Circle Drive Bridges Replacement Project

Project Files

  • Addendum 1
    • Addendum_1 B22-T113AM-1.pdf Uploaded: 7/14/2022 (16 kb)
    • Addendum_1 B22-T113AM.pdf Uploaded: 7/7/2022 (16 kb)
    • Draft RR Insurance Requirements.docx Uploaded: 7/29/2022 (19 kb)
  • Addendum 4
    • Addendum_4.pdf Uploaded: 7/29/2022 (25 kb)
    • Circle Dr Bridges - Schedule A - Bid Tab - Addendum 4.xlsx Uploaded: 7/29/2022 (24 kb)
    • Copy of Circle Dr Bridges - Schedule A - Bid Tab - Addendum 4.pdf Uploaded: 7/29/2022 (258 kb)
  • Addendum 3
    • Addendum_3.pdf Uploaded: 7/27/2022 (30 kb)
    • QA Document 1 2.pdf Uploaded: 7/29/2022 (21 kb)
  • DRAFT PLANS SPECS
    • 01.01 DRAFT-Circle Drive Bridges-RFQ plan set 1.pdf Uploaded: 7/5/2022 (94281 kb)
    • 01.01b DRAFT-Circle Drive Bridges-Hancock Improvement RFQ Plans 1.pdf Uploaded: 7/5/2022 (22177 kb)
    • 01.02 DRAFT-Circle Drive Bridges- Specifications 1.pdf Uploaded: 7/5/2022 (1388 kb)
    • 02.01 DRAFT-Circle Drive Bridges-Bridge Geotech Report 1.pdf Uploaded: 7/5/2022 (4919 kb)
    • 02.02 DRAFT-Circle Drive Bridges-Pavement Report 1.pdf Uploaded: 7/5/2022 (6353 kb)
    • 02.03 DRAFT-Circle Drive Bridges-Walls Report 1.pdf Uploaded: 7/5/2022 (9750 kb)
    • 03.01 DRAFT-Circle Drive Bridges-Asbestos and Lead testing 1.pdf Uploaded: 7/5/2022 (5081 kb)
    • 03.02 DRAFT-Circle Drive Bridges-PFOS results 1.pdf Uploaded: 7/5/2022 (1963 kb)
    • 04.01 DRAFT-Circle Drive Bridges-Drainage Report 1.pdf Uploaded: 7/5/2022 (37938 kb)
    • 04.02 DRAFT-Circle Drive Bridges-Channel Design Report 1.pdf Uploaded: 7/5/2022 (31661 kb)
    • 05.01a DRAFT-Circle Drive Bridges-NWP14 Verification 1.pdf Uploaded: 7/5/2022 (282 kb)
    • 05.01b DRAFT-Circle Drive Bridges-PCN_compiled 1.pdf Uploaded: 7/5/2022 (79860 kb)
    • 05.02 DRAFT-Circle Drive Bridges-Environmental Review Checklist 1.pdf Uploaded: 7/5/2022 (1084 kb)
    • 06 Circle Drive Bridges- I-17-ET EU EV EW AS-BUILTS 1.pdf Uploaded: 7/5/2022 (2649 kb)
    • B22-T113AM - Circle Drive Bridges Replacement Project_ITEMS_EN.xls Uploaded: 7/5/2022 (43 kb)
    • B22-T113AM Circle Drive Bridges Replacement.pdf Uploaded: 7/5/2022 (926 kb)
    • Required Exhibits 2 3 4 _ 5.pdf Uploaded: 7/5/2022 (161 kb)
  • Addendum 2
    • Addendum_2 B22-T113AM.pdf Uploaded: 7/14/2022 (50 kb)
  • Addendum 7
    • Addendum_7.pdf Uploaded: 8/23/2022 (25 kb)
    • FINAL Addendum 7 Schedule A - Bid Tab - Rev 3.xlsx Uploaded: 8/23/2022 (25 kb)
  • Addendum 6
    • Addendum 6 Final Q and A.pdf Uploaded: 8/19/2022 (37 kb)
    • Addendum_6.pdf Uploaded: 8/19/2022 (24 kb)
  • Addendum 5
    • Addendum_5.pdf Uploaded: 8/19/2022 (117 kb)
  • 18.pdf Uploaded: 7/29/2022 (1705 kb)
  • Circle Drive Addendum 7.pdf Uploaded: 8/23/2022 (165 kb)
  • Draft RR Insurance Requirements.pdf Uploaded: 7/29/2022 (177 kb)

Project Info

Project # B22-T113AM
Project Name Circle Drive Bridges Replacement Project
Location Colorado Springs
Address
City
State
Zip
Bid Date August 26, 2022
Bid Time 5:00 PM
 
Scope

SCOPE:

Kraemer North America, LLC is soliciting proposals from all interested suppliers and contractors for work associated with the Circle Drive Bridges Replacement Project currently advertised by the City of Colorado Springs.  The project includes the following scopes of work:

Subcontracting / Hired Services Opportunities:

Trucking

Waterline/Underground

Vac Truck

Soil Nail/Shotcrete

Concrete Flatwork/Paving

Signing

Landscaping/Erosion Control

Survey

Electrical   

Health/Safety

MSE Walls

Waterproofing

Asphalt Paving

Environmental

Caisson Drilling

Fencing

Traffic Control 

Sweeping

Structural Concrete Coating

Pavement Marking

Reinforcing Steel

Construction Engineering

Guardrail/Bridge Rail

Crane Rental

 Bridge Demolition

 

 

Supply Opportunities:

   

Aggregates

Concrete Ready Mix

Steel Piling

Precast Girders and Panels

Precast Wall Panels

Signing

Erosion/Geotextiles

Reinforcing Steel

Misc. Materials

Expansion Device

Railing

RCP/Precast Inlets/MH’s

Bearings / Pads


 

 

Plans

To respond to this request and see the available opportunity:

A) If you have received this notice as an email, simply click on "View Online Planroom Portal".  Once you are in the Online Planroom, please respond “Yes,” “No” or “Unsure” by clicking on the appropriate box.  

B) If you have received this notice via fax, please refer to the note at bottom of the page and using the internet, follow the instructions to access the KRAEMERNA PIPELINESUITE site and enter the Project ID and Security Key to access the information. Then follow the instructions as noted above in A).

Other Info

Quotes are due by Friday, August 26th at 5:00 PM

Quotes may either be faxed to our office at 303-688-8811 or emailed to estimating at 
bidsco@kraemerna.com.

Questions are due by August 13 at 2:00PM MT and should either be directed to Jud Barlow at 303-688-7500 or via RFI through the online planroom. 

SCHEDULE:

Work is anticipated to start after NTP this fall.  This is a Calendar Day project.  The owner has set the maximum number of Calendar Days at 750 Days.  Nightwork and frequent schedule coordination is anticipated.

UPDATE CONTACT INFO:


To update your company’s contact information, please use the link below to access your profile page.  Login using the PROJECT ID and SECURITY KEY provide.  Select the “Update My Info” tab on the webpage. 

 

If you have multiple contacts that you’d like to add to future solicitations, please respond directly to this solicitation email to notify the estimate of the additional contacts.

Notices

If you are looking for attached files related to a Notice, go back to the Home tab ("Project Files" are on the right side).
Title Created By Created On
Addendum #1 Circle Drive Bid Date Change Jud Barlow 7/14/2022
Addendum #2 Circle Drive Question Period Extension Jud Barlow 7/14/2022
Addendum #3 - Circle Drive Bid Date Revision Jud Barlow 7/27/2022
Addendum #4 - Circle Drive Q&A and Updates Jud Barlow 7/29/2022
Addendum #5 Jud Barlow 8/19/2022
Addendum #6 Jud Barlow 8/19/2022
Addendum #7 Jud Barlow 8/23/2022

Estimators

Company Estimator Phone Extension Fax Email
Kraemer North America, LLC Eric Baumgardt 303-688-7500 303-688-8811 ebaumgardt@kraemerna.com
Kraemer North America Jud Barlow 303-688-7500 jbarlow@kraemerna.com

If you have project-related questions, please contact your contractor or use the "Submit Question" tab.
If you are having technical difficulties downloading, please email support@pipelinesuite.com or call 949-222-0400.