Shopko Optical Whitewater

Project Files

  • 3-All Other Documents
    • Construction Proposal Template.xlsx Uploaded: 2/23/2022 (23 kb)
    • Graybar CONTRACTOR RFQ Spreadsheet Form Final 1-1-2022 V1.xlsx Uploaded: 2/23/2022 (46 kb)
  • 1-Plans
    • 1-Whitewater_WI_reduced-2_prebid.pdf Uploaded: 2/23/2022 (4802 kb)
    • 2-TBD_Whitewater_WI_Fixture Install_Rev-1_02-22-2022.pdf Uploaded: 2/23/2022 (4271 kb)

Project Info

Project # 22-0058
Project Name Shopko Optical Whitewater
Location Whitewater
Address Map It 1139 West Main Street
City Whitewater
State WI
Zip 53190
Bid Date March 4, 2022
Bid Time 3:00 PM
 
Scope

2,798-SF interior tenant buildout of existing space located at 1139 W. Main Street, Whitewater WI 53190.

Work includes but not limited to demolition and removal of existing mechanical, electrical, plumbing, ceilings, millwork, doors, walls, flooring.

Patching and repair of existing walls salvaged for new tenant layout.

Existing mechanical ducting, RTU/AHU, SA/RA trunks, water heater to remain and be reused if meeting new tenant space requirements and capacities.

Existing electrical panel to remain.

Floor cutting and patching existing concrete floor for new underground systems.

New work includes but not limited to modifcations to existing fire sprinkler system, plumbing fixtures, HVAC duct and grilles, electrical including lighting and low voltage, new framing and blocking, wood trim, doors and door hardware, window tinting, steel studs, drywall, acoustical ceilings, floor coverings, paint and specialty finishes.

Import Note:
» Shopko Optical has national account pricing through Graybar
» Special finishes are provided by Inpro Corporation.  No substitutions!

There will be a pre-construction onsite meeting Friday, February 25, 2022 at 1:00 PM.

Contingent on plan approval and issuance of permits, the owner's tentative construction start date is Monday, March 28, 2022 or sooner.

Expected construction completion date is Friday, May 20, 2022 or sooner.

Plans Plans and spec's can be reviewed in the Online Plan Room (O.P.R.). 

Other Info

The Project Manager of this project will be Michael Vesperman.

All plan and spec related questions should be directed to him.

Michael's Telephone: (608) 845-2290 x216

Michael's Email: michaelv@kswconstruction.com 

Zach Slaby is the contract administrator for this project.

All Subcontract Bids and Proposals can be directed to his email.

Zach's Email: ZachS@KSWConstruction.com 

Notices

If you are looking for attached files related to a Notice, go back to the Home tab ("Project Files" are on the right side).
Title Created By Created On
Bid Reminder Bid Reminder Alert 2/23/2022

Estimators

Company Estimator Phone Extension Fax Email
KSW Construction Corporation Michael Vesperman 608-845-2290 MichaelV@kswconstruction.com

Contacts
Type Company Estimator Phone Extension Fax Email
Contract Administrator KSW Construction Corporation Zach Slaby 608-845-2290 202 zachs@kswconstruction.com
Project Manager KSW Construction Corporation Michael Vesperman 608-845-2290 216 michaelv@kswconstruction.com

If you have project-related questions, please contact your contractor or use the "Submit Question" tab.
If you are having technical difficulties downloading, please email support@pipelinesuite.com or call 949-222-0400.