Project Info
|
Project # |
24-003 |
Project Name
|
GC - South Fork WWTP ATAD and UV Additions
|
Location
|
Forest Hills Municipal Authority
|
Address
|
Map It
151 Cross Street
|
City
|
South Fork
|
State
|
PA
|
Zip
|
15956
|
Bid Date
|
January 10, 2024
|
Bid Time
|
11:00 AM
|
|
|
Scope |
Furnish all materials, equipment, supplies, and labor required for the construction of a new Autothermal Thermophilic Aerobic Digestion (ATAD) System, including two reactor basins, a biofilter basin, and an equipment building with pumps, blowers, a drum thickener, and other necessary appurtenances, a new Ultraviolet Disinfection (UV) System, including a new UV disinfection channel, equipment, and building, and all associated piping, appurtenances, and site work necessary to integrate the new facilities in with the existing WWTP.
|
Plans |
|
Other Info |
We are requesting bids for the following specification sections:
DIVISION 02 – EXISTING CONDITIONS
02 41 19.13 Selective Building Demolition
DIVISION 03 – CONCRETE
03 10 00 Concrete Forming and Accessories 03 10 01.00 Concrete Pavement, Walks, and Curbs 03 10 02.00 Concrete Paving and Walkway Joint Sealants 03 20 00 Concrete Reinforcing 03 30 00 Cast-In-Place Concrete 03 31 00 CIP Concrete Base Slab for Precast Post-Tensioned Tank 03 42 00 Precast Post-Tensioned Concrete Tank and Building 03 60 00 Grouting
DIVISION 04 – MASONRY
04 20 00 Concrete Masonry and Core Insulation
DIVISION 05 – METALS
05 00 00 Miscellaneous Metals 05 12 00 Structural Steel
DIVISION 06 – CARPENTRY
06 10 00 Carpentry Work 06 74 13 Fiberglass Reinforced Handrails, Gratings & Ladders
DIVISION 08 – OPENINGS
08 11 13 Entrance Doors, Windows, and Frames 08 36 13 Sectional Overhead Doors 08 71 00 Door Hardware
DIVISION 09 – FINISHES
09 91 23 Interior Painting
DIVISION 10 – SPECIALTIES
10 44 16 Fire Extinguishers
DIVISION 22 – PLUMBING
22 05 03 Pipes and Tubes for Plumbing Piping and Equipment
DIVISION 23 – MECHANICAL
23 00 15 Basic Requirements for HVAC 23 07 19 HVAC Piping Insulation 23 21 13 Hydronic Piping 23 31 10 Air Distribution Systems and Accessories 23 33 00 Air Duct Accessories 23 34 23 HVAC Power Ventilators 23 82 39 Unit Heaters
DIVISION 31 – EARTHWORK
31 05 13 Soils for Earthwork 31 05 16 Aggregate for Earthwork 31 10 00 Site Clearing 31 23 16 Excavation 31 23 16.13 Trenching 31 23 16.26 Rock Removal 31 23 19 Dewatering 31 23 23 Fill 31 25 00 Erosion and Sedimentation Controls
DIVISION 32 – EXTERIOR IMPROVEMENTS
32 11 23 Aggregate Base Courses 32 13 13 Concrete Paving 32 31 13 Chain Link Fences and Gates 32 91 19 Landscape Grading 32 92 19 Seeding
DIVISION 33 – UTILITIES
33 01 30.13 Sewer And Manhole Testing 33 05 05.31 Hydrostatic Testing 33 05 13.16 Public Manholes and Structures 33 05 16.13 Precast Concrete Utility Structures 33 31 13 Public Sanitary Utility Sewerage Piping
DIVISION 40 – PROCESS INTERCONNECTIONS
40 05 19 Ductile Iron Process Pipe 40 05 23 Stainless Steel Pipe 40 05 65 Swing Check, Plug, and Gate Valves
DIVISION 46 – WATER AND WASTEWATER EQUIPMENT
46 10 00 Reciprocating Positive Displacement Pumps 46 11 00 Vertical Turbine Pumps Wet Pit 46 20 00 Liquid Polymer Blending System 46 30 00 Rotary Drum Thickener 46 40 00 Submersible Chopper Pumps 46 50 00 Autothermal Thermophilic Aerobic Digestion System 46 70 00 UV Disinfection System 46 80 00 Pump Station Control Panel
|
|