St Clair County MetroLink Extension Shiloh-Scott to Mid America Airport

Project Files

  • Vol 3 Geotechnical Report
    • F-ST Manual Vol. 3 - Geotechnical.pdf Uploaded: 1/4/2023 (16912 kb)
  • Addendum 3 02-01-23
    • Drawings
      • 020_Cult Res Fence Plan Sh 1_ADD3.pdf Uploaded: 2/2/2023 (709 kb)
      • 021_Cult Res Fence Plan Sh 2_ADD3.pdf Uploaded: 2/2/2023 (717 kb)
      • 111_Rieder Road Br Gen Data_ADD3.pdf Uploaded: 2/2/2023 (957 kb)
      • 127_Rieder Road Br S Abut_ADD3.pdf Uploaded: 2/2/2023 (834 kb)
      • 128_Rieder Road Br N Abut_ADD3.pdf Uploaded: 2/2/2023 (832 kb)
      • 186_Rieder Road Wall GPE_ADD3.pdf Uploaded: 2/2/2023 (712 kb)
      • 187_Rieder Road Wall Gen Data_ADD3.pdf Uploaded: 2/2/2023 (640 kb)
      • 188_Rieder Road Wall Typical_ADD3.pdf Uploaded: 2/2/2023 (632 kb)
      • 316_Station Signage Plan_ADD3.pdf Uploaded: 2/2/2023 (1007 kb)
    • Geotechnical Report
      • Bridge SGR Rieder Road over Metro_ADD3.pdf Uploaded: 2/2/2023 (6391 kb)
    • Specifications-General
      • FST Special Provisions_ADD3.pdf Uploaded: 2/2/2023 (123 kb)
      • Status of Utilities_ADD3.pdf Uploaded: 2/2/2023 (148 kb)
    • F-ST Addendum No 3_20230201.pdf Uploaded: 2/2/2023 (1467 kb)
  • Vol 2 Technical Specifications
    • F-ST Manual Vol. 2 Technical Specs.pdf Uploaded: 1/4/2023 (8891 kb)
  • Vol 1 General Specifications with Bid Forms
    • F-ST Manual Vol. 1 General with Bid Forms.pdf Uploaded: 1/4/2023 (3208 kb)
  • Vol 1 Drawings
    • F-ST Drawings Vol. 1.pdf Uploaded: 1/4/2023 (154995 kb)
  • Addendum 2 01-28-23
    • Specifications-Technical
      • 01573 Survey Monuments_ADD2.pdf Uploaded: 1/30/2023 (19 kb)
      • 26 01 01 Electrical General Reqs_ADD2.pdf Uploaded: 1/30/2023 (128 kb)
      • 26 05 43 UG Ducts Raceways Elec Sys_ADD2.pdf Uploaded: 1/30/2023 (106 kb)
      • 26 05 48 Vib Seis Cont Elec Sys_ADD2.pdf Uploaded: 1/30/2023 (113 kb)
      • 26 32 13.13 Diesel-Engine-Driven Gen Sets_ADD2.pdf Uploaded: 1/30/2023 (168 kb)
      • 32 31 13.53 - High Sec Ch Link Fence Gate_ADD2.pdf Uploaded: 1/30/2023 (114 kb)
      • 34 08 23.23 Testing Startup for Comm_ADD2.pdf Uploaded: 1/30/2023 (26 kb)
      • 504 Form Liner Sim Lime Surf and Mockup_ADD2.pdf Uploaded: 1/30/2023 (230 kb)
      • F-ST Manual Vol. 2 Technical Specs-Seals_ADD2.pdf Uploaded: 1/30/2023 (758 kb)
      • F-ST Manual Vol. 2 Technical Specs-TOC_ADD2.pdf Uploaded: 1/30/2023 (155 kb)
    • Specifications-General
      • Section 00 43 04 Subcontractor List_ADD 2.pdf Uploaded: 1/30/2023 (211 kb)
      • Section 00 45 05 Debarment Suspension_ADD 2.pdf Uploaded: 1/30/2023 (105 kb)
      • Section 00 54 23 Post Bid Submittals_ADD 2.pdf Uploaded: 1/30/2023 (78 kb)
      • Section 00 80 01 Project Labor Agreement_ADD 2.pdf Uploaded: 1/30/2023 (177 kb)
      • Section 01 78 39 Project Record Documents_ADD 2.pdf Uploaded: 1/30/2023 (77 kb)
    • Drawings
      • 241_Sig Sys Manhole Pullbox Sched_ADD2.pdf Uploaded: 1/30/2023 (511 kb)
      • 271_BLV Station Site Plan_ADD2.pdf Uploaded: 1/30/2023 (430 kb)
      • 272-273_BLV Station Plaza Plan_ADD2.pdf Uploaded: 1/30/2023 (510 kb)
      • 275_BLV Sta Pl Drive Typ Sec Bollard_ADD2.pdf Uploaded: 1/30/2023 (322 kb)
      • 298_Arch Site Plan_ADD2.pdf Uploaded: 1/30/2023 (814 kb)
      • 299_Life Safety Plan_ADD2.pdf Uploaded: 1/30/2023 (496 kb)
      • 315_Plaza Details_ADD2.pdf Uploaded: 1/30/2023 (298 kb)
    • F-ST Addendum No 2_20230127.pdf Uploaded: 1/30/2023 (138 kb)
  • Addendum 5
    • Technical Specifications
      • JSP-5_Borrow Pit Lake Embank Const-ADD5.pdf Uploaded: 2/15/2023 (36 kb)
    • General Specifications
      • 00 01 10 Table of Contents_ADD5.pdf Uploaded: 2/15/2023 (81 kb)
      • 00 31 46 Permits_ADD5.pdf Uploaded: 2/15/2023 (1429 kb)
      • 01 33 26.13 Sfty Cert And Int Test_ADD5.pdf Uploaded: 2/15/2023 (1572 kb)
      • FST Special Provisions_ADD5.pdf Uploaded: 2/15/2023 (132 kb)
    • Drawings
      • 004_Index Drawings Sht 3 of 5_ADD5.pdf Uploaded: 2/15/2023 (2940 kb)
      • 035-036_Rieder Rd Typ Sects_ADD5.pdf Uploaded: 2/15/2023 (982 kb)
      • 061-062_Rieder Rd Plan Prof_ADD5.pdf Uploaded: 2/15/2023 (764 kb)
      • 083-084_Rieder Rd Eros Cont_ADD5.pdf Uploaded: 2/15/2023 (892 kb)
      • 097-101_Rieder Rd Sign Mark Plan_ADD5.pdf Uploaded: 2/15/2023 (1329 kb)
      • 102_Rieder Rd Sign Detail_ADD5.pdf Uploaded: 2/15/2023 (298 kb)
      • 103-104_Rieder Rd Widen Median Detail_ADD5.pdf Uploaded: 2/15/2023 (1074 kb)
      • 105_Rieder Rd Intersect Detail_ADD5.pdf Uploaded: 2/15/2023 (580 kb)
      • 212_Culvert 42.72_ADD5.pdf Uploaded: 2/15/2023 (437 kb)
      • 272-273_BLV Sta Plaza Plan_ADD5.pdf Uploaded: 2/15/2023 (599 kb)
      • 274_BLV Sta Pl Grading Signing Bollard_ADD5.pdf Uploaded: 2/15/2023 (404 kb)
      • 275A_Sta Plaza Conc Curb Wall_ADD5.pdf Uploaded: 2/15/2023 (424 kb)
      • 275_BLV Sta Drive Typ Bollard Details_ADD5.pdf Uploaded: 2/15/2023 (1305 kb)
      • 306_Three Col Canopy Framing Plan_ADD5.pdf Uploaded: 2/15/2023 (257 kb)
      • 307_Ped Ramp Plan Elevation_ADD5.pdf Uploaded: 2/15/2023 (264 kb)
      • 474-485_Rieder Rd Cross Sects_ADD5.pdf Uploaded: 2/15/2023 (3221 kb)
    • F-ST Addendum No 5_20230214.pdf Uploaded: 2/15/2023 (140 kb)
  • Addendum 1 01-18-23
    • Plan Drawings
      • 238_BRIDGE CONDUIT DETAILS_ADD1.pdf Uploaded: 1/19/2023 (951 kb)
      • 239_ROUTE SEL CON DETAILS_ADD1.pdf Uploaded: 1/19/2023 (888 kb)
      • 240_SIG SYS CON DETAILS_ADD1.pdf Uploaded: 1/19/2023 (2647 kb)
      • 242_RR INTERLOCK DRIVE TYP_ADD1.pdf Uploaded: 1/19/2023 (865 kb)
      • 243_RR INTERLOCK DRIVE PP_ADD1.pdf Uploaded: 1/19/2023 (933 kb)
      • 244_DRIVE TYP DETAILS_ADD1.pdf Uploaded: 1/19/2023 (1330 kb)
      • 469-485_RR CROSS SECTIONS_ADD1.pdf Uploaded: 1/19/2023 (2651 kb)
    • Specifications
      • Technical
        • 32 11 26 Subballast_ADD1.pdf Uploaded: 1/19/2023 (216 kb)
        • 34 21 08 Earthwork_ADD1.pdf Uploaded: 1/19/2023 (178 kb)
        • 34 21 10 Crushed Stone_ADD1.pdf Uploaded: 1/19/2023 (144 kb)
        • MAA LRT ST SpecSeals-ADD1.pdf Uploaded: 1/19/2023 (136 kb)
        • MAA LRT ST SpecTOC-ADD1.pdf Uploaded: 1/19/2023 (168 kb)
    • F-ST Addendum No 1_20230118.pdf Uploaded: 1/19/2023 (134 kb)
  • Addendum 4 02-08-23
    • Specifications
      • General
        • Section 00 11 13 Advertisement for Bids_ADD4.pdf Uploaded: 2/9/2023 (91 kb)
        • Section 00 21 13 InstructionsTo Bidders_ADD4.pdf Uploaded: 2/9/2023 (136 kb)
        • Section 00 41 00 Bid Form_ADD4.pdf Uploaded: 2/9/2023 (117 kb)
        • Section 00 43 00 Bid Price Breakdown_ADD4.pdf Uploaded: 2/9/2023 (174 kb)
        • Section 00 52 13 Solicit Accept Award_ADD4.pdf Uploaded: 2/9/2023 (264 kb)
    • F-ST Addendum No 4_20230208.pdf Uploaded: 2/9/2023 (136 kb)

Project Info

Project # SCCTD - SCC MAA ML EXT - 02
Project Name St Clair County MetroLink Extension Shiloh-Scott to Mid America Airport
Location Shiloh-Scott AFB, IL Mid-America Airport Mascoutah, IL
Address
City
State
Zip
Bid Date February 20, 2023
Bid Time 2:00 PM
Site Meeting Date January 26, 2023
Site Meeting Time 10:00 AM
 
Scope Millstone Weber, LLC invites you to provide a proposal for the SCCTD MetroLink Extension Shiloh Scott AFB, IL to MidAmerica Airport Extension Facilities-Single Track project. 

Work on this project includes clearing, grubbing, and legal disposal of vegetation, brush, and trees within the combined footprints of MetroLink, Bike Trail, Access Roadway, and Rieder Road extension; earthwork 
(excavation and embankment) for MetroLink, Bike Trail, Access Roadway, and Rieder Road extension; rough and finish grading of the subgrade for MetroLink, Access Roadway, and Rieder Road extension (rough grading only of the subgrade for Bike Trail); subgrade preparation for MetroLink, Access Roadway, and Rieder Road extension; subgrade stabilization for MetroLink, Access Roadway, and Rieder Road extension; embankments for signal houses; site and access preparation for traction power substations; seeding and erosion control measures; subballast; drainage structures; rip-rap; LRV bridge over Little Silver Creek; LRV bridge over Silver Creek; stray current mitigation; catenary pole foundations; wayside signal foundations; fencing; temporary traffic control; cables, conduits, and ductbanks; utility adjustments/relocations; MAA passenger station platform and ramp, precast warning strips, handrails, fiberglass grating, guardrail, canopy column foundations and columns, canopy, 
station finishes (benches, trash receptacles, windscreens, bike racks, identification signage, windscreen signage, miscellaneous signage, information kiosk), bollards, platform lighting, plaza lighting, plaza paving, octagon paving, 
landscaping, communications building and ramp, cables and conduits for fare collection, cables and conduits for station finishes, passenger drop-off loop; vehicular bridge (over MetroLink mainline) at Rieder Road with retaining walls; Rieder Road extension pavement; and the demolition of Wherry Road pavement and regrading; and any additional work necessary to complete the project. 
Plans
Other Info Pre-Bid Meeting to be held Thursday January 26, 2023 at 10:00 am

Subcontractor RFI's due to Millstone Weber, LLC NLT 4:00 pm on Monday February 6th, 2023.  Millstone Weber, LLC will submit RFI's to SSCTD on February 7th, 2023.

Subcontractor Bids Due to Millstone Weber, LLC on Monday February 13th, 2023 at 2:00 p.m.

IDOT Prequalification is required for all contractors completing work within IDOT right-of-way.
 Contractors completing work within IDOT right-of-way shall be prequalified by the 
Illinois Department of Transportation for the specific type of work to be performed.  
Additional information is provided in Section 00 21 13 Instructions To Bidders.  
 
It is the policy of the St. Clair County Transit District that Disadvantaged Business 
Enterprises (DBE) shall have an equal opportunity to participate in the performance of 
contracts. St. Clair County Transit District has established a project goal of 25% of the 
awarded contract sum for DBE participation. 

Project is covered by the Terms of a Project Labor Agreement.  
 

Notices

If you are looking for attached files related to a Notice, go back to the Home tab ("Project Files" are on the right side).
Title Created By Created On
St Clair County MetroLink Extension Shiloh-Scott to Mid America Airport-Facilites Single Track Mike Nowak 1/19/2023
MetroLink Facilities Single Track: Addendum No 2 Mike Nowak 1/30/2023
MetroLink Facilities Single Track: Addendum No 3 Mike Nowak 2/2/2023
MetroLink Facilities Single Track: Addendum No 4 (Includes Change in Bid Date) Mike Nowak 2/9/2023
MetroLink Facilities Single Track: Addendum No 5 Mike Nowak 2/15/2023

Estimators

Company Estimator Phone Extension Fax Email
Millstone Weber, LLC John Clark 636-688-8797 636-949-3129 john.clark@millstoneweber.com
Millstone Weber, LLC Mike Rowlen 636-688-8796 636-949-3129 mike.rowlen@millstoneweber.com
Millstone Weber, LLC Ryan Taylor 636-688-8793 636-949-3129 ryan.taylor@millstoneweber.com

If you have project-related questions, please contact your contractor or use the "Submit Question" tab.
If you are having technical difficulties downloading, please email support@pipelinesuite.com or call 949-222-0400.