bubble Diffusers
Section 465139 Fine Bubble Diffusers
Section 465353 Sequencing Batch Reactor
Section 466600 Ultraviolet Disinfection Equipment
Section 467626 Rotary Press
 
 

Notices

If you are looking for attached files related to a Notice, go back to the Home tab ("Project Files" are on the right side).
Title Created By Created On
GC - BCI Municipal Authority WWTP Valerie Slagle 3/11/2026
Notice of Addendum 1 Valerie Slagle 3/23/2026
Notice of Addendum 2 Valerie Slagle 4/1/2026
Notice of Addendum 3 Valerie Slagle 4/6/2026
Build America Buy America (BABA) Act requirement reminder Valerie Slagle 4/9/2026
Notice of Addendum 4 Valerie Slagle 4/10/2026

Lobar, Inc. Contacts

Company Contact Title Phone Extension Fax Email
Lobar, Inc Aaron Eichelberger Estimator 717-432-9728 AaronE@lobar.com
Lobar, Inc. Eric Bowen Estimator 717-432-9728 4289 eric.bowen@lobar.com