Wastewater System Improvements Schedule B - 2024

Project Files

  • Bidders Packet.PDF Uploaded: 2/29/2024 (17435 kb)
  • Bidding and Contract Documents.PDF Uploaded: 2/29/2024 (74507 kb)
  • vu_Drawings.pdf Uploaded: 2/29/2024 (59530 kb)

Project Info

Project # None
Project Name Wastewater System Improvements Schedule B - 2024
Location Dufur, Oregon
Address Map It 175 N.E. Third Street
City Dufur
State OR
Zip 97021
Bid Date March 19, 2024
Bid Time 2:00 PM
 
Scope Water and Wastewater Facilities

The Work for this Contract involves the construction of a fully functional wastewater treatment system. The scope includes an influent flowmeter and screening, lift station, treatment and storage lagoons, chlorination building and system, effluent pump station, irrigation pump station, approximately 7-acre center pivot irrigation system, and all other Work required for a complete and functional wastewater treatment system as shown on the Drawings and specified in the Technical Specifications

The Contract will be subject to the Davis-Bacon Act (40USC3141-3148) and the applicable provisions of ORS 279C.800 through ORS 279C.870 (the Oregon Prevailing Wage Law).


This Project is being funded through the Business Oregon Infrastructure Finance Authority, Clean Water State Revolving Fund, USDA Rural Development, and the City of Dufur.

Instructions to Bidders

For all further requirements regarding bid submittal, qualifications, procedures, and contract award, refer to the Instructions to Bidders that are included in the Bidding Documents.

American Iron and Steel

Section 746 of Title VII of the Consolidated Appropriations Act of 2017 (Division A - Agriculture, Rural Development, Food and Drug Administration, and Related Agencies Appropriations Act, 2017) and subsequent statutes mandating domestic preference applies an American Iron and Steel requirement to this project. All iron and steel products used in this project must be produced in the United States. The term “iron and steel products” means the following products made primarily of iron or steel: lined or unlined pipes and fittings, manhole covers and other municipal castings, hydrants, tanks, flanges, pipe clamps and restraints, valves, structural steel, reinforced precast concrete, and Construction Materials. The following waivers apply to this Contract: De Minimis, Minor Components, Pig Iron, and Direct Reduced Iron.
Plans
Other Info
IMPORTANT NOTICE: TNW strives to furnish the latest bid information promptly after its publication by the source indicated in the project invitation to bid. Nevertheless, TNW cannot assure the completeness or real-time updating of this information before the bid. Bidders are urged to independently verify and thoroughly review all documents made available by the owner at the time of the bid.

Taylor NW Contacts

Company Contact Title Phone Extension Fax Email
Taylor NW Marty Johnson Project Manager/Estimator 541-382-7887 mjohnson@taylornw.com

If you have project-related questions, please contact your contractor or use the "Submit Question" tab.
If you are having technical difficulties downloading, please email support@pipelinesuite.com or call 949-222-0400.