GC - Danville WWTP Dewatering Upgrades

Project Files

  • Drawings
    • Structural
      • S-1 InspectOberv Nts Uploaded: 9/27/2024 (1296 kb)
      • S-2 Gen Nts Uploaded: 9/27/2024 (1290 kb)
      • S-3 Misc Dtls Uploaded: 9/27/2024 (717 kb)
      • S-4 Fnd Pl Uploaded: 9/27/2024 (406 kb)
      • S-5 Enlrgd Pl Uploaded: 9/27/2024 (493 kb)
      • S-6 Sects Sht 1 Uploaded: 9/27/2024 (621 kb)
      • S-7 Sects Sht 2 Uploaded: 9/27/2024 (581 kb)
      • S-8 Dtls Uploaded: 9/27/2024 (569 kb)
    • Architectural
      • A-1 Bldg Code Data Uploaded: 9/27/2024 (1258 kb)
      • A-2 Gen Info Uploaded: 9/27/2024 (907 kb)
      • A-3 Fl Pl Uploaded: 9/27/2024 (1556 kb)
      • A-4 Rfl Clg Plo Uploaded: 9/27/2024 (673 kb)
      • A-5 Rf PlRf Frmg Pls Uploaded: 9/27/2024 (584 kb)
      • A-6 Elvs Uploaded: 9/27/2024 (1058 kb)
      • A-7 Bldg SectsDtls Uploaded: 9/27/2024 (1175 kb)
      • A-8 Wall SectsDtls Uploaded: 9/27/2024 (1022 kb)
      • A-9 Dr SchDtls Uploaded: 9/27/2024 (1098 kb)
      • A-9 Dr SchDtls Addn 2-1 Uploaded: 9/27/2024 (962 kb)
    • Instrumentation
      • I-1 SymbsAbbrevs Uploaded: 9/27/2024 (988 kb)
      • I-2 Syst Arch Uploaded: 9/27/2024 (260 kb)
      • I-3 Centrifuge PID Uploaded: 9/27/2024 (376 kb)
      • I-3 Centrifuge PID Addn 1-1 Uploaded: 9/27/2024 (377 kb)
      • I-3 Centrifuge PID Addn 2-1 Uploaded: 9/27/2024 (356 kb)
      • I-4 Prim Dig Pumps Replacement PID Uploaded: 9/27/2024 (300 kb)
      • I-5 Polymer Feed Syst PID Uploaded: 9/27/2024 (261 kb)
      • I-6 Fiber Optic Enclosure LOWiring Diag Uploaded: 9/27/2024 (275 kb)
      • I-7 Installation Dtls Uploaded: 9/27/2024 (251 kb)
    • Mechanical
      • MH-1 Lgnd Uploaded: 9/27/2024 (708 kb)
      • MH-10 Cntrls Diags Uploaded: 9/27/2024 (925 kb)
      • MH-11 Isometric Views Uploaded: 9/27/2024 (1202 kb)
      • MH-2 Gen NotesAbbrevs Uploaded: 9/27/2024 (1160 kb)
      • MH-3 Fl Pl Uploaded: 9/27/2024 (426 kb)
      • MH-4 Sects Uploaded: 9/27/2024 (327 kb)
      • MH-5 Dtls Sht 1 Uploaded: 9/27/2024 (627 kb)
      • MH-6 Dtls Sht 2 Uploaded: 9/27/2024 (509 kb)
      • MH-7 Schs Uploaded: 9/27/2024 (671 kb)
      • MH-8 Natural Gas Riser Diag Uploaded: 9/27/2024 (363 kb)
      • MH-9 Cntrls Lgnd Uploaded: 9/27/2024 (542 kb)
    • Plumbing
      • MP-1 Lgnd Uploaded: 9/27/2024 (395 kb)
      • MP-10 Domestic Wtr Riser Diag Uploaded: 9/27/2024 (476 kb)
      • MP-2 Gen NotesAbbrevs Uploaded: 9/27/2024 (1313 kb)
      • MP-3 Fl Pl-SanitVent Uploaded: 9/27/2024 (407 kb)
      • MP-4 Fl Pl-Domestic Wtr Uploaded: 9/27/2024 (337 kb)
      • MP-5 Enlrgd PlsSects Uploaded: 9/27/2024 (379 kb)
      • MP-6 Dtls Sht 1 Uploaded: 9/27/2024 (608 kb)
      • MP-7 Dtls Sht 2 Uploaded: 9/27/2024 (405 kb)
      • MP-8 Schs Uploaded: 9/27/2024 (430 kb)
      • MP-9 SanitVent Riser Diag Uploaded: 9/27/2024 (891 kb)
    • Process
      • P-1 Abbrevs Uploaded: 9/27/2024 (1073 kb)
      • P-10 Sects - Sht 1 Uploaded: 9/27/2024 (568 kb)
      • P-11 Sects - Sht 2 Uploaded: 9/27/2024 (355 kb)
      • P-12 Sects - Sht 3 Uploaded: 9/27/2024 (633 kb)
      • P-13 Sects - Sht 4 Uploaded: 9/27/2024 (998 kb)
      • P-14 Schms Uploaded: 9/27/2024 (799 kb)
      • P-15 Misc Dtls Uploaded: 9/27/2024 (570 kb)
      • P-2 Symbs Uploaded: 9/27/2024 (426 kb)
      • P-3 Exist Partl Process Flow Diag Uploaded: 9/27/2024 (270 kb)
      • P-4 Prop Partl Process Flow Diag Uploaded: 9/27/2024 (287 kb)
      • P-5 Fl Pl Uploaded: 9/27/2024 (773 kb)
      • P-6 Enlrgd Fl Pl Uploaded: 9/27/2024 (827 kb)
      • P-7 Enlrgd Under Slab Pl Uploaded: 9/27/2024 (308 kb)
      • P-8 Basemnt Pls Uploaded: 9/27/2024 (908 kb)
      • P-9 Grnd Fl Pl Uploaded: 9/27/2024 (578 kb)
    • Demolition
      • D-1 Site Pl Uploaded: 9/27/2024 (585 kb)
      • D-2 Enlrgd Pl Uploaded: 9/27/2024 (3315 kb)
      • D-3 SectDtl Uploaded: 9/27/2024 (2843 kb)
      • D-4 Sects Uploaded: 9/27/2024 (2227 kb)
      • D-5 Basemnt Demo Pls Uploaded: 9/27/2024 (1091 kb)
      • D-6 Grnd Fl Demo Pl Uploaded: 9/27/2024 (751 kb)
    • Electrical
      • E-1 Lgnd Uploaded: 9/27/2024 (749 kb)
      • E-10 One Line Diags Uploaded: 9/27/2024 (438 kb)
      • E-11 MCC3 One Line Modifs Uploaded: 9/27/2024 (548 kb)
      • E-12 Pnl Schs Sht 1 Uploaded: 9/27/2024 (863 kb)
      • E-12 Pnl Schs Sht 1 Addn 1-1 Uploaded: 9/27/2024 (823 kb)
      • E-13 Pnl Schs Sht 2 Uploaded: 9/27/2024 (954 kb)
      • E-14 Wiring Diags Sht 1 Uploaded: 9/27/2024 (510 kb)
      • E-14 Wiring Diags Sht 1 Addn 1-1 Uploaded: 9/27/2024 (479 kb)
      • E-15 Wiring Diags Sht 2 Uploaded: 9/27/2024 (408 kb)
      • E-15 Wiring Diags Sht 2 Addn 1-1 Uploaded: 9/27/2024 (397 kb)
      • E-16 Wiring Diags Sht 3 Uploaded: 9/27/2024 (411 kb)
      • E-16 Wiring Diags Sht 3 Addn 1-1 Uploaded: 9/27/2024 (281 kb)
      • E-17 Wiring Diags Sht 4 Uploaded: 9/27/2024 (486 kb)
      • E-18 Interconnection Diag Uploaded: 9/27/2024 (486 kb)
      • E-18 Interconnection Diag Addn 1-1 Uploaded: 9/27/2024 (451 kb)
      • E-18 Interconnection Diag Addn 2-1 Uploaded: 9/27/2024 (408 kb)
      • E-19 Dtls Uploaded: 9/27/2024 (400 kb)
      • E-2 Gen NotesAbbrevs Uploaded: 9/27/2024 (1469 kb)
      • E-3 Site Pl Uploaded: 9/27/2024 (559 kb)
      • E-4 Fl Pl-Ltg Uploaded: 9/27/2024 (464 kb)
      • E-5 Flr Pl-Pwr Uploaded: 9/27/2024 (973 kb)
      • E-5 Flr Pl-Pwr Addn 1-1 Uploaded: 9/27/2024 (924 kb)
      • E-6 Enlrgd Pl-Process PWR Uploaded: 9/27/2024 (831 kb)
      • E-6 Enlrgd Pl-Process Pwr Addn 1-1 Uploaded: 9/27/2024 (787 kb)
      • E-7 Digester Basemnt Uploaded: 9/27/2024 (1303 kb)
      • E-8 Digester Grnd Fl Uploaded: 9/27/2024 (1098 kb)
      • E-9 Boiler Bldg Uploaded: 9/27/2024 (232 kb)
    • Erosion Sedimentation
      • ES-1 Notes-Lgnds-Abbrevs Uploaded: 9/27/2024 (1366 kb)
      • ES-2 Exist Conds Uploaded: 9/27/2024 (810 kb)
      • ES-3 Prop Conds Uploaded: 9/27/2024 (670 kb)
      • ES-4 Dtls Uploaded: 9/27/2024 (1556 kb)
      • ES-5 Notes 1 Uploaded: 9/27/2024 (3349 kb)
      • ES-6 Notes 2 Uploaded: 9/27/2024 (2421 kb)
    • General
      • Cvr Sht Uploaded: 9/27/2024 (2051 kb)
      • G-1 Dwg Index Uploaded: 9/27/2024 (445 kb)
    • Civil
      • C-1 Symbs-Lgnds-Abbrevs Uploaded: 9/27/2024 (1185 kb)
      • C-2 Exist Site Pl Uploaded: 9/27/2024 (617 kb)
      • C-3 Prop Site Pl Uploaded: 9/27/2024 (696 kb)
      • C-4 Enlrgd Prop Site Pl Uploaded: 9/27/2024 (448 kb)
      • C-5 Exist Yd Piping Pl Uploaded: 9/27/2024 (674 kb)
      • C-6 Prop Yd Piping Pl Uploaded: 9/27/2024 (565 kb)
      • C-7 PCSM Pl Uploaded: 9/27/2024 (1169 kb)
      • C-8 Dtls Sht 1 Uploaded: 9/27/2024 (1042 kb)
      • C-9 Dtls Sht 2 Uploaded: 9/27/2024 (817 kb)
    • __Combined Drawings Uploaded: 9/27/2024 (82924 kb)
  • Addenda Drawings
    • Addendum 1
      • E-12 Pnl Schs Sht 1 Addn 1 Uploaded: 9/27/2024 (823 kb)
      • E-14 Wiring Diags Sht 1 Addn 1 Uploaded: 9/27/2024 (479 kb)
      • E-15 Wiring Diags Sht 2 Addn 1 Uploaded: 9/27/2024 (397 kb)
      • E-16 Wiring Diags Sht 3 Addn 1 Uploaded: 9/27/2024 (281 kb)
      • E-18 Interconnection Diag Addn 1 Uploaded: 9/27/2024 (451 kb)
      • E-5 Flr Pl-Pwr Addn 1 Uploaded: 9/27/2024 (924 kb)
      • E-6 Enlrgd Pl-Process Pwr Addn 1 Uploaded: 9/27/2024 (787 kb)
      • I-3 Centrifuge PID Addn 1 Uploaded: 9/27/2024 (377 kb)
    • Addendum 2
      • A-9 Dr SchDtls Addn 2 Uploaded: 9/27/2024 (962 kb)
      • E-18 Interconnection Diag Addn 2 Uploaded: 9/27/2024 (408 kb)
      • I-3 Centrifuge PID Addn 2 Uploaded: 9/27/2024 (356 kb)
  • Addenda
    • Addendum 1 Uploaded: 9/27/2024 (46188 kb)
    • Addendum 2 Uploaded: 9/27/2024 (4376 kb)
  • Specifications
    • Advertisement for Bids Uploaded: 9/27/2024 (2010 kb)
    • Agreement Form Uploaded: 9/27/2024 (3898 kb)
    • Agreement of Surety Uploaded: 9/27/2024 (598 kb)
    • American Iron Steel Provisions Uploaded: 9/27/2024 (8510 kb)
    • American Iron Steel Provisions Continuation Uploaded: 9/27/2024 (8676 kb)
    • Application of Buy America Preference Uploaded: 9/27/2024 (9445 kb)
    • Available Project Information Uploaded: 9/27/2024 (303 kb)
    • BID FORM - ELECTRICAL Uploaded: 9/27/2024 (2271 kb)
    • BID FORM - GENERAL CONSTRUCTION Uploaded: 9/27/2024 (2710 kb)
    • BID FORM - PLUMBING AND HVAC Uploaded: 9/27/2024 (2152 kb)
    • Bid Bond Uploaded: 9/27/2024 (1106 kb)
    • Bid Bond -Added per Addn 1 Uploaded: 9/27/2024 (892 kb)
    • Certificate as to Corporate Principal Uploaded: 9/27/2024 (323 kb)
    • Certification of Contractor Integrity Provisions Uploaded: 9/27/2024 (1269 kb)
    • Certification of Contractor Responsibility Provisions Uploaded: 9/27/2024 (473 kb)
    • Cover and Table of Contents Uploaded: 9/27/2024 (2090 kb)
    • DGS Website Instructions Uploaded: 9/27/2024 (987 kb)
    • Davis Bacon Wage Rate Compliance Form Uploaded: 9/27/2024 (678 kb)
    • Div 01 General Requirements Uploaded: 9/27/2024 (46857 kb)
    • Div 02 Existing Conditions Uploaded: 9/27/2024 (6265 kb)
    • Div 03 Concrete Uploaded: 9/27/2024 (16207 kb)
    • Div 04 Masonry Uploaded: 9/27/2024 (5666 kb)
    • Div 05 Metals Uploaded: 9/27/2024 (8013 kb)
    • Div 06 Wood Plastic Composite Uploaded: 9/27/2024 (3338 kb)
    • Div 07 Thermal Moisture Protection Uploaded: 9/27/2024 (15113 kb)
    • Div 08 Openings Uploaded: 9/27/2024 (15649 kb)
    • Div 09 Finishes Uploaded: 9/27/2024 (16172 kb)
    • Div 10 Specialties Uploaded: 9/27/2024 (3227 kb)
    • Div 22 Plumbing Uploaded: 9/27/2024 (33339 kb)
    • Div 23 HVAC Uploaded: 9/27/2024 (35975 kb)
    • Div 26 Electrical Uploaded: 9/27/2024 (69096 kb)
    • Div 31 Earthwork Uploaded: 9/27/2024 (19310 kb)
    • Div 32 Exterior Improvements Uploaded: 9/27/2024 (5225 kb)
    • Div 33 Utilities Uploaded: 9/27/2024 (11985 kb)
    • Div 40 Process Integration Uploaded: 9/27/2024 (71238 kb)
    • Div 41 Material Processing Handling Equipment Uploaded: 9/27/2024 (7689 kb)
    • Div 43 Process Gas Liquid Handling Purification Storage Equip Uploaded: 9/27/2024 (4545 kb)
    • Div 46 Water Wastewater Equipment Uploaded: 9/27/2024 (24208 kb)
    • Final Release Waiver of Lien Uploaded: 9/27/2024 (869 kb)
    • General Conditions Uploaded: 9/27/2024 (46471 kb)
    • Geotechnical Report Uploaded: 9/27/2024 (9054 kb)
    • Instructions to Bidders Uploaded: 9/27/2024 (6875 kb)
    • PA 18 Wage Rates -Added per Addn 1 Uploaded: 9/27/2024 (145 kb)
    • Partial Waiver of Lien Uploaded: 9/27/2024 (543 kb)
    • Payment Bond Uploaded: 9/27/2024 (2025 kb)
    • Performance Bond Uploaded: 9/27/2024 (1748 kb)
    • ST-1 Steel Origin Certification Uploaded: 9/27/2024 (1437 kb)
    • ST-2 Steel Origin Certification Uploaded: 9/27/2024 (1536 kb)
    • Solicitation of DBE Firms Uploaded: 9/27/2024 (10863 kb)
    • Supplementary Conditions Uploaded: 9/27/2024 (9514 kb)
    • Supplementary Conditions - Added per Addn 1 Uploaded: 9/27/2024 (9326 kb)
    • Supplementary Conditions Attachments Uploaded: 9/27/2024 (334 kb)
    • _Combined Specifications Uploaded: 9/27/2024 (547858 kb)

Project Info

Project # 24-033
Project Name GC - Danville WWTP Dewatering Upgrades
Location Danville Municipal Authority
Address Map It 200 Northumberland Street
City Danville
State PA
Zip 17821
Bid Date November 6, 2024
Bid Time 5:00 PM
 
Scope

Description of Project:

This project consists of multiple work scopes for all of the work necessary for the Danville Authority Sludge Dewatering Improvements project.  This work includes, but is not limited to:  miscellaneous demolition work, miscellaneous site work, demolition of existing sludge dewatering building and construction of new building, provide new centrifuge, prove new screw conveyor, provide new liquid polymer system, provide new drying area, provide temporary dewatering system, provide miscellaneous demo work and and new pumps and piping in the digester building, provide PMCS system and associated control panels, fiber optic cabinets and instrumentation.

 
WE ARE REQUESTING BIDS FOR:

DIVISION 2  Existing Conditions
024100  Demolition
024113  Selective Site Demolition

DIVISION 3   CONCRETE

031000  Concrete Formwork
032000  Concrete Reinforcement
033000  Cast-In-Place Concrete
036000  Grouting

DIVISION 4   MASONRY
040511  Mortar and Masonry Grout
042000  Unit Masonry

DIVISION 5   METALS
055000  Metal Fabrications
055133  Metal Ladder
055200  Metal Railings

DIVISION 6   WOODS, PLASTICS, AND COMPOSITES
061000  Rough Carpentry
061753  Shop Fabricated Wood Trusses
 
DIVISION 7   THERMAL AND MOISTURE PROTECTION
072100  Thermal Insulation
072500  Weather Barriers
074113  Metal Roof Panels
075300  Elastomeric Membrane Roofing
076200  Sheet Metal Flashing and Trim
077100  Roof Specialties
077123  Manufactured Gutters and Downspouts
077200  Roof Accessories
078400  Firestopping
079200  Joint Sealers
 
DIVISION 8   OPENINGS
081116  Aluminum Doors and Frames
081213  Hollow Metal Frames
083323  Overhead Coiling Doors
085113  Aluminum Windows
087100  Door Hardware
088000  Glazing
089100  Louvers

DIVISION 9  FINISHES 
092116  Gypsum Board Assemblies
099600  High Performance Coatings
099635  Chemical Resistant Coatings
099670  Intumescent Paints
 
DIVISION 10  SPECIALTIES
104400  Fire Protection Specialties
107119  Flood Barriers

DIVISION 31 Earthwork
310000  Site Clearing
312213  Rough Grading
312216.13  Roadway Subgrade
312219  Finish Grading
312300  Excavation and Fill
312333  Trenching and Backfill
315000  Excavation Support and Protection

DIVISION 32 EXTERIOR IMPROVEMENTS
321000  Base Ballasts and Pavements
323113  Chain Link Fence and Gates
329219  Seeding

DIVISION 33  UTILITIES
330561  Concrete Manholes
333119  Gravity Wastewater Piping
337119  Electrical Underground Ducts and Manholes

DIVISION 40  PROCESS INTEGRATION

DIVISION 41  MATERIAL PROCESSING AND HANDLING EQUIPMENT
410500  Common Work for Processing and Handling Equipment
411213.36  Screw Bulk Material Conveyors
412200  Cranes and Hoists

DIVISION 43  PROCESS GAS AND LIQUID HANDLING AND STORAGE EQUIPMENT
432313.17  Horizontal Chopper Pumps

DIVISION 46  WATER AND WASTE WATER EQUIPMENT
460500 Common Work for Water and Wastewater Equipment
463333  Polymer Blending and Feed Equipment
463633  Volumetric Blending and Feed Equipment
467633  Dewatering Centrifuge Equipment
467699  Sludge Drying Bed Filtration Media







Plans
Other Info



To receive addendum notices you must select 'YES' to this bid invitation.

Notices

If you are looking for attached files related to a Notice, go back to the Home tab ("Project Files" are on the right side).
Title Created By Created On
GC - Danville WWTP Dewatering Upgrades Valerie Slagle 9/6/2024
Bid Extension Valerie Slagle 9/13/2024
Notice of Addendum 2 and Bid Extension Valerie Slagle 9/27/2024

Estimators

Company Estimator Phone Extension Fax Email
Lobar, Inc. Eric Bowen 717-432-9728 4289 eric.bowen@lobar.com
Lobar, Inc. Matt Ayers 717-432-9728 4209 MattA@lobar.com

If you have project-related questions, please contact your contractor or use the "Submit Question" tab.
If you are having technical difficulties downloading, please email support@pipelinesuite.com or call 949-222-0400.