St Clair County MetroLink Extension Shiloh-Scott to Mid America Airport

Project Files

  • Addendum 4 01-03-23
    • F-DT Addendum No 4_20230103.pdf Uploaded: 1/4/2023 (1523 kb)
  • Plans
    • F-DT Drawings Vol. 1.pdf Uploaded: 11/17/2022 (87168 kb)
  • Addendum 2 12-14-22
    • F-DT Addendum No 2_20221214.pdf Uploaded: 12/16/2022 (2525 kb)
  • Addendum 1 12-7-22
    • F-DT Addendum No 1_20221207.pdf Uploaded: 12/16/2022 (657 kb)
  • Geotechnical Report Vol 3
    • F-DT Manual Vol. 3 - Geotechnical.pdf Uploaded: 11/17/2022 (16877 kb)
  • Addendum 3 12-23-22
    • Technical-Addendum 3
      • 001-002_MAA LRT DT SpecTOC-ADD3.pdf Uploaded: 12/29/2022 (538 kb)
      • 003-005A_MAA LRT DT SpecSeals-ADD3.pdf Uploaded: 12/29/2022 (2646 kb)
      • 023A-023B_JSP-7_AccessGateAssembly-ADD3.pdf Uploaded: 12/29/2022 (1154 kb)
      • 023C_023G-JSP-8_WaterMainRelocation-ADD 3.pdf Uploaded: 12/29/2022 (226 kb)
      • 34 21 08 Earthwork-ADD3.pdf Uploaded: 12/29/2022 (713 kb)
      • 34 21 10 Crushed Stone-ADD3.pdf Uploaded: 12/29/2022 (672 kb)
      • 34 23 12 CIP Conc OCS Pole Downguy Foundation-ADD3.pdf Uploaded: 12/29/2022 (598 kb)
      • 34 23 31 Traction Power Grounding and Bonding-ADD3.pdf Uploaded: 12/29/2022 (566 kb)
    • Drawings Plans Addendum 3
      • 002-004_Index of Drawings-ADD3.pdf Uploaded: 12/29/2022 (5888 kb)
      • 008_Horiz Vert Control-ADD3.pdf Uploaded: 12/29/2022 (812 kb)
      • 013_Alignment Curve Data-ADD3.pdf Uploaded: 12/29/2022 (1175 kb)
      • 021_Typical Sections-ADD3.pdf Uploaded: 12/29/2022 (1115 kb)
      • 026_Embankment Plan-ADD3.pdf Uploaded: 12/29/2022 (1612 kb)
      • 049_Bike Trail Grading Plan-ADD3.pdf Uploaded: 12/29/2022 (1231 kb)
      • 050A_Bike Trail Connection Plan-ADD3.pdf Uploaded: 12/29/2022 (923 kb)
      • 050_Old IL Route 158 Plan Profile-ADD3.pdf Uploaded: 12/29/2022 (766 kb)
      • 051_Old IL Route 158 Grading-ADD3.pdf Uploaded: 12/29/2022 (757 kb)
      • 054-055_MOT Seibert Road-ADD3.pdf Uploaded: 12/29/2022 (565 kb)
      • 056_Track Erosion Control-ADD3.pdf Uploaded: 12/29/2022 (1148 kb)
      • 067_Old IL Route 158 Erosion Control-ADD3.pdf Uploaded: 12/29/2022 (316 kb)
      • 068-069_Utility Conflicts-ADD3.pdf Uploaded: 12/29/2022 (1299 kb)
      • 074A-074F_Utility Relocation Plans-ADD3.pdf Uploaded: 12/29/2022 (2688 kb)
      • 075-076_Old IL 158 Signing-ADD3.pdf Uploaded: 12/29/2022 (1398 kb)
      • 101_Bike Trail Bridge GPE-ADD3.pdf Uploaded: 12/29/2022 (1036 kb)
      • 157-158_Signal System Conduit-ADD3.pdf Uploaded: 12/29/2022 (2843 kb)
      • 160-161_TP Scott Interlock-ADD3.pdf Uploaded: 12/29/2022 (1383 kb)
      • 164_TP Substation Grading-ADD3.pdf Uploaded: 12/29/2022 (1064 kb)
      • 167-168_TP Short Driveway-ADD3.pdf Uploaded: 12/29/2022 (1384 kb)
      • 177_OCS Pole Foundation Schedule-ADD3.pdf Uploaded: 12/29/2022 (739 kb)
      • 179-267_Cross Sections Track 1-ADD3.pdf Uploaded: 12/29/2022 (9617 kb)
      • 268-272_Bike Trail Grading Cross Sections-ADD3.pdf Uploaded: 12/29/2022 (701 kb)
      • 273-281_Old IL158 Cross Sections-ADD3.pdf Uploaded: 12/29/2022 (666 kb)
    • General - Addendum 3
      • Section 01 33 26.13 Sfty Cert And Int Test_20221220.pdf Uploaded: 12/29/2022 (485 kb)
  • Specs Vol 1 & 2
    • F-DT Manual Vol. 1 - Bidding Requirements, General Conditions with Bid Forms.pdf Uploaded: 11/17/2022 (5050 kb)
    • F-DT Manual Vol. 2 - Technical Specs.pdf Uploaded: 11/17/2022 (2512 kb)
  • Addendum 5 01-06-23
    • F-DT Addendum No 5_20230106.pdf Uploaded: 1/7/2023 (2419 kb)
  • Addendum 6 01-13-23
    • F-DT Addendum No 6_20230113.pdf Uploaded: 1/13/2023 (127 kb)

Project Info

Project # SCC MAA ML EXT-01
Project Name St Clair County MetroLink Extension Shiloh-Scott to Mid America Airport
Location Shiloh-Scott AFB, IL Mid-America Airport Mascoutah, IL
Address
City
State
Zip
Bid Date January 16, 2023
Bid Time 2:00 PM
 
Scope
Millstone Weber, LLC invites you to review and submit a bid for work items related to the St. Clair County MetroLink Extension 
Shiloh/SAFB to MidAmerica St. Louis Airport Facilities – Double Track project.

The project is located adjacent to Scott Air Force Base and MidAmerica St.Louis Airport in St. Clair County, Illinois.  

The Facilities Double Track project consists of all construction associated with preparation of the mainline track bed, up to and including the subballast, and preparation of the bike trail.

The project work is comprised of the following:  
clearing, grubbing, and legal disposal of vegetation, brush, and trees within the project footprint; earthwork (excavation and embankment); rough and finish grading of the subgrade; subgrade preparation; subgrade stabilization; 
embankments for signal houses’ site and access preparation for traction power substations; seeding and erosion control measures; subballast; drainage structures; rip-rap; LRV bridge over Seibert Road; widened embankment for 
turn-back tracks; stray current mitigation; catenary pole foundations; wayside signal foundations; permanent fencing; pavement removal and cul-de-sac at Old IL Route 158; roadway signage; temporary traffic control; cables, conduits, 
and duct banks; utility relocations; earthwork (excavation and embankment) for Bike Trail; and Bike Trail bridge over Seibert Road. 
Plans
Other Info
REVISED Subcontractor Proposals Due to MIllstone Weber, LLC NLT Monday January 16, 2023 at 2:00 pm


Addendum 1, 2, 3, 4, 5, and 6 are available in the planroom


A Pre-Bid meeting will be held at 10:00 A.M. on December 8, 2022 at the SCCTD Belleville 
Transit Center, 718 Scheel Street, Belleville, IL  62220, for the purpose of responding to 
questions and clarifying the contents of this IFB.  

RFI's will be due to Millstone Weber, LLC NLT Tuesday January 3rd, 2023 at 3:00 pm


St. Clair County Transit District has established a project goal of 25% of the awarded contract sum for DBE participation
PREVAILING WAGES:  No less than the prevailing rate of wages, as determined in 
accordance with the Illinois Prevailing Wage Act

PROJECT LABOR AGREEMENT (PLA): This project is covered by the terms of a Project 
Labor Agreement

Notices

If you are looking for attached files related to a Notice, go back to the Home tab ("Project Files" are on the right side).
Title Created By Created On
Bid Reminder Bid Reminder Alert 12/6/2022
MetroLink Facilities Double Track: Addendum No 1 and Addendum No 2 Mike Nowak 12/16/2022
Addendum 3 SCCTD Metrolink Facilities Double Track (Plans, Specifications, Technical) Mike Nowak 12/29/2022
Addendum 4 Mike Rowlen 1/4/2023
Addendum 5 Mike Rowlen 1/7/2023
MetroLink Facilities Double Track: Addendum No 6 Mike Nowak 1/13/2023

Estimators

Company Estimator Phone Extension Fax Email
Millstone Weber, LLC John Clark 636-688-8797 636-949-3129 john.clark@millstoneweber.com
Millstone Weber, LLC Mike Rowlen 636-688-8796 636-949-3129 mike.rowlen@millstoneweber.com
Millstone Weber, LLC Ryan Taylor 636-688-8793 636-949-3129 ryan.taylor@millstoneweber.com

If you have project-related questions, please contact your contractor or use the "Submit Question" tab.
If you are having technical difficulties downloading, please email support@pipelinesuite.com or call 949-222-0400.