Take 5 - Shelby

Project Files

  • Drawings
    • T5 - Shelby_ASMEP Drawings - 02.01.24.pdf Uploaded: 3/14/2024 (22956 kb)
    • T5 - Shelby_Civil Drawings - 01.26.24.pdf Uploaded: 3/14/2024 (11494 kb)
  • Reports
    • 231800.20 Take 5 - Shelby NC Geotech Report 7-11-2023.pdf Uploaded: 3/14/2024 (3168 kb)
    • 231800.30 Take 5 - Shelby NC Ph I - 7-18-2023.pdf Uploaded: 3/14/2024 (23851 kb)
    • 231800.31 R1 Take 5 - Shelby NC Limited Ph II ESI - 9-25-2023.pdf Uploaded: 3/14/2024 (15282 kb)
    • 231800.31 Take 5 - Shelby NC Ph II Supplement - 10-18-2023.pdf Uploaded: 3/14/2024 (1457 kb)
  • Shelby NC - Bid Form.xlsx Uploaded: 3/14/2024 (57 kb)
  • Shelby NC - Site Plan Cost Breakdown.pdf Uploaded: 3/14/2024 (727 kb)

Project Info

Project # 24043
Project Name Take 5 - Shelby
Location
Address Map It 1776 E Dixon Blvd
City Shelby
State NC
Zip 28152
Bid Date March 28, 2024
Bid Time 5:00 PM
 
Scope This project scope consists of building a 1,489 SF Take 5 Oil Change with a Tower, a pad ready site for future development and common site improvements between the two spaces. This scope of work includes but is not limited to:
  • Surveying
  • Concrete
  • Masonry
  • Misc. Steel
  • Rough Carpentry
  • Wood Framing
  • Wood Trusses
  • Casework
  • EIFS
  • Waterproofing/Joint Sealants
  • TPO Roofing
  • Metal Roofing
  • Gutters/Downspouts
  • Doors, Frames and Hardware
  • Glass Assemblies
  • Overhead Doors
  • Painting
  • Fluid Applied Flooring
  • Wall Coverings
  • Toilet Accessories
  • Monument Sign
  • Plumbing
  • HVAC
  • Electrical
  • Site Demo
  • Earthwork & Grading
  • Site Improvements
  • Soil Treatment
  • Asphalt Paving
  • Site Concrete
  • Curb and Gutter
  • Fencing
  • Landscaping
  • Site Utilities
Plans Multiple Documents can be found in Planroom:
  • Drawings
    • ASMEP Drawings
    • Site Drawings
  • Reports
    • Environmental Reports
    • Geotechnical Reports
  • Site Improvement Scope
  • Bid Form
Other Info THE FOLLOWING INFORMATION MUST BE PROVIDED WITH YOUR QUOTE:
  • Durations for Work
  • Material and Labor Breakout
  • Line Item Quotes

If you have project-related questions, please contact your contractor or use the "Submit Question" tab.
If you are having technical difficulties downloading, please email support@pipelinesuite.com or call 949-222-0400.