PLANET FITNESS-CONSTITUTION BLVD.

Project Files

  • CARPENTRY - SCOPE SHEETS - PF CONSTITUTION AVE. - COLORADO SPRINGS CO.pdf Uploaded: 12/8/2020 (251 kb)
  • CERAMIC TILE - SCOPE SHEETS - PF CONSTITUTION AVE. - COLORADO SPRINGS CO.pdf Uploaded: 12/8/2020 (263 kb)
  • CONCRETE - SCOPE SHEETS - PF CONSTITUTION AVE. - COLORADO SPRINGS CO.pdf Uploaded: 12/8/2020 (257 kb)
  • DEMO - SCOPE SHEETS - PF CONSTITUTION AVE. - COLORADO SPRINGS CO.pdf Uploaded: 12/8/2020 (267 kb)
  • DRYWALL - SCOPE SHEETS - PF CONSTITUTION AVE. - COLORADO SPRINGS CO.pdf Uploaded: 12/8/2020 (271 kb)
  • ELECTRICAL - SCOPE SHEETS - PF CONSTITUTION AVE. - COLORADO SPRINGS CO.pdf Uploaded: 12/8/2020 (267 kb)
  • FIRE ALARM - SCOPE SHEETS - PF CONSTITUTION AVE. - COLORADO SPRINGS CO.pdf Uploaded: 12/8/2020 (255 kb)
  • Full Set_111920.pdf Uploaded: 11/20/2020 (2037 kb)
  • GLASS - SCOPE SHEETS - PF CONSTITUTION AVE. - COLORADO SPRINGS CO.pdf Uploaded: 12/8/2020 (255 kb)
  • GRANITE - SCOPE SHEETS - PF CONSTITUTION AVE. - COLORADO SPRINGS CO.pdf Uploaded: 12/8/2020 (260 kb)
  • HVAC - SCOPE SHEETS - PF CONSTITUTION AVE. - COLORADO SPRINGS CO.pdf Uploaded: 12/8/2020 (253 kb)
  • PAINTING - SCOPE SHEETS - PF CONSTITUTION AVE. - COLORADO SPRINGS CO.pdf Uploaded: 12/8/2020 (267 kb)
  • PLUMBING - SCOPE SHEETS - PF CONSTITUTION AVE. - COLORADO SPRINGS CO.pdf Uploaded: 12/8/2020 (260 kb)
  • SPRINKLER - SCOPE SHEETS - PF CONSTITUTION AVE. - COLORADO SPRINGS CO.pdf Uploaded: 12/8/2020 (259 kb)

Project Info

Project #
Project Name PLANET FITNESS-CONSTITUTION BLVD.
Location 5849 CONSTITUTION AVE, COLORADO SPRINGS, CO
Address Map It 5849 CONSTITUTION AVE, COLORADO SPRINGS CO.
City COLORADO SPRINGS
State CO
Zip 80918
Bid Date December 7, 2020
Bid Time 5:00 PM
 
Scope UPDATED INVITATION: PLEASE LOOK OVER.

FLYNN CONSTRUCTION WOULD LIKE TO INVITE YOUR FIRM TO BID ON THE
PLANET FITNESS ON CONSTITUTION AVE, COLORADO SPRINGS.  "
This project is the remodel of an existing Planet Fitness located at 5849 Constitution Ave. in Colorado Springs, CO. This project will be done in phases, behind barricades, with work creating excessive noise being done during off-hours.”  THE LINK TO THE DRAWINGS IS UNDER THE PROJECT NOTES.


TRADES NEEDED:

DEMO (REMOVE FLOORING, WALLS, TILE, SIGNS, WALLS, ACT AS NOTED, LIGHTS, COUNTERS, FIXTURES KEEP FOR REUSE, FIBERGLASS SHOWER INSERTS, CURBS AND PANS, MIRRORS AS NOTED, WAINSCOT AS NOTED, ETC...)
CONCRETE CUT & PATCH (SAWCUT, REMOVE, HAUL-OFF & POUR BACK FOR PLUMBING TRENCHES/SHOWER AREA)

GRANITE (NEW COUNTER AS NOTED ON PLANS, ETC...)
CARPENTRY  (INSTALLS-WAINSCOT, SIGNAGE, FRP, ETC....)
GLASS/GLAZING (FURNISH & INSTALL NEW FRAMELESS GLASS DOORS)
DRYWALL/ROUGH CARPENTRY/ ACOUSTICAL CEILINGS  (NEW WALLS, NEW SOFFITS, NEW BARRELL SOFFIT, NEW ACT AS NOTED, FURNISH & INSTALL FRP, INSTALLS, ETC...)
CERAMIC TILE (INSTALL TILE FOR FLOORS, WALLS, ETC.. AS NOTED ON PLANS)
PAINTING (WALLS AS NOTED, SOFFITS, TRIM, ALL EXPOSED STEEL COLUMNS, DOORS & FRAMES, INSTALL NEW WALL PAPER AS NOTED, ETC...)
BATHROOM ACCESSORIES
SPRINKLERS (MODIFY FOR NEW LAYOUT)
PLUMBING (NEW FIXTURES AS NOTED, DISCONNECT EXISTING FIXTURES, REINSTALL EXISTING FIXTURES, REINSTALL EXISTING FIXTURES, ETC...)
HVAC (REUSE/REINSTALL EXISTING FIXTURES IN NEW DROP CEILING, ALL LAYI-IN HVAC FIXTURES IN DROP CEILING SYSTEMS BEING REMOVED ARE TO BE TEMP. SAVED OR COILED IN PLACE FROM THE ROOF STRUCTURE ABOVE IN PREPARATION OF BEING RE-INSTALLED AT HEIR CURRENT LOCATION ONCE NEW DROP CEILING SYSTEMS ARE INSTALLED.)
ELECTRICAL (DEMO, INSTALL LIGHT FIXTURES, REINSTALL FIXTURES, MODIFY AS NOTED, ETC...)
FIRE ALARM (MODIFY FOR NEW LAY OUT)
LIGHT FIXTURES

 


Plans IN ORDER TO OBTAI IN THE PLANS, PLEASE FOLLOW THESE INSTRUCTIONS:

1.  Click on the link in this email that says RESPOND AND VIEW PLANS
2.  Enter t
he Project Key and security Key Codes where promtped (this info can be found at the bottom of this email.)
3.  Click on the tab that says PROJECT FILES
4.  Here you would download the plans Titled
       PLANS
Other Info PROJECT NOTES:

1.   TYPICAL PROJECT OF THIS SIZE TAKES AROUND 12-16 WEEKS.

2.   THIS PROJECT WILL BE DONE UTILIZING OPEN SHOP TRADES.

3.   PROJECT IS SCHEDULED TO START ASAP

4.  ALL TRADES SHOULD INCLUDE PERMIT FEES IN THEIR PROPOSALS AS APPLICABLE.

5.   ALL SUBCONTRACTORS WORKING WITH FLYNN CONSTRUCTION ARE REQUIRED TO CARRY WORKMENS COMP INSURANCE.

6.   ALL SUBCONTRACTORS SHOULD CARRY APPLICABLE TAXES IN THEIR QUOTES.

7.   PLEASE DO NOT CONTACT THE ARCHITECT OR OWNER WITH ANY PROJECT QUESTIONS.  ALL QUESTIONS GO TO FLYNN CONSTRUCTION.

8.  DROPBOX LINK TO THE DRAWINGS BELOW:

https://www.dropbox.com/sh/hct8m5u1z4q058k/AAC1Jjzk4uxdWqEbZDo9x0qWa?dl=0


9.   SCOPE SHEETS FOR TRADES BASED ON DRAWINGS WILL BE COMPLETED BY FLYNN & SENT AT A LATER DATE.

10.  FLYNN WILL BE CONDUCTING ON SITE VISITS OF THE SPACE-HARD COPIES OF THE PLANS WILL BE AVAILABLE AT THIS TIME FOR YOU TO TAKE WITH YOU-DATES AND TIMES WILL BE ANNOUNCED VIA MEMO AT A LATER DATE.

11.  VALUE ENGINEERING IDEAS AND ASSOCIATED COST SAVINGS ARE ALWAYS WELCOME.  PLEASE THINK ABOUT ANY IDEAS YOU MAY HAVE AND PRESENT THEM WITH YOUR BID.

12.  
SEND ALL QUESTIONS REGARDING OBTANING BID DOCUMENTS TO: BID DEPARTMENT EMAIL ADDRESS: jchiappialle@flynn-construction.com 
  
13.  SEND ALL PROJECT QUESTIONS VIA EMAIL TO CONTACT BELOW: 

ROLANDA ROSAK-EMAIL-RROSAK@FLYNN-CONSTRUCTION.COM  (direct dial) 412-342-0548(cell) 412-439-3256

14.  FLYNN IS LOOKING FOR SERIOUS AND QUALIFIED BIDDERS ONLY.  WE ONLY ADD A FEW TO OUR BID LIST SO PLEASE LET  US KNOW IF YOU ARE NOT ABLE TO QUOTE FOR ANY REASON SO THAT WE CAN SUPPLEMENT YOUR COMPANY WITH ANOTHER.

15.  ALL BID PROPOSALS ARE TO BE EMAILED TO:  biddept@flynn-construction.com  OR  FAXED TO 412-243-7925

Notices

If you are looking for attached files related to a Notice, go back to the Home tab ("Project Files" are on the right side).
Title Created By Created On
PLANET FITNESS NOTICE-SITE VISIT-PF-CONSTITUTION BLVD, COLORADO SPRINGS, CO Judy Chiappialle 11/18/2020
DRAWINGS PLANET FITNESS-CONSTITUTION BLVD. COLORADO SPRINGS, CO Judy Chiappialle 11/20/2020
SITE PICTURES FOR THE PLANET FITNESS-CONSTITUTION BLVD. CO Judy Chiappialle 11/23/2020
BIDS DUE-PLANET FITNESS-CONSTITUTION BLVD. COLORADO SPRINGS, CO Judy Chiappialle 12/7/2020
LAST CALL FOR BIDS-PF-CONSTITUTION BLVD, COLORADO SPRINGS, CO Judy Chiappialle 12/7/2020
CARPENTRY SCOPE SHEETS-PF-CONSTITUTION BLVD, CO Judy Chiappialle 12/8/2020
CERAMIC TILE SCOPE SHEETS-PF-CONSTITUTION BLVD,CO Judy Chiappialle 12/8/2020
CONCRETE SCOPE SHEETS-CONSTITUTION BLVD, CO Judy Chiappialle 12/8/2020
DEMOLITION SCOPE SHEETS-PF-CONSTITUTION BLVD, CO Judy Chiappialle 12/8/2020
DRYWALL SCOPE SHEETS-PF-CONSTITUTION BLVD,CO Judy Chiappialle 12/8/2020
ELECTRICAL SCOPE SHEETS-PF-CONSTITUTION BLVD, CO Judy Chiappialle 12/8/2020
FIRE ALARM SCOPE SHEETS-PF-CONSTITUTION BLVD, CO Judy Chiappialle 12/8/2020
GLASS SCOPE SHEETS-PF-CONSTITUTION BLVD, CO Judy Chiappialle 12/8/2020
GLASS SCOPE SHEETS-PF-CONSTITUTION BLVD, CO Judy Chiappialle 12/8/2020
GRANITE SCOPE SHEETS-PF-CONSTITUTION BLVD, CO Judy Chiappialle 12/8/2020
HVAC SCOPE SHEETS-PF-CONSTITUTION BLVD, CO Judy Chiappialle 12/8/2020
PAINTING SCOPE SHEETS-CONSTITUTION BLVD, CO Judy Chiappialle 12/8/2020
PLUMBING SCOPE SHEETS-PF-CONSTITUTION BLVD. CO Judy Chiappialle 12/8/2020
SPRINKLER SCOPE SHEETS-PF-CONSTITUTION BLVD, CO Judy Chiappialle 12/8/2020

Estimators

Company Estimator Phone Extension Fax Email
Flynn Construction Joe Cerar 412-342-0545 238 412-243-7925 jcerar@flynn-construction.com

If you have project-related questions, please contact your contractor or use the "Submit Question" tab.
If you are having technical difficulties downloading, please email support@pipelinesuite.com or call 949-222-0400.