Nebraska State Patrol Crime Lab Addition & Renovation

Project Files

  • 2014 Lab Drawings - Demo Take off - Electrical Disconnects.pdf Uploaded: 6/28/2024 (174 kb)
  • 2014 Lab Drawings - Demo Take off - HVAC Disconnects.pdf Uploaded: 6/28/2024 (162 kb)
  • 2014 Lab Drawings - Demo Take off - Plumbing Disconnects.pdf Uploaded: 6/28/2024 (176 kb)
  • 20230529-NSPCL_CD_Submittal.pdf Uploaded: 6/8/2024 (62696 kb)
  • 20240529-CD Combined Specifications.pdf Uploaded: 6/8/2024 (19584 kb)
  • Crime Lab_ Addendum_01.pdf Uploaded: 6/26/2024 (152 kb)
  • Crime Lab_ Addendum_02.pdf Uploaded: 6/26/2024 (660 kb)
  • Crime Lab_ Addendum_03.pdf Uploaded: 6/26/2024 (13322 kb)
  • Crime Lab_ Addendum_04.pdf Uploaded: 6/28/2024 (68 kb)
  • Crime Lab_ Addendum_05-1.pdf Uploaded: 7/2/2024 (418 kb)
  • Crime Lab_ Addendum_05.pdf Uploaded: 7/2/2024 (418 kb)

Project Info

Project # Project No. 003-10205-026
Project Name Nebraska State Patrol Crime Lab Addition & Renovation
Location Lincoln
Address Map It 3977 Air Park Road
City Lincoln
State NE
Zip 68524
Bid Date July 9, 2024
Bid Time 2:00 PM
Site Meeting Date June 13, 2024
Site Meeting Time 8:30 AM
 
Scope
Project Description: Project consists of phased new construction additions and renovation of 
existing building.  Building will remain occupied and operational throughout construction.  
Project scope consists of addition and/ or renovation of specialty laboratory areas, offices, 
mechanical, electrical, and storage spaces.   
Plans Cheever Construction On Line Plan Portal.
Other Info Prebid Meeting - Mandatory for General Contractor - 
This project is tax exempt.
There are 4 bid Alternates.

Notices

If you are looking for attached files related to a Notice, go back to the Home tab ("Project Files" are on the right side).
Title Created By Created On
Addendum 001 - Change Pre-Con Meeting Date. Brian Clinton 6/11/2024
Addendum 002 and 003 Brian Clinton 6/26/2024
Addendum 004 Brian Clinton 6/28/2024
MEP Disconnects For Existing Lab Equipment Brian Clinton 6/28/2024
EXTEND BID DATE TO JULY 9TH, 2024 AS PER ADDENDUM 05. Brian Clinton 7/2/2024

Estimators

Company Estimator Phone Extension Fax Email
Cheever Construction Brian Clinton 402-477-6745 bclinton@cheeverconstruction.com

If you have project-related questions, please contact your contractor or use the "Submit Question" tab.
If you are having technical difficulties downloading, please email support@pipelinesuite.com or call 949-222-0400.