RESTORE HYPER WELLNESS + CRYOTHERAPY - HAPPY VALLEY, OR

Project Files

  • ITB - Restore - Happy Valley OR - JC.pdf Uploaded: 9/3/2021 (48 kb)
  • PROJECT NOTES - Restore - Happy Valley OR.pdf Uploaded: 9/3/2021 (203 kb)
  • RESTORE - MASTER SPEC AND INSTALL INSTRUCTIONS.pdf Uploaded: 9/3/2021 (110300 kb)
  • Restore - Happy Valley OR - FULL SET DWGS - 08.24.21.pdf Uploaded: 9/3/2021 (29311 kb)

Project Info

Project #
Project Name RESTORE HYPER WELLNESS + CRYOTHERAPY - HAPPY VALLEY, OR
Location 13140 SE 172ND AVE, HAPPY VALLEY, OR 97086
Address Map It 13140 SE 172ND AVE.
City HAPPY VALLEY
State OR
Zip 97086
Bid Date September 20, 2021
Bid Time 5:00 PM
 
Scope FLYNN CONSTRUCTION WOULD LIKE TO INVITE YOUR COMPANY TO BID ON THE RESTORE HYPER WELLNESS & CRYOTHERAPY  IN HAPPY VALLEY, OR.  THIS PROJECT IS THE INTERIOR BUILD-OUT OF AN EXISTING SPACE FOR A NEW RESTORE HYPER WELLNESS & CRYOTHERAPY CENTER.  THE SPACE IS APPROXIMATELY 2,443 SF AND IS LOCATED AT 13140 SE 172ND AVE. IN HAPPY VALLEY, OR..  THE NEW LAYOUT CONSISTS OF A RECEPTION AREA, VARIOUS CARE ROOMS, RESTROOMS, A SAUNA, AND A SHOWER.

**SEND ALL QUESTIONS TO JOE CERAR BY SEPTEMBER 10TH**.    

TRADES NEEDED:

CONCRETE CUT & PATCH (SAWCUT, REMOVAL  AND POURBACK FOR UNDERGROUND PLUMBING AND ELECTRICAL TRENCHES, CRYO-TANK PAD, ETC)
CASEWORK/ MILLWORK (RECEPTION DESK, OFFICE, CRYOSKIN CABINETS, ETC)
INSULATION (IN-WALL BATT INSULATION)
DOORS & HARDWARE (FURNISH & DELIVER)
GLASS/ GLAZING (WINDOWS & FRAMES, WINDOW TINT,  WOOD DOOR LITE, GLASS DOOR & HARDWARE, ETC)
DRYWALL/ ROUGH CARPENTRY/ ACOUSTICAL CEILINGS (PARTITIONS, BRACING, BLOCKING, INSULATION, BULKHEADS, FRP, ACT, LIGHT GUAGE JOIST, BOX HEADER, ETC)
CERAMIC TILE (FURNISH & INSTALL  WALL & FLOOR TILE, SETTING MATERIALS, SCHLUTER, GROUT, ETC)
FLOORING (FURNISH & INSTALL LVT, RUBBER BASE, ADHESIVES, TRANSITIONS, SEAL CONCRETE, ETC)
QUARTZ (FURNISH & INSTALL COUNTERTOPS - RECEPTION DESK)
PAINTING (INTERIOR COMPLETE - WALLS, CEILINGS, DOORS/FRAMES, ETC)
BATHROOM ACCESSORIES (FURNISH & DELIVER)
SIGNAGE (FURNISH & DELIVER DESK SIGN)
SPRINKLER (DRAWINGS, PERMIT, MODIFY EXISTING SYSTEM FOR NEW LAYOUT)
PLUMBING (UNDERGROUND, WATER PIPING, VENTS, FURNISH & INSTALL FIXTURES, DRAINS, ETC)
HVAC (FURNISH & INSTALL DUCTTLESS SPLIT SYSTEM, EXHAUST FANS, CURBS & ACCESSORIES, DUCTWORK, THERMOSTATS, DIFFUSERS, GRILLS, CRYO SAUNA WORK, ETC)
ELECTRICAL (UNDERGROUND, WIRING, LIGHT CONTROLS, OXYGEN MONITORING SYSTEM, POWER TO EQUIPMENT, LOW VOLTAGE STUBS & PULL STRINGS, INSTALL LILGHT FIXTURES PROVIDED BY OTHERS, ETC)
FIRE ALARM (DRAWINGS, PERMIT, MODIFY EXISTING SYSTEM FOR NEW LAYOUT)


Plans
IN ORDER TO OBTAIN THE PLANS, PLEASE FOLLOW THESE INSTRUCTIONS:

1.  Click on the link in this email that says RESPOND AND VIEW PLANS.  Enter the Project Key and security Key Codes where promtped (this info can be found at the bottom of this email.)
3.  Click on the tab that says PROJECT FILES
4.  Here you would download the plans Titled
       PLANS

Other Info
PROJECT NOTES:

1.   TYPICAL PROJECT SCHEDULES FOR 8 WEEKS


2.   THIS PROJECT WILL BE DONE UTILIZING OPEN SHOP TRADES

3.   PROJECT IS SCHEDULED TO START PENDING PERMITS

4.  ALL TRADES SHOULD INCLUDE PERMIT FEES IN THEIR PROPOSALS AS APPLICABLE.

5.  ALL SUBCONTRACTORS MUST HAVE PROPER LICENSING (STATE, CITY/LOCAL, ETC) AS APPLICABLE.

6.   ALL SUBCONTRACTORS WORKING WITH FLYNN CONSTRUCTION ARE REQUIRED TO CARRY WORKMENS COMP INSURANCE.

7.   ALL SUBCONTRACTORS SHOULD CARRY APPLICABLE TAXES IN THEIR QUOTES.

8.   PLEASE DO NOT CONTACT THE ARCHITECT OR OWNER WITH ANY PROJECT QUESTIONS.  ALL QUESTIONS GO TO FLYNN CONSTRUCTION.

9.  DROPBOX LINK TO THE DRAWINGS BELOW:

https://www.dropbox.com/sh/sd8ars3v9pbgkc4/AACycPd0kkI2by-sHa6jrN6Fa?dl=0

10.   SCOPE SHEETS FOR TRADES BASED ON DRAWINGS WILL BE COMPLETED BY FLYNN & SENT AT A LATER DATE.

11.  VALUE ENGINEERING IDEAS AND ASSOCIATED COST SAVINGS ARE ALWAYS WELCOME.  PLEASE THINK ABOUT ANY IDEAS YOU MAY HAVE AND PRESENT THEM WITH YOUR BID.

12.  SEND ALL QUESTIONS REGARDING OBTANING BID DOCUMENTS TO: BID DEPARTMENT EMAIL ADDRESS: lgood@flynn-construction.com


13.  SEND ALL PROJECT QUESTIONS VIA EMAIL TO CONTACT BELOW: 


          Joe Cerar (Email) jcerar@flynn-construction.com  (Direct Dial) 412-342-0545 or (cell) 412-738-4942

14.  FLYNN IS LOOKING FOR SERIOUS AND QUALIFIED BIDDERS ONLY.  WE ONLY ADD A FEW TO OUR BID LIST SO PLEASE LET  US KNOW IF YOU ARE NOT ABLE TO QUOTE FOR ANY REASON SO THAT WE CAN SUPPLEMENT YOUR COMPANY WITH ANOTHER.

15.  ALL BID PROPOSALS ARE TO BE EMAILED TO:  lgood@flynn-construction.com     OR  FAXED TO 412-243-7925

Notices

If you are looking for attached files related to a Notice, go back to the Home tab ("Project Files" are on the right side).
Title Created By Created On
CONCRETE TAKE-OFF - RESTORE HYPER WELLNESS + CRYOTHERAPY - HAPPY VALLEY, OR Lisa Good 9/9/2021
BIDS DUE - RESTORE HYPER WELLNESS + CRYOTHERAPY - HAPPY VALLEY, OR Lisa Good 9/17/2021
LAST CALL FOR BIDS - RESTORE HYPER WELLNESS + CRYOTHERAPY - HAPPY VALLEY, OR Lisa Good 9/20/2021
PROJECT STATUS - RESTORE HYPER WELLNESS + CRYOTHERAPY - HAPPY VALLEY, OR Lisa Good 10/18/2021

Estimators

Company Estimator Phone Extension Fax Email
Flynn Construction Joe Cerar 412-342-0545 238 412-243-7925 jcerar@flynn-construction.com

Contacts
Type Company Estimator Phone Extension Fax Email
Flynn Construction Lisa Good 412-342-0550 234 412-243-7925 lgood@flynn-construction.com

If you have project-related questions, please contact your contractor or use the "Submit Question" tab.
If you are having technical difficulties downloading, please email support@pipelinesuite.com or call 949-222-0400.