GC - Ashkar Elementary School Rebid

Project Files

  • Addenda
    • Addendum 1 Uploaded: 10/3/2023 (4266 kb)
    • Addendum 2 Uploaded: 10/3/2023 (13554 kb)
    • Addendum 3 Uploaded: 10/3/2023 (6822 kb)
    • Addendum 4 Uploaded: 10/3/2023 (8675 kb)
    • Addendum 5 Uploaded: 10/3/2023 (4938 kb)
    • Addendum 6 Uploaded: 10/3/2023 (196 kb)
  • Drawings
    • Plumbing
      • P0.1 Gen Nts Uploaded: 10/2/2023 (1699 kb)
      • P0.2 Specs Uploaded: 10/2/2023 (687 kb)
      • P1.1 Fnd Pl-A Uploaded: 10/2/2023 (339 kb)
      • P1.2 Fnd Pl-B Uploaded: 10/2/2023 (422 kb)
      • P1.3 Fnd Pl-C Uploaded: 10/2/2023 (312 kb)
      • P1.4 1st Flr-A Uploaded: 10/2/2023 (700 kb)
      • P1.5 1st Flr-B Uploaded: 10/2/2023 (742 kb)
      • P1.6 1st Flr-C Uploaded: 10/2/2023 (613 kb)
      • P1.7 2nd Flr-A Uploaded: 10/2/2023 (445 kb)
      • P1.8 2nd Flr-B Uploaded: 10/2/2023 (579 kb)
      • PD1.1 1st Flr Demo-A Uploaded: 10/2/2023 (469 kb)
    • Mechanical
      • M0.1 Sch Uploaded: 10/2/2023 (1287 kb)
      • M0.10 Dtls Uploaded: 10/2/2023 (1258 kb)
      • M0.2 Sch Uploaded: 10/2/2023 (1234 kb)
      • M0.3 Sch Uploaded: 10/2/2023 (449 kb)
      • M0.4 Specs Uploaded: 10/2/2023 (1051 kb)
      • M0.5 Specs Uploaded: 10/2/2023 (1173 kb)
      • M0.6 Specs Uploaded: 10/2/2023 (544 kb)
      • M0.7 Specs Uploaded: 10/2/2023 (782 kb)
      • M0.8 Lgnd Nts Uploaded: 10/2/2023 (1621 kb)
      • M0.9 Dtls Uploaded: 10/2/2023 (1279 kb)
      • M1.1 1st Flr-A New Uploaded: 10/2/2023 (1131 kb)
      • M1.2 1st Flr-B New Uploaded: 10/2/2023 (930 kb)
      • M1.3 1st Flr-C New Uploaded: 10/2/2023 (574 kb)
      • M1.4 2nd Flr-A New Uploaded: 10/2/2023 (523 kb)
      • M1.4A 2nd Flr-A New Alt Uploaded: 10/2/2023 (408 kb)
      • M1.5 2nd Flr-B New Uploaded: 10/2/2023 (732 kb)
      • M1.6 Rf Pl-A New Uploaded: 10/2/2023 (314 kb)
      • M1.6A Rf Pl-A New Alt Uploaded: 10/2/2023 (308 kb)
      • M1.7 Rf Pl-B New Uploaded: 10/2/2023 (253 kb)
      • M1.8 Rf Pl-C New Uploaded: 10/2/2023 (232 kb)
      • M2.1 Enlgd Boiler Uploaded: 10/2/2023 (574 kb)
      • MD1.1 1st Flr Demo-A Uploaded: 10/2/2023 (467 kb)
      • MP1.1 1st Flr-A Pipe Uploaded: 10/2/2023 (699 kb)
      • MP1.2 1st Flr-B Pipe Uploaded: 10/2/2023 (578 kb)
      • MP1.3 1st Flr-C Pipe Uploaded: 10/2/2023 (287 kb)
      • MP1.4 2nd Flr-B Pipe Uploaded: 10/2/2023 (480 kb)
    • General
      • CS1 Cover Sheet Uploaded: 10/2/2023 (2181 kb)
    • Food Service
      • FS1.0 Equip Uploaded: 10/2/2023 (988 kb)
      • FS1.1 Elect Uploaded: 10/2/2023 (888 kb)
      • FS1.2 Plumb Uploaded: 10/2/2023 (583 kb)
      • FS2.0 Exh Hood Dtls Uploaded: 10/2/2023 (1021 kb)
      • FS2.1 Exh Hood Dtls Uploaded: 10/2/2023 (663 kb)
      • FS2.2 Exh Hood Dtls Uploaded: 10/2/2023 (765 kb)
      • FS3.0 Walk-In Dtls Uploaded: 10/2/2023 (645 kb)
      • FS3.1 Walk-In Dtls Uploaded: 10/2/2023 (451 kb)
    • Electrical
      • E0.0 Info Sheet Uploaded: 10/2/2023 (2477 kb)
      • E0.1 Site Pl Uploaded: 10/2/2023 (624 kb)
      • E1.1 1st Flr-A Ltng Uploaded: 10/2/2023 (903 kb)
      • E1.2 1st Flr-B Ltng Uploaded: 10/2/2023 (814 kb)
      • E1.3 1st Flr-C Ltng Uploaded: 10/2/2023 (567 kb)
      • E1.4 2nd Flr-A Ltng Uploaded: 10/2/2023 (292 kb)
      • E1.5 2nd Flr-B Ltng Uploaded: 10/2/2023 (736 kb)
      • E2.1 1st Flr-A Pwr Uploaded: 10/2/2023 (1401 kb)
      • E2.2 1st Flr-B Pwr Uploaded: 10/2/2023 (1210 kb)
      • E2.3 1st Flr-C Pwr Uploaded: 10/2/2023 (644 kb)
      • E2.3 1st Flr-C Pwr Addn 4-1 Uploaded: 10/2/2023 (629 kb)
      • E2.4 2nd Flr-A Pwr Uploaded: 10/2/2023 (393 kb)
      • E2.5 2nd Flr-B Pwr Uploaded: 10/2/2023 (1009 kb)
      • E2.6 Rf Pl-A Pwr Uploaded: 10/2/2023 (265 kb)
      • E2.6 Rf Pl-A Pwr Addn 4-1 Uploaded: 10/2/2023 (250 kb)
      • E2.7 Rf Pl-B Pwr Uploaded: 10/2/2023 (219 kb)
      • E2.7 Rf Pl-B Pwr Addn 4-1 Uploaded: 10/2/2023 (201 kb)
      • E2.8 Rf Pl-C Pwr Uploaded: 10/2/2023 (216 kb)
      • E2.8 Rf Pl-C Pwr Addn 4-1 Uploaded: 10/2/2023 (200 kb)
      • E3.1 Lg Scale Pl Uploaded: 10/2/2023 (618 kb)
      • E3.1 Lg Scale Pl Addn 4-1 Uploaded: 10/2/2023 (602 kb)
      • E3.2 Lg Scale Pl Uploaded: 10/2/2023 (1399 kb)
      • E3.2 Lg Scale Pl Addn 4-1 Uploaded: 10/2/2023 (1433 kb)
      • E4.0 Diag Uploaded: 10/2/2023 (504 kb)
      • E4.0 Diag Addn 4-1 Uploaded: 10/2/2023 (497 kb)
      • E4.1 Diag Uploaded: 10/2/2023 (904 kb)
      • E5.0 Dtls Uploaded: 10/2/2023 (721 kb)
      • E5.1 Dtls Uploaded: 10/2/2023 (553 kb)
      • E5.2 Dtls Uploaded: 10/2/2023 (593 kb)
      • E5.3 Dtls Uploaded: 10/2/2023 (734 kb)
      • E5.4 Dtls Uploaded: 10/2/2023 (279 kb)
      • E6.0 Sch Uploaded: 10/2/2023 (974 kb)
      • E6.0 Sch Addn 4-1 Uploaded: 10/2/2023 (978 kb)
      • E6.1 Sch Uploaded: 10/2/2023 (895 kb)
      • E6.1 Sch Addn 4-1 Uploaded: 10/2/2023 (877 kb)
      • E6.2 Sch Uploaded: 10/2/2023 (1550 kb)
      • E6.2 Sch Addn 4-1 Uploaded: 10/2/2023 (1535 kb)
      • E6.3 Sch Uploaded: 10/2/2023 (1023 kb)
      • ED1.0 1st Flr Demo Ltng Uploaded: 10/2/2023 (403 kb)
      • ED2.0 1st Flr Demo Pwr Uploaded: 10/2/2023 (458 kb)
      • ED2.1 1st Flr Enlgd Demo Pwr Uploaded: 10/2/2023 (700 kb)
    • Civil
      • 1 Cover-1 Uploaded: 10/2/2023 (2282 kb)
      • 10 Light-1 Uploaded: 10/2/2023 (2244 kb)
      • 11 ES-1 Uploaded: 10/2/2023 (824 kb)
      • 12 ES-2 Uploaded: 10/2/2023 (755 kb)
      • 13 Detail-1 Uploaded: 10/2/2023 (643 kb)
      • 14 Notes-1 Uploaded: 10/2/2023 (654 kb)
      • 2 Phase-1 Uploaded: 10/2/2023 (487 kb)
      • 3 Exist-1 Uploaded: 10/2/2023 (810 kb)
      • 4 Land-1 Uploaded: 10/2/2023 (666 kb)
      • 5 SW-1 Uploaded: 10/2/2023 (618 kb)
      • 6 SW-2 Uploaded: 10/2/2023 (553 kb)
      • 7 SW-3 Uploaded: 10/2/2023 (553 kb)
      • 8 Grade-1 Uploaded: 10/2/2023 (653 kb)
      • 9 Util-1 Uploaded: 10/2/2023 (570 kb)
    • Architectural
      • A0.1 Code Nts Uploaded: 10/2/2023 (3701 kb)
      • A0.2 Code Nts Uploaded: 10/2/2023 (2282 kb)
      • A0.3 Fire Rated Sys Uploaded: 10/2/2023 (3980 kb)
      • A0.4 Code Pl Uploaded: 10/2/2023 (902 kb)
      • A0.5 Code Pl Uploaded: 10/2/2023 (554 kb)
      • A0.6 Phase Pl Uploaded: 10/2/2023 (459 kb)
      • A0.7 Phase Pl Uploaded: 10/2/2023 (332 kb)
      • A0.8 Phase Pl Uploaded: 10/2/2023 (322 kb)
      • A1.1 Ovrl 1st Flr Uploaded: 10/2/2023 (1538 kb)
      • A1.2 Ovrl 2nd Flr Uploaded: 10/2/2023 (384 kb)
      • A1.3 1st Flr-A Uploaded: 10/2/2023 (752 kb)
      • A1.3 1st Flr-A Addn 5-1 Uploaded: 10/2/2023 (1402 kb)
      • A1.4 1st Flr-B Uploaded: 10/2/2023 (1173 kb)
      • A1.5 1st Flr-C Uploaded: 10/2/2023 (616 kb)
      • A1.6 2nd Flr-A Uploaded: 10/2/2023 (358 kb)
      • A1.7 2nd Flr-B Uploaded: 10/2/2023 (709 kb)
      • A1.8 1st 2nd Flr Alt Uploaded: 10/2/2023 (321 kb)
      • A1.9 Play Equip Uploaded: 10/2/2023 (1107 kb)
      • A10.1 Fin Sch Addn 1-1 Uploaded: 10/2/2023 (2061 kb)
      • A10.2 Fin Lgnd Uploaded: 10/2/2023 (1454 kb)
      • A10.3 1st Flr Fin-A Uploaded: 10/2/2023 (1056 kb)
      • A10.4 1st Flr Fin-B Uploaded: 10/2/2023 (1177 kb)
      • A10.5 1st Flr Fin-C Uploaded: 10/2/2023 (919 kb)
      • A10.6 2nd Flr Fin-A Uploaded: 10/2/2023 (411 kb)
      • A10.7 2nd Flr Fin-B Uploaded: 10/2/2023 (834 kb)
      • A10.8 Terrazzo Alt Uploaded: 10/2/2023 (755 kb)
      • A2.1 Ext Elev Uploaded: 10/2/2023 (917 kb)
      • A2.2 Ext Elev Uploaded: 10/2/2023 (945 kb)
      • A2.3 Ext Elev Uploaded: 10/2/2023 (934 kb)
      • A2.4 Ext Elev Uploaded: 10/2/2023 (680 kb)
      • A2.5 Ext Elev Alt Uploaded: 10/2/2023 (735 kb)
      • A3.1 Bldg Sect Uploaded: 10/2/2023 (1680 kb)
      • A3.2 Bldg Sect Uploaded: 10/2/2023 (809 kb)
      • A3.3 Bldg Sect Uploaded: 10/2/2023 (692 kb)
      • A3.4 Bldg Sect Alt Uploaded: 10/2/2023 (571 kb)
      • A4.1 Wl Sect Uploaded: 10/2/2023 (1029 kb)
      • A4.2 Wl Sect Uploaded: 10/2/2023 (1168 kb)
      • A4.3 Wl Sect Uploaded: 10/2/2023 (893 kb)
      • A4.4 Wl Sect Uploaded: 10/2/2023 (914 kb)
      • A4.5 Wl Sect Uploaded: 10/2/2023 (811 kb)
      • A4.6 Wl Sect Uploaded: 10/2/2023 (991 kb)
      • A4.7 Wl Sect Uploaded: 10/2/2023 (627 kb)
      • A4.8 Wl Sect Alt Uploaded: 10/2/2023 (687 kb)
      • A5.1 Rf Pl Uploaded: 10/2/2023 (1001 kb)
      • A5.2 Rf Dtls Uploaded: 10/2/2023 (2213 kb)
      • A5.3 Rf Dtls Uploaded: 10/2/2023 (1621 kb)
      • A5.4 Rf Dtls Uploaded: 10/2/2023 (811 kb)
      • A6.1 1st Flr RCP-A Uploaded: 10/2/2023 (873 kb)
      • A6.2 1st Flr RCP-B Uploaded: 10/2/2023 (831 kb)
      • A6.3 1st Flr RCP-C Uploaded: 10/2/2023 (468 kb)
      • A6.4 2nd Flr RCP-A Uploaded: 10/2/2023 (283 kb)
      • A6.5 2nd Flr RCP-B Uploaded: 10/2/2023 (584 kb)
      • A7.1 Elvtr Uploaded: 10/2/2023 (636 kb)
      • A7.2 Stair S1 Uploaded: 10/2/2023 (923 kb)
      • A7.3 Stair S2 Uploaded: 10/2/2023 (902 kb)
      • A7.4 Stair S3 Uploaded: 10/2/2023 (963 kb)
      • A7.5 Ramps Uploaded: 10/2/2023 (741 kb)
      • A7.5 Ramps Addn 5-1 Uploaded: 10/2/2023 (638 kb)
      • A7.6 Mech Loft Ladder Uploaded: 10/2/2023 (248 kb)
      • A7.7 Dtls Uploaded: 10/2/2023 (570 kb)
      • A8.1 1st Flr Int-A Uploaded: 10/2/2023 (771 kb)
      • A8.10 Enlgd-B Uploaded: 10/2/2023 (698 kb)
      • A8.11 Enlgd-B Nurse Uploaded: 10/2/2023 (820 kb)
      • A8.12 Enlgd-B Uploaded: 10/2/2023 (517 kb)
      • A8.13 Enlgd-B Uploaded: 10/2/2023 (593 kb)
      • A8.14 Int Elev-C Cafe Uploaded: 10/2/2023 (483 kb)
      • A8.14 Int Elev-C Cafe Addn 3-1 Uploaded: 10/2/2023 (1021 kb)
      • A8.15 Enlgd-A 2nd Flr Uploaded: 10/2/2023 (620 kb)
      • A8.16 Enlgd-B 2nd Flr Uploaded: 10/2/2023 (686 kb)
      • A8.17 Enlgd-B Art Uploaded: 10/2/2023 (488 kb)
      • A8.18 Int Elev-A Corr Uploaded: 10/2/2023 (457 kb)
      • A8.19 Int Elev-A Corr Uploaded: 10/2/2023 (345 kb)
      • A8.2 1st Flr Int-B Uploaded: 10/2/2023 (791 kb)
      • A8.20 Int Elev-B Corr Uploaded: 10/2/2023 (494 kb)
      • A8.21 Int Elev-B Corr Uploaded: 10/2/2023 (359 kb)
      • A8.22 Int Elev-B Corr Uploaded: 10/2/2023 (408 kb)
      • A8.23 Int Elev-C Corr Uploaded: 10/2/2023 (273 kb)
      • A8.24 Enlgd Recpt Dtls Uploaded: 10/2/2023 (553 kb)
      • A8.24 Enlgd Recpt Dtls Addn 3-1 Uploaded: 10/2/2023 (1262 kb)
      • A8.25 ADA Dtls Uploaded: 10/2/2023 (783 kb)
      • A8.26 Enlgd Tlt Rm Uploaded: 10/2/2023 (697 kb)
      • A8.27 Enlgd Tlt Rm Uploaded: 10/2/2023 (572 kb)
      • A8.28 Enlgd Tlt Rm Uploaded: 10/2/2023 (600 kb)
      • A8.29 Enlgd Tlt Rm Uploaded: 10/2/2023 (469 kb)
      • A8.3 1st Flr Int-C Uploaded: 10/2/2023 (861 kb)
      • A8.30 Enlgd Tlt Rm Uploaded: 10/2/2023 (617 kb)
      • A8.31 Enlgd Tlt Rm Uploaded: 10/2/2023 (604 kb)
      • A8.4 2nd Flr Int-A Uploaded: 10/2/2023 (303 kb)
      • A8.5 2nd Flr Int-B Uploaded: 10/2/2023 (654 kb)
      • A8.6 Enlgd-A Music Uploaded: 10/2/2023 (688 kb)
      • A8.7 Enlgd-A Media Uploaded: 10/2/2023 (748 kb)
      • A8.8 Enlgd-A Uploaded: 10/2/2023 (468 kb)
      • A8.9 Int Elev-A Gym Uploaded: 10/2/2023 (443 kb)
      • A9.1 Door Sch Uploaded: 10/2/2023 (807 kb)
      • A9.2 Door Types Uploaded: 10/2/2023 (700 kb)
      • A9.3 SF Types Uploaded: 10/2/2023 (745 kb)
      • A9.4 Win Types Uploaded: 10/2/2023 (537 kb)
      • AD1.1 1st Flr Demo Uploaded: 10/2/2023 (1001 kb)
      • AD1.2 1st Flr Demo Enlgd Uploaded: 10/2/2023 (1008 kb)
      • AD1.2 1st Flr Demo Enlgd Addn 5-1 Uploaded: 10/2/2023 (1702 kb)
    • Structural
      • S0.0 Gen Nts Uploaded: 10/2/2023 (2118 kb)
      • S0.1 Gen Nts Sch Uploaded: 10/2/2023 (1966 kb)
      • S0.2 Sch of Insp Uploaded: 10/2/2023 (925 kb)
      • S1.0 Fnd-A Uploaded: 10/2/2023 (1546 kb)
      • S1.1 Fnd-B Uploaded: 10/2/2023 (1225 kb)
      • S1.2 Fnd-C Uploaded: 10/2/2023 (757 kb)
      • S1.2 Fnd-C Addn 1-1 Uploaded: 10/2/2023 (762 kb)
      • S2.0 Rf Frm-A Uploaded: 10/2/2023 (1534 kb)
      • S2.1 2nd Flr Frm-B Uploaded: 10/2/2023 (1310 kb)
      • S3.0 Rf Frm-A Uploaded: 10/2/2023 (794 kb)
      • S3.1 Rf Frm-B Uploaded: 10/2/2023 (1005 kb)
      • S3.2 Rf Frm-C Uploaded: 10/2/2023 (1036 kb)
      • S3.3 Alt-A Uploaded: 10/2/2023 (895 kb)
      • S4.0 Exist Elev Mas Rep Uploaded: 10/2/2023 (719 kb)
      • S5.0 Sect Dtls Uploaded: 10/2/2023 (908 kb)
      • S5.1 Sect Dtls Uploaded: 10/2/2023 (809 kb)
      • S6.0 Typ Dtls Uploaded: 10/2/2023 (917 kb)
      • S6.1 Typ Dtls Uploaded: 10/2/2023 (1013 kb)
    • _Combined Drawings Uploaded: 10/2/2023 (149526 kb)
  • Sketches
    • ASK-01 Uploaded: 10/2/2023 (357 kb)
    • ASK-02 Uploaded: 10/2/2023 (357 kb)
    • ASK-03 Uploaded: 10/2/2023 (322 kb)
    • ASK-04 Uploaded: 10/2/2023 (109 kb)
    • ASK-05 Uploaded: 10/2/2023 (994 kb)
    • ASK-06 Uploaded: 10/2/2023 (415 kb)
    • ASK-07 Uploaded: 10/2/2023 (312 kb)
    • ASK-08 Uploaded: 10/2/2023 (313 kb)
    • ASK-09 Uploaded: 10/2/2023 (308 kb)
    • ASK-10 Uploaded: 10/2/2023 (343 kb)
    • ASK-11 Uploaded: 10/2/2023 (121 kb)
    • SSK-01 Uploaded: 10/2/2023 (187 kb)
    • SSK-02 Uploaded: 10/2/2023 (140 kb)
    • SSK-03 Uploaded: 10/2/2023 (132 kb)
  • Addenda Drawings
    • A1.3 1st Flr-A Addn 5 Uploaded: 10/2/2023 (1402 kb)
    • A10.1 Fin Sch Addn 1 Uploaded: 10/2/2023 (2061 kb)
    • A7.5 Ramps Addn 5 Uploaded: 10/2/2023 (638 kb)
    • A8.14 Int Elev-C Cafe Addn 3 Uploaded: 10/2/2023 (1021 kb)
    • A8.24 Enlgd Recpt Dtls Addn 3 Uploaded: 10/2/2023 (1262 kb)
    • AD1.2 1st Flr Demo Enlgd Addn 5 Uploaded: 10/2/2023 (1702 kb)
    • E2.3 1st Flr-C Pwr Addn 4 Uploaded: 10/2/2023 (629 kb)
    • E2.6 Rf Pl-A Pwr Addn 4 Uploaded: 10/2/2023 (250 kb)
    • E2.7 Rf Pl-B Pwr Addn 4 Uploaded: 10/2/2023 (201 kb)
    • E2.8 Rf Pl-C Pwr Addn 4 Uploaded: 10/2/2023 (200 kb)
    • E3.1 Lg Scale Pl Addn 4 Uploaded: 10/2/2023 (602 kb)
    • E3.2 Lg Scale Pl Addn 4 Uploaded: 10/2/2023 (1433 kb)
    • E4.0 Diag Addn 4 Uploaded: 10/2/2023 (497 kb)
    • E6.0 Sch Addn 4 Uploaded: 10/2/2023 (978 kb)
    • E6.1 Sch Addn 4 Uploaded: 10/2/2023 (877 kb)
    • E6.2 Sch Addn 4 Uploaded: 10/2/2023 (1535 kb)
    • S1.2 Fnd-C Addn 1 Uploaded: 10/2/2023 (762 kb)
  • Specifications
    • Act 114 Fingerprinting Report Uploaded: 10/2/2023 (147 kb)
    • Advertisement to Bid Uploaded: 10/2/2023 (179 kb)
    • Agreement of Surety Uploaded: 10/2/2023 (170 kb)
    • Allowance Form Uploaded: 10/2/2023 (130 kb)
    • Alternates Form Uploaded: 10/2/2023 (160 kb)
    • Arrest Conviction Report Uploaded: 10/2/2023 (176 kb)
    • BID FORM Uploaded: 10/2/2023 (157 kb)
    • Bid Bond Uploaded: 10/2/2023 (828 kb)
    • Bid Submittal Checklist Uploaded: 10/2/2023 (154 kb)
    • Conditions of the Contract Uploaded: 10/2/2023 (202 kb)
    • Contractors Qualifications Uploaded: 10/2/2023 (2795 kb)
    • Cover Table of Contents Uploaded: 10/2/2023 (245 kb)
    • Criminal Record Check Form Uploaded: 10/2/2023 (301 kb)
    • Div 01 General Requirements Uploaded: 10/2/2023 (3526 kb)
    • Div 02 Existing Conditions Uploaded: 10/2/2023 (194 kb)
    • Div 03 Concrete Uploaded: 10/2/2023 (327 kb)
    • Div 04 Masonry Uploaded: 10/2/2023 (429 kb)
    • Div 05 Metals Uploaded: 10/2/2023 (534 kb)
    • Div 06 Wood Plastic Composite Uploaded: 10/2/2023 (324 kb)
    • Div 07 Thermal Moisture Protection Uploaded: 10/2/2023 (1028 kb)
    • Div 08 Windows Doors Uploaded: 10/2/2023 (870 kb)
    • Div 09 Finishes Uploaded: 10/2/2023 (768 kb)
    • Div 10 Specialties Uploaded: 10/2/2023 (662 kb)
    • Div 11 Equipment Uploaded: 10/2/2023 (627 kb)
    • Div 12 Furnishings Uploaded: 10/2/2023 (325 kb)
    • Div 14 Conveying Systems Uploaded: 10/2/2023 (254 kb)
    • Div 26 Electrical Uploaded: 10/2/2023 (2636 kb)
    • Div 27 Communications Uploaded: 10/2/2023 (1166 kb)
    • Div 28 Electronic Safety Security Uploaded: 10/2/2023 (648 kb)
    • Div 31 Earthwork Uploaded: 10/2/2023 (299 kb)
    • Div 32 Exterior Improvements Uploaded: 10/2/2023 (419 kb)
    • Div 33 Utilities Uploaded: 10/2/2023 (246 kb)
    • Existing Conditions Uploaded: 10/2/2023 (148 kb)
    • Existing Hazardous Material Information Uploaded: 10/2/2023 (3231 kb)
    • Geotechnical Report Uploaded: 10/2/2023 (5855 kb)
    • Instructions to Bidders Uploaded: 10/2/2023 (7785 kb)
    • List of Drawings Uploaded: 10/2/2023 (193 kb)
    • Non-Collusion Affidavit of Prime Bidder Uploaded: 10/2/2023 (163 kb)
    • PA Child Abuse Clearance Form Uploaded: 10/2/2023 (809 kb)
    • Payment Bond Uploaded: 10/2/2023 (234 kb)
    • Performance Bond Uploaded: 10/2/2023 (256 kb)
    • Permit Application Uploaded: 10/2/2023 (147 kb)
    • Pre-Bid Meetings Uploaded: 10/2/2023 (174 kb)
    • Preliminary Schedule Uploaded: 10/2/2023 (176 kb)
    • Prevailing Wage Rates Uploaded: 10/2/2023 (2075 kb)
    • Project Forms Uploaded: 10/2/2023 (39482 kb)
    • Public Works Employment Verification Form Uploaded: 10/2/2023 (290 kb)
    • RFI Request Form Uploaded: 10/2/2023 (263 kb)
    • Release of Liens Uploaded: 10/2/2023 (174 kb)
    • Substitution Procedures Uploaded: 10/2/2023 (245 kb)
    • Substitution Request Form Uploaded: 10/2/2023 (168 kb)
    • Title Page Uploaded: 10/2/2023 (173 kb)
    • Unit Prices Form Uploaded: 10/2/2023 (135 kb)
    • _Combined Specifications Vol 1 Uploaded: 10/2/2023 (61999 kb)
    • _Combined Specifications Vol 2 Uploaded: 10/2/2023 (4683 kb)
    • _Combined Specifications Vol 3 Uploaded: 10/2/2023 (4744 kb)

Project Info

Project # 23-032
Project Name GC - Ashkar Elementary School Rebid
Location East Lycoming School District
Address Map It 350 Street Broad Street
City Hughesville
State PA
Zip 17737
Bid Date October 4, 2023
Bid Time 11:00 AM
 
Scope

Description of Project:
Project consists of construction of a new addition, partial demolition of existing building, comprehensive renovations to the existing building, and site work.

WE ARE REQUESTING BIDS FOR:

DIVISION 2   EXISTING CONDITIONS
02 41 19 Selective Demolition
Bulk Building Demolition

DIVISION 3   CONCRETE

03 30 00 Cast-In-Place Concrete
03 54 16 Hydraulic Cement Underlayment
 
DIVISION 4   MASONRY
04 01 10  Masonry Cleaning
04 01 20.64  Brick Masonry Repointing
04 20 00  Unit Masonry
 
DIVISION 5   METALS
05 12 00  Structural Steel Framing
05 21 00  Steel Joist Framing
05 31 00 Steel Decking
05 54 00 Cold-Formed Metal Framing
05 50 00 Metal Fabrications
05 51 13 Metal Pan Stairs
05 52 13 Pipe and Tube Railings

DIVISION 6   WOODS, PLASTICES, AND COMPOSITES
06 10 53  Rough Carpentry
06 16 00 Sheathing
06 20 23 Interior Finish Carpentry
06 61 00 Architectural Fiberglass Cornice
 
DIVISION 7   THERMAL AND MOISTURE PROTECTION
07 01 50.74 Rehabilitation of Single Ply Roofing
07 11 13 Bituminous Dampproofing
07 14 16 Cold Fluid-Applied Waterproofing
07 21 00 Thermal Insulation
07 21 13 EPS Geofoam
07 21 19 Foamed-In-Place Insulation
07 27 26 Fluid-Applied Membrane Air Barriers
07 42 13.13 Formed Metal Wall Panels

07 53 23 Ethylene Propylene Diene Monomer (EPDM) Membrane
07 56 00.13 Fluid-Applied Membrane Roofing, Insulated
07 62 00 Sheet Metal Flashing and Trim
07 71 00 Roof Specialties
07 72 00 Roof Accessories
07 81 00 Applied Fire Protection
07 81 23 Intumescent Fire Protection
07 84 13 Penetration Firestopping
07 84 43 Joint Firestopping
07 92 00 Joint Sealants
07 95 13.13 Interior Expansion Joint Cover Assemblies
 
DIVISION 8   OPENINGS
08 11 13  Hollow Metal Doors and Frames
08 14 16 Flush Wood Doors
08 14 23 Impact Resistant Interior Doors
08 33 13 Coiling Counter Doors
08 33 23 Overhead Coiling Doors
08 33 26 Overhead Coiling Grilles
08 41 13 Aluminum-Framed Entrances and Storefronts
08 45 23 Fiberglass-Sandwich-Panel Assemblies
08 51 13 Aluminum Windows
08 56 53 Security Windows
08 71 00 Door Hardware
08 80 00 Glazing
08 81 00 Fire-Rated Glazing
08 91 19 Fixed Louvers

DIVISION 9  FINISHES 
09 22 16 Non-Structural Metal Framing
09 29 00 Gypsum Board
09 30 13 Ceramic Tiling
09 51 13 Acoustical Panel Ceilings
09 64 66 Wood Athletic Flooring
09 65 13 Resilient Base and Accessories
09 65 19 Resilient Tile Flooring
09 66 23 Resinous Matrix Terrazzo Flooring
09 67 23 Resinous Flooring
09 68 13 Tile Carpeting
09 84 33 Sound-Absorbing Wall Units
09 91 13 Exterior Painting
09 91 23 Interior Painting
 
DIVISION 10  SPECIALTIES
10 11 00 Visual Display Units
10 12 00 Display Cases
10 14 16 Plaques
10 14 19 Dimensional Letter Signage
10 14 23 Panel Signs
10 21 13.19 Plastic Toilet Compartments
10 21 23 Cubicle Tracks and Curtains
10 26 00 Wall Protection
10 28 00 Toilet and Bath Accessories
10 44 13 Fire Protection Cabinets
10 44 16 Fire Extinguishers
10 44 20 High Security Key Vault For Rapid Entry
10 51 26  Plastic Lockers
10 53 00 Hanger Rod Canopy
10 56 13 Metal Storage Shelving
10 60 00 Art Room Equipment - Kiln & Vent System
10 75 16 Ground-Set Flagpoles

DIVISION 11  EQUIPMENT
11 30 13 Residential Appliances
11 40 00 Food Service Equipment
1151 23 Library Stack Systems
11 52 13 Projection Screens
11 68 00 Play Equipment and Structures
 
DIVISION 12   FURNISHINGS
12 24 13 Roller Window Shades
12 35 40 Manufactured Plastic Laminate Casework
12 35 51 Music Storage Casework
12 36 61.16 Solid Surface Countertops
12 48 13 Entrance Floor Mats and Frames

DIVISION 14   CONVEYING EQUIPMENT
14 24 00 Hydraulic Elevators

DIVISION 31   EARTHWORK
31 10 00 Site Clearing
31 22 19 Landscape Grading
31 23 16 Excavation
31 23 23.13 Backfill
31 23 33 Trenching and Backfilling
31 25 13 Erosion Controls
 
DIVISION 32   EXTERIOR IMPROVEMENTS
32 12 00 Flexible Paving
32 18 16.13 Playground Protective Surfacing
Seeding & Plantings
32 94 43 Bollards
 
DIVISION 33   UTILITIES
33 11 16 Site Water Utility Distribution Piping
33 31 00 Sanitary Utility Sewerage Piping
33 40 00 Storm Drainage Facilities

Plans
Other Info

Subcontractors are reminded to review UNIT PRICES, QUANTITY ALLOWANCES, AND ALTERNATE Options. 

To receive addendum notices you must select 'YES' to this bid invitation.

Notices

If you are looking for attached files related to a Notice, go back to the Home tab ("Project Files" are on the right side).
Title Created By Created On
Notice of Addendum 1 Valerie Slagle 9/15/2023
Notice of Addendum 2 Diane Womelsdorf 9/19/2023
Notice of Addendum 3 Diane Womelsdorf 9/22/2023
Ashkar Elementary School Rebid Valerie Slagle 9/25/2023
Notice of Addendum 4 Valerie Slagle 9/27/2023
Notice of Addendum 5 Valerie Slagle 10/2/2023
Notice of Addendum 6 Valerie Slagle 10/3/2023

Estimators

Company Estimator Phone Extension Fax Email
Lobar, Inc. Brandon Lebo 717-432-9728 4268 BrandonL@lobar.com
Lobar, Inc Dan Beigh 717-432-9728 4245 dan.beigh@lobar.com
Lobar, Inc. Eric Bowen 717-432-9728 4289 eric.bowen@lobar.com
Lobar, Inc. Scott Lowery 717-432-9728 4212 717-432-9162 Scott.Lowery@lobar.com

If you have project-related questions, please contact your contractor or use the "Submit Question" tab.
If you are having technical difficulties downloading, please email support@pipelinesuite.com or call 949-222-0400.