DESIGN-BUID (DB), P-1127U COMPOSITE SHOP - PREFINAL DWGS

Project Files

  • 03 AMENDMENTS
    • 02
      • 23R2541 Amendment 0002.pdf Uploaded: 8/13/2023 (346 kb)
      • 23R2541 P1127 Site Visit Log.pdf Uploaded: 8/13/2023 (876 kb)
    • 01
      • 23R2541 Amendment 0001.pdf Uploaded: 8/13/2023 (34 kb)
  • 01 RFP
    • ATTACHMENT C - PPI Inquiry Log.xls Uploaded: 8/13/2023 (33 kb)
    • ATTACHMENT D - SECNAV 5512.pdf Uploaded: 8/13/2023 (2283 kb)
    • ATTACHMENT F - Price Proposal Form.pdf Uploaded: 8/13/2023 (104 kb)
    • ATTACHMENT G - PIEE Vendor Access Instructions.pdf Uploaded: 8/13/2023 (510 kb)
    • Attachment A - WO 170235.pdf Uploaded: 8/13/2023 (4038 kb)
    • N4008523R2541 RFP.pdf Uploaded: 8/13/2023 (423 kb)
  • 02 PLAN SPEC
    • Concept DWG
      • ATTACHMENT 01 A AIMD_Consolidation - 1 of 5.pdf Uploaded: 8/13/2023 (39832 kb)
      • ATTACHMENT 01 B AIMD_Consolidation - 2 of 5.pdf Uploaded: 8/13/2023 (39947 kb)
      • ATTACHMENT 01 C AIMD_Consolidation - 3 of 5.pdf Uploaded: 8/13/2023 (48608 kb)
      • ATTACHMENT 01 D AIMD_Consolidation - 4 of 5.pdf Uploaded: 8/13/2023 (45541 kb)
      • ATTACHMENT 01 E AIMD_Consolidation - 5 of 5.pdf Uploaded: 8/13/2023 (55445 kb)
      • ATTACHMENT 02_Aircraft Wash Area.pdf Uploaded: 8/13/2023 (6309 kb)
      • ATTACHMENT 03_DOWNTRON - DWG - DFW 5-4-5-H.pdf Uploaded: 8/13/2023 (192 kb)
      • ATTACHMENT 04_DOWNTRON - BROCHURE.pdf Uploaded: 8/13/2023 (2388 kb)
      • ATTACHMENT 05_Composite Shop Concept - DWG1.pdf Uploaded: 8/13/2023 (32 kb)
      • ATTACHMENT 06_Composite Shop Concept - DWG2.pdf Uploaded: 8/13/2023 (28 kb)
      • ATTACHMENT 06_Composite Shop Concept - RRMM Notes.pdf Uploaded: 8/13/2023 (75 kb)
      • ATTACHMENT 07_Composite Shop - Site Location Map.pdf Uploaded: 8/13/2023 (298 kb)
      • ATTACHMENT 08_Composite Shop - Existing Conditions.pdf Uploaded: 8/13/2023 (284 kb)
      • ATTACHMENT 09_Composite Shop - Concept Site Plan.pdf Uploaded: 8/13/2023 (207 kb)
      • ATTACHMENT 10_Composite Shop - Concept Grading and Drainage Plan.pdf Uploaded: 8/13/2023 (298 kb)
      • ATTACHMENT 11_CLAYTON - SPECS.pdf Uploaded: 8/13/2023 (110 kb)
      • ATTACHMENT 12_Drainage Corrections for Aircraft Wash Slab_1964.pdf Uploaded: 8/13/2023 (5071 kb)
      • ATTACHMENT 13_FINAL GEOTECHNICAL REPORT - MILCON P280.PDF.pdf Uploaded: 8/13/2023 (1964 kb)
      • ATTACHMENT 14_HR-SOP.pdf Uploaded: 8/13/2023 (2949 kb)
      • ATTACHMENT 15_Hydrant_Flow_NSN_SP-302_Nov_2021.pdf Uploaded: 8/13/2023 (144 kb)
      • ATTACHMENT 16_NAVFAC_LID_Data_Card_v3.0.pdf Uploaded: 8/13/2023 (164 kb)
      • ATTACHMENT 17_PAPCE-SPECS.pdf Uploaded: 8/13/2023 (781 kb)
      • ATTACHMENT 18_Procurement_Sheet_1.xls Uploaded: 8/13/2023 (42 kb)
      • ATTACHMENT 19_Procurement_Sheet_2.xls Uploaded: 8/13/2023 (51 kb)
      • ATTACHMENT 20_PROD_Form.doc Uploaded: 8/13/2023 (366 kb)
      • ATTACHMENT 21_TIGERVAC -SPECS.pdf Uploaded: 8/13/2023 (658 kb)
      • ATTACHMENT 22_TREE Preservation Instruction.pdf Uploaded: 8/13/2023 (794 kb)
      • ATTACHMENT 23_UCP Packet.pdf Uploaded: 8/13/2023 (262 kb)
      • Composite Maintenance_Combined Narrative ECC.pdf Uploaded: 8/16/2023 (250 kb)
    • 100 PREFINAL
      • NS Norfolk P-1127U Composite Shop - Drawings - Revised 100 Prefinal - 2024.06.28-1.pdf Uploaded: 7/12/2024 (29217 kb)
      • NS Norfolk P-1127U Composite Shop - Project Manual - Vol 1 - Revised 100 Prefinal - 2024.06.28-1.pdf Uploaded: 7/12/2024 (5985 kb)
      • NS Norfolk P-1127U Composite Shop - Project Manual - Vol 2 - Revised 100 Prefinal - 2024.06.28-1.pdf Uploaded: 7/12/2024 (6214 kb)

Project Info

Project # 1046-23
Project Name DESIGN-BUID (DB), P-1127U COMPOSITE SHOP - PREFINAL DWGS
Location Naval Station Norfolk, Norfolk Virginia
Address
City Norfolk
State VA
Zip
Bid Date July 25, 2024
Bid Time 10:00 AM
 
Scope
The purpose of this project is to construct a maximum 5,000 square foot, single-story Composite Shop, 
located in Naval Station Norfolk, Virginia, that is an intermediate level (I-Level) maintenance facility for the 
CMV-22B aircraft platform. The facility design must account for the largest removable aircraft components 
anticipated to require maintenance and must be located in close proximity to maintenance hangars and 
other Fleet Readiness Center (FRC) airframe shops.

The Composite Shop will include areas for epoxy storage and mixing, paint storage and mixing, machining and grinding, cleaning and preparation, layup 
and bonding, a self-contained paint booth, exterior open storage, office space, restrooms and supporting 
mechanical, electrical and communication spaces. 

Site preparation includes demolition and site clearing, grubbing, grading, excavation, and pavement 
demolition. Paving and site improvements including grading, concrete aprons, pavement, and 
storm-water drainage. 
Plans 01 RFP
02 Plans and Specs
03 Amendments
Other Info

Notices

If you are looking for attached files related to a Notice, go back to the Home tab ("Project Files" are on the right side).
Title Created By Created On
Project SOW and Takeoff Available Emery Chickey 8/17/2023

If you have project-related questions, please contact your contractor or use the "Submit Question" tab.
If you are having technical difficulties downloading, please email support@preconsuite.com or call 949-222-0400.