2021-007AC - Electrical - West Seattle Corridor Bridges Rehabilitation and Strengthening

Project Files

  • ITB
    • 21-007AC_Package 4 ITB Signature Page - signed.pdf Uploaded: 10/20/2021 (692 kb)
    • Package 04 Electrical ITB_11.12.21 rev2.pdf Uploaded: 11/12/2021 (124 kb)
    • Package 04 Electrical Q and A.pdf Uploaded: 11/12/2021 (309 kb)
  • Schedule
    • Schedule 2021.08.27 All Activities.pdf Uploaded: 10/8/2021 (1570 kb)
  • Addendum 3
    • Part 6
      • FHWA - 1273.pdf Uploaded: 10/19/2021 (237 kb)
      • Joint Matrix For Specs 2021-10-08.pdf Uploaded: 10/19/2021 (694 kb)
      • WSCBRS_Basis of Quantities - Addendum No. 3.pdf Uploaded: 10/21/2021 (47 kb)
      • WSDOT 272-054.PDF Uploaded: 10/19/2021 (799 kb)
      • WSDOT 272-056.PDF Uploaded: 10/19/2021 (338 kb)
      • WSDOT 272-058.PDF Uploaded: 10/19/2021 (690 kb)
      • WSDOT 272-065.pdf Uploaded: 10/19/2021 (121 kb)
      • WSDOT 420-004.PDF Uploaded: 10/19/2021 (99 kb)
      • WSDOT 421-012.PDF Uploaded: 10/19/2021 (1456 kb)
      • WSDOT 422-031.PDF Uploaded: 10/19/2021 (410 kb)
    • WSCBRS - CSC Parts 1-4 Terms-Exec-Perf-NSS - Addendum No. 3.pdf Uploaded: 10/19/2021 (1497 kb)
    • WSCBRS - Part 5 Technical Requirements - Addendum No. 3.pdf Uploaded: 10/19/2021 (714 kb)
    • WSCBRS - Plan Set - FinalSbmtl for Review - Addendum No. 3.pdf Uploaded: 10/19/2021 (56681 kb)
    • WSCBRS Bid Form - Addendum No. 3.pdf Uploaded: 10/19/2021 (85 kb)
    • WSCBRS_Addendum No 3 - Revision Log.xlsx Uploaded: 10/19/2021 (22 kb)
  • Contract Documents
    • 17142 Seattle DOT - West Seattle Bridge AS and LS Survey 8.25.21.pdf Uploaded: 9/8/2021 (23488 kb)
    • 21-007A-AC_Attachment 4_WSB_Specified_General_Conditions 1.pdf Uploaded: 10/19/2021 (397 kb)
    • 21-007A-AC_Attachment 7_Cost Allocation Matrix Final 03-08-21.pdf Uploaded: 9/8/2021 (55 kb)
    • Bridge Safety Tag-Out Testing Procedures.pdf Uploaded: 9/8/2021 (30 kb)
    • Hazardous Materials Screening WSHB Program Final.pdf Uploaded: 9/8/2021 (984 kb)
    • Low Bridge Openings 2019.xlsx Uploaded: 9/8/2021 (131 kb)
    • Low Bridge Openings 2020.xlsx Uploaded: 9/8/2021 (141 kb)
    • SGCN Complete 2015 List.pdf Uploaded: 9/8/2021 (164 kb)
    • SeattleDOT authorization letter 2021.pdf Uploaded: 9/8/2021 (65 kb)
    • ShorelineExemption_WSHB.pdf Uploaded: 9/8/2021 (242 kb)
    • Swing Bridge Operating Cost.xlsx Uploaded: 9/8/2021 (42 kb)
    • Utility Identification Appendix.pdf Uploaded: 9/8/2021 (88677 kb)
    • WSB Specified General Conditions.pdf Uploaded: 9/8/2021 (404 kb)
    • WSB00272.JPG Uploaded: 9/8/2021 (18752 kb)
    • WSB00276.JPG Uploaded: 9/8/2021 (17024 kb)
    • WSB00277.JPG Uploaded: 9/8/2021 (17824 kb)
    • WSB00278.JPG Uploaded: 9/8/2021 (16096 kb)
    • WSB00280.JPG Uploaded: 9/8/2021 (13824 kb)
    • WSB00281.JPG Uploaded: 9/8/2021 (13280 kb)
    • WSB00282.JPG Uploaded: 9/8/2021 (12480 kb)
    • WSB00283.JPG Uploaded: 9/8/2021 (12480 kb)
    • WSCBRS - CSC Parts 1-4 Terms-Exec-Perf-NSS - FinalSbmtl for Review.pdf Uploaded: 9/8/2021 (3239 kb)
    • WSCBRS - Part 5 Technical Requirements - Final Submittal.pdf Uploaded: 9/8/2021 (730 kb)
    • WSCBRS - Plan Set - FinalSbmtl for Review.pdf Uploaded: 9/8/2021 (113157 kb)
    • WSCBRS Monitoring Operations and Response Plan_2021-06-21_Clean.pdf Uploaded: 9/8/2021 (1540 kb)
    • WSCBRS_Basis of Quantities.pdf Uploaded: 9/8/2021 (31 kb)
    • West Seattle Bridge Take Authorization Request.pdf Uploaded: 9/8/2021 (924 kb)
    • West Seattle High-Rise NEPA Reevaluation.pdf Uploaded: 9/8/2021 (462 kb)
  • Archived Documents
    • Package 04 Electrical ITB_10.13.21.pdf Uploaded: 10/20/2021 (117 kb)
    • Package 04 Electrical ITB_11.05.21 rev1.pdf Uploaded: 11/5/2021 (124 kb)
  • Addendum 2
    • WSCBRS - Part 5 Technical Requirements - Addendum No. 2.pdf Uploaded: 9/29/2021 (89 kb)
    • WSCBRS - Plan Set - FinalSbmtl for Review - Addendum No. 2.pdf Uploaded: 9/29/2021 (54759 kb)
    • WSCBRS Bid Form - Addendum No. 2.pdf Uploaded: 9/29/2021 (379 kb)
    • WSCBRS_Addendum No 2 - Revision Log.xlsx Uploaded: 9/29/2021 (22 kb)
  • Addendum 4
    • WSCBRS - CSC Parts 1-4 Terms-Exec-Perf-NSS - Addendum No. 4.pdf Uploaded: 11/5/2021 (1512 kb)
    • WSCBRS - Part 5 Technical Requirements - Addendum No. 4.pdf Uploaded: 11/5/2021 (870 kb)
    • WSCBRS - Plan Set - FinalSbmtl for Review - Addendum No. 4.pdf Uploaded: 11/5/2021 (59696 kb)
    • WSCBRS Bid Form - Addendum No. 4.pdf Uploaded: 11/5/2021 (85 kb)
    • WSCBRS_Addendum No 4 - Revision Log.xlsx Uploaded: 11/5/2021 (21 kb)
  • Addendum 1
    • DRAFT Geotechnical Report West Seattle Corridor Bridge Rehabilitation and Strengthening 09-10-21.pdf Uploaded: 9/29/2021 (47087 kb)
    • Dual-Benefits-Reimbursement.pdf Uploaded: 9/29/2021 (297 kb)
    • Joint Matrix.pdf Uploaded: 9/29/2021 (5334 kb)
    • Pre-Job-Craft-Request.pdf Uploaded: 9/29/2021 (327 kb)
    • Seattle_CWA_final.pdf Uploaded: 9/29/2021 (2096 kb)
    • WSCBRS - CSC Parts 1-4 Terms-Exec-Perf-NSS - Addendum No. 1.pdf Uploaded: 9/29/2021 (42 kb)
    • WSCBRS - Part 5 Technical Requirements - Addendum No. 1.pdf Uploaded: 9/29/2021 (123 kb)
  • Forms
    • 420-004-1.PDF Uploaded: 10/8/2021 (99 kb)
    • 420-004.PDF Uploaded: 9/29/2021 (99 kb)
    • AIA 310 2010 Bid Bond Form.pdf Uploaded: 9/29/2021 (468 kb)
    • AIA Subcontract Performance Payment Bond Forms.pdf Uploaded: 9/29/2021 (1330 kb)
    • KNA Subcontract City of Seattle WA - 21.08.05.dotx Uploaded: 9/29/2021 (91 kb)
    • Letter of Assent Form.pdf Uploaded: 9/29/2021 (159 kb)
    • fas-cpcs-bidder-subcontractor-list-apwa.doc Uploaded: 9/29/2021 (58 kb)
    • fas-cpcs-contracting-social-equity-plan.xlsx Uploaded: 9/29/2021 (289 kb)
    • fas-cpcs-contracting-subcontractor-approval-apwa.doc Uploaded: 9/29/2021 (121 kb)
    • fas-cpcs-contracting-supplemental-bidder-responsibility-criteria.docx Uploaded: 9/29/2021 (70 kb)
    • fas-pc-contracting-WSDOT-272-054_DBE-Bid-Item-Break-Down.PDF Uploaded: 10/8/2021 (799 kb)
    • fas-pc-contracting-WSDOT-272-056_DBE-Utilization-Certification.PDF Uploaded: 10/8/2021 (338 kb)
    • fas-pc-contracting-WSDOT-272-058_DBE-Trucking-Credit.PDF Uploaded: 10/8/2021 (690 kb)
  • COVID-19 Compliance Letter.pdf Uploaded: 9/29/2021 (184 kb)
  • Package 04 Electrical ITB_11.05.21 rev1-1.pdf Uploaded: 11/5/2021 (124 kb)
  • WSCBRS PreBid Slides.pdf Uploaded: 10/15/2021 (7062 kb)

Project Info

Project # PW#2021-007AC
Project Name 2021-007AC - Electrical - West Seattle Corridor Bridges Rehabilitation and Strengthening
Location King County
Address
City Seattle
State WA
Zip
Bid Date November 17, 2021
Bid Time 2:00 PM
 
Scope

Package Request: Pavement Marking as described in the contract documents and the project schedule. Award of the subcontract is pending final approval by the City of Seattle. Pricing to be valid for 60 day.

THIS IS A FEDERALLY FUNDED PROJECT

THE FOLLOWING IS APPLICABLE TO FEDERAL AID PROJECTS: Kraemer North America, LLC  (“Kraemer” or “Contractor”, in accordance with Title VI of the Civil Rights Act of 1964, 78 Stat. 252, 42 U.S.C. 2000d to 2000-4 and Title 49, Code of Federal Regulations, Department of Transportation, Subtitle A, Office of the Secretary, Part 21, Nondiscrimination in Federally Assisted Programs of the Department of Transportation pursuant to such Act, hereby notifies all Bidders that it will affirmatively ensure that in any contract entered into pursuant to this advertisement, Disadvantaged Business Enterprises (DBE) as defined at 49 CFR part 26 will be afforded full opportunity to submit Bids in response to this invitation and will not be discriminated against on the grounds of race, color, national origin, or sex in consideration for an Award. Buy America requirements will apply to this project

 

PROJECT LOCATION:  The project site has two bridges, the Spokane Street Swing Bridge (low-rise)

and the West Seattle Bridge (high-rise), spanning over the West Duwamish Waterway. Leading up to and exiting each bridge are additional elevated structures. The Spokane Street Swing Bridge carries

Southwest Spokane Street and the West Seattle Bridge carries the West Seattle Freeway.  

 

PROJECT DESCRIPTION: The West Seattle Corridor Bridges Rehabilitation and Strengthening project includes rehabilitation of the West Seattle Bridge and Spokane Street Swing Bridge, and miscellaneous

major maintenance work to the elevated structures leading up to the existing bridges. This project will rehabilitate and strengthen both bridges for use by the public.

 

The West Seattle Bridge is a multi-span twin cast-in-place concrete, post-tensioned segmental concrete box girder bridge. In 2020, the West Seattle Bridge was closed and partially rehabilitated (i.e., Phase I stabilization measures) with external post-tensioning and carbon fiber reinforced polymer (CFRP) sheets in response to accelerated cracking observed on the bridge. This project will install additional external post-tensioning and both internal and external CFRP (i.e., Phase II rehabilitation measures), which will augment the Phase I stabilization measures installed in 2020. Work will also include soil densification at Pier 18 (easternmost expansion pier) and miscellaneous major maintenance work on the corridor. 

 

The Spokane Street Swing Bridge is a post-tensioned segmental cast-in-place concrete box girder movable bridge. In 2020, cracking was observed on the Spokane Street Swing Bridge. Further assessment of the bridge was conducted to determine cause of the cracking and identify rehabilitation needs. The Spokane Street Swing Bridge rehabilitation will include installation of CRFP on the bridge box girder.  

 

DBE REQUIREMENT:  The Prime Contract will have a mandatory DBE goal of 2%, Note: City of Seattle Inclusion Plan requirements are not applicable on FHWA funded projects. This package has DBE goal of 25% 

CWA Requirements:

This project will have a mandatory Community Workforce Agreement (CWA) requirement. Submitting a proposal the bidder agrees to participate and meet of the CWA.

Plans Invitation to Bid (ITB) Prime Contract documents (including plans, specs), 60% schedule, and all  other project documents can be found in the pipeline plan room.
Other Info

Quotes are due by November 17th, 2021 at 2:00 PM PT


Quotes should be emailed to the West Seattle project team at WestSeattleBids@kraemerna.com .


Questions should be directed:

Dominic Mascia at 206-620-0630 x 405 or via email at dmascia@kraemerna.com 

Notices

If you are looking for attached files related to a Notice, go back to the Home tab ("Project Files" are on the right side).
Title Created By Created On
Addendum 1 Dominic Mascia 11/5/2021
Addendum 2 and Question & Answer Dominic Mascia 11/12/2021

Estimators

Company Estimator Phone Extension Fax Email
Kraemer North America, LLC Dominic Mascia 720-413-0753 DMascia@KraemerNA.com

If you have project-related questions, please contact your contractor or use the "Submit Question" tab.
If you are having technical difficulties downloading, please email support@pipelinesuite.com or call 949-222-0400.