Scope |
Project consists of construction of a new 2-story Firehouse for the Charlotte Fire Department (CFD).
1. The Work includes a concrete slab on grade, elevated concrete composite slab, reinforced concrete masonry unit walls, structural steel, and metal deck roof framing. The exterior consists of modular brick veneer, prefinished aluminum metal panel systems, and storefront window systems.
2. New exterior construction work will consist of masonry screen walls, landscaping, sidewalks, new parking lots, stormwater control measures, new dumpster enclosure, and fencing.
3. The project also includes fire sprinkler system, geothermal, in-slab heating, and photovoltaic panels.
4. Interior finishes include a combination of gypsum wallboard on metal studs or furring channels and painted block walls. Acoustical and gypsum board ceilings. Floor finishes include integral color concrete, tile, carpet, porcelain tile, luxury vinyl tile, and rubber flooring.
5. Special coordination will be required with the owner’s security vendor, A/V vendor, and furniture vendor.
|