Saluda Detention Center and EMS Facility

Project Files

  • EMS Facility Plans
    • Salusa EMS Facility Master Set.pdf Uploaded: 2/9/2024 (29951 kb)
  • Project Manual
    • Saluda Project Manual.pdf Uploaded: 2/9/2024 (46814 kb)
  • Addenda
    • Saluda Detention and EMS - ADD01.pdf Uploaded: 2/21/2024 (4304 kb)
    • Saluda Detention and EMS - ADD02.pdf Uploaded: 2/29/2024 (17971 kb)
    • Saluda Detention and EMS - ADD03.pdf Uploaded: 3/4/2024 (9170 kb)
  • Detention Center Plans
    • Saluda Detention Center Master Set.pdf Uploaded: 2/9/2024 (70685 kb)

Project Info

Project # 24011U
Project Name Saluda Detention Center and EMS Facility
Location Saluda, SC
Address Map It 100 Law Enforcement Dr
City Saluda
State SC
Zip 29138
Bid Date March 6, 2024
Bid Time 2:00 PM
 
Scope
The Project consists of two buildings, a new detention center and a new EMS facility on the same site to be bid concurrently to a single prime contractor. The detention center totals 37,000 sf and the EMS facility totals 8,500 sf. Construction includes CMU and brick veneer masonry construction, interior CMU partitions, TPO roofing, detention equipment, security electronics, and finishes typically associated with a detention center. The jail project includes steel modular detention cells, dayrooms, recreation yards, multi-purpose rooms, and utility spaces. Sitework includes sidewalks, grading, and fencing/gates. Mechanical work includes ductwork, plumbing, sprinkler system, smoke control system, bas controls, and rooftop units. Electrical work includes panelboards, lighting fixtures, fire alarm, emergency generator,  power, technology wiring and infrastructure; and security systems (cameras, intercoms, duress, door controls, and touchscreens).

The EMS facility will be a pre-engineered metal building.
 
Plans Plans for both buildings and manual are located in the Planroom.
Other Info Contact Randal Ellison if you have any questions. 

rellison@lilesconstruction.com
(
912) 690-2282

Notices

If you are looking for attached files related to a Notice, go back to the Home tab ("Project Files" are on the right side).
Title Created By Created On
Addendum #01 Randal Ellison 2/21/2024
Addendum #02 Randal Ellison 2/29/2024
Addendum #03 Randal Ellison 3/2/2024

Estimators

Company Estimator Phone Extension Fax Email
Liles Construction Co., Inc. Matthew Stewart 912-515-5923 mstewart@lilesconstruction.com
Liles Construction Co., Inc. Zach Biggin 516-384-9485 zbiggin@lilesconstruction.com

If you have project-related questions, please contact your contractor or use the "Submit Question" tab.
If you are having technical difficulties downloading, please email support@pipelinesuite.com or call 949-222-0400.