Project # |
|
Project Name
|
PLANET FITNESS-CARLSBAD, NM
|
Location
|
2515 W. PIERCE STREET, CARLSBAD, NM 88220
|
Address
|
Map It
2515 W. PIERCE ST.
|
City
|
CARLSBAD
|
State
|
NM
|
Zip
|
88220
|
Bid Date
|
April 14, 2022
|
Bid Time
|
12:00 PM
|
|
|
Scope |
FLYNN CONSTRUTION WOULD LIKE TO INVITE YOUR FIRM TO BID ON THE PLANET FITNESS IN CARLSBAD, NM. THIS PROJECT IS THE GROUND UP BUILD OF A SHELL BUILDING FOR A NEW PLANET FITNESS LOCATION. THIS LOCATION IS OFF OF US HWY 28R BY NEW MEXICO UNIVERSITY-CARLSBAD, AN THE BUILDING WILL BE APPROXIMATELY 15,026 SF. THIS PROJECT INCLUDES SITE WORK/ UTILITIES, RE-PAVING, FOUNDATION, CONCRETE SLAB/ SIDEWALKS, STRUCTURAL STEEL, ROOFING, FACADE FINISHES, GLASS/GLAZING, PERIMETER FRAMING, DRYWALL / INDUATION, PLUMBING, ELECTRIC, SPRINKLER, ETC...
*****FLYNN CONSTRUCTION IS THE PREFERRED CONTRACTOR FOR PLANET FITNESS AND HAS COMPLETED 300+ LOCATIONS.*****
SEND ALL QUESTIONS TO LUCAS BUKOVINA BY THURSDAY, APRIL 14, 2022.
TRADES NEEDED:
EXCAVATION (FOOTERS, SITE UTILTIES COMPLETE SYSTEM (WATER, GAS, SANITARY, STORM, ELECTRICAL, CLEANOUTS, ROUGH/FINAL GRADING, ETC....) PAVEMENT (HEAVY/ LIGHT DUTY ASPHALT, FINAL GRADING FOR PARKING LOT, ETC....) PARKING LOT STRIPING (FURNISH & INSTALL) LANDSCAPING (TREES, SHRUBS, GROUND COVERS, IRRIGATION, PIPING, ELECTRICAL SYSTEM, MULCH, STONE, ETC....) MISC. METALS (BICYCLE RACK, STRETCH RAILS, ETC...) STRUCTURAL STEEL (STEEL, COLUMNS, BEAMS, ANCHOR BOLTS, BRACING, DECKING, SUPPORTS, ROOF LADDER, INSTALL TRUSS SYSTEM, ETC....) SIDING/ GUTTER (NICHIHA CEMENT PANELS, ALUMINUM COPING, GUTTER & DOWNSPOUTS, DENSEGLASS SHEATHING, WEATHER BARRIER, ETC...) CASEWORK/ MILLWORK (RECEPTION DES, CABINETS, ETC....) INSULATION (IN WALL BATT INSULATION) EIFS (FURNISH & INSTALL COMPLETE EIFS SYSTEM) ROOFING (METAL ROOF PANELING, PURLINS, INSULATION, FABRIC COVER, ALUMINUM COPING, MECHANICAL EQUIMENT, FLASHING/REPAIR MISC. PENETRATION PATCH/REPAIR ROOF HATCH, ETC....) DOORS & HARDWARE (FURNISH & DELIVER) GLASS/GLAZING (MIRRORS, INTERIOR FRAMELESS SYSTEM, STOREFRONT DOORS, WINDOWS-FRAMING & GLAZING, ETC....) DRYWALL/ ROUGH CARPENTRY/ ACOUSTICAL CEILINGS (METAL STUD FRAMING, DENSGLASS, PLYWOOD SHEATHING, PARTITIONS, SOFFITS/GEARS, ACT, HALF WALLS, BLOCKING/BRACING, DRYWALL, INSTALLS, DOORS/FRAMES, WAINSCOT, BATH ACCESSORIES & PARTITIONS, ETC...) CERAMIC TILE (INSTALL TILE, FURNISH & INSTALL SETTING MATERIALS, GROUT, SHLUTER) FLOORING (INSTALL RUBBER FLOORING & ADHESIVES, FURNISH & INSTALL TRANSITIONS, RUBBER BASE & ADHESIVE, ETC...) GRANITE (RECEPTION DESK, BACK CABINETS, WALL CAPS, LOBBY COUNTER, IPAD COUNTER, ETC...) PAINTING (INTERIOR COMPLETE-EXPOSED CEILINGS, WALLS, CEILING SOFFITS, INSTALL WALLCOVERING, DOORS/FRAMES, ETC...) BATHROOM PARTITIONS (FURNISH & DELIVER) BATHROOM ACCESSORIES (FURNISH & DELIVER) SPRINKLERS (NEW SYSTEM COMPLETE-DRAWINGS, PERMITS, ETC...) PLUMBING (COMPLETE SYSTEM UNDERGROUND, WATER, GAS & VENT PIPING, FURNISH & INSTALL FIXTURES, TRENCH DRAINS, WATER HEATERS, ETC....) HVAC (FURNISH & INSTALL RTU'S & CURBS, DUCTWORK, EXHAUST FANS, WALL/CEILING HEATERS, DIFFUSERS, REGISTERS, GRILLES, THERMOSTATS, WIRING, ACCESORIES, START-UP, ETC....) ELECTRICAL (TEMP POWER, LIGHT POLE BASES, ELECTRICAL/LOW VOLT, UTILTIES, UNDERSLAB RACESWAYS/WIRING/PANELS, GEAR, TRANSFORMERS, GROUNDING, WIRING, INSTALL OWNER PROVIDED LIGHT FIXTURES & RACEWAY, LOW VOLTAGE STUBS & PULL STRINGS, POWER TO EQUIPMENT & SIGNAGE, ETC....) FIRE ALARM (NEW SYSTEM COMPLETE-DRAWINGS, PERMITS, ETC....) LIGHT FIXTURES
|
Plans |
IN ORDER TO OBTAIN IN THE PLANS, PLEASE FOLLOW THESE INSTRUCTIONS:
1. Click on the link in this email that says RESPOND AND VIEW PLANS 2. Enter the Project Key and security Key Codes where promtped (this info can be found at the bottom of this email.) 3. Click on the tab that says PROJECT FILES 4. Here you would download the plans Titled PLANS
|
Other Info |
PROJECT NOTES:
1. TYPICAL PROJECT SCHEDULES 6 MONTHS.
2. THIS PROJECT WILL BE DONE UTILIZING OPEN SHOP TRADES.
3. PROJECT IS SCHEDULED TO START JUNE, 2022
4. ALL TRADES SHOULD INCLUDE PERMIT FEES IN THEIR PROPOSALS AS APPLICABLE.
5. ALL SUBCONTRACTORS WORKING WITH FLYNN CONSTRUCTION ARE REQUIRED TO CARRY WORKMENS COMP INSURANCE.
6. ALL SUBCONTRACTORS SHOULD CARRY APPLICABLE TAXES IN THEIR QUOTES.
7. PLEASE DO NOT CONTACT THE ARCHITECT OR OWNER WITH ANY PROJECT QUESTIONS. ALL QUESTIONS GO TO FLYNN CONSTRUCTION.
8. DROPBOX LINK TO THE DRAWINGS BELOW:: MECHANICAL LINK: https://www.dropbox.com/sh/qgzqh00zfetmu36/AACT-VCnSW4mhwqr9mjGiY6Ma?dl=0
ARCHITECTURAL LINK: https://www.dropbox.com/s/w08txmt63qthm3a/Carlsbad%20NM%20PF%20Architectural%20Permit%20Set%20C2A%2020220119%20%28small%29.pdf?dl=0
9. SCOPE SHEETS FOR TRADES BASED ON DRAWINGS WILL BE COMPLETED BY FLYNN & SENT AT A LATER DATE.
10. VALUE ENGINEERING IDEAS AND ASSOCIATED COST SAVINGS ARE ALWAYS WELCOME. PLEASE THINK ABOUT ANY IDEAS YOU MAY HAVE AND PRESENT THEM WITH YOUR BID.
11. SEND ALL QUESTIONS REGARDING OBTANING BID DOCUMENTS TO: BID DEPARTMENT EMAIL ADDRESS: jchiappialle@flynn-construction.com OR biddept@flynn-construction.com 12. SEND ALL PROJECT QUESTIONS VIA EMAIL TO CONTACT BELOW: LUKE-(EMAIL)LBUKOVINA@FLYNN-CONSTRUCTION.COM (DIRECT DIAL) 412-342-0548 (CELL) 412-525-3171 13 FLYNN IS LOOKING FOR SERIOUS AND QUALIFIED BIDDERS ONLY. WE ONLY ADD A FEW TO OUR BID LIST SO PLEASE LET US KNOW IF YOU ARE NOT ABLE TO QUOTE FOR ANY REASON SO THAT WE CAN SUPPLEMENT YOUR COMPANY WITH ANOTHER.
14. ALL BID PROPOSALS ARE TO BE EMAILED TO: biddept@flynn-construction.com OR FAXED TO 412-243-7925
|
|