| Scope |
Addendum No. 1 (20240920)
The proposed work consists of the following major items as further defined in the Proposal Documents: · Furnish, offload, stage and install approximately 10,000-LF of 60" I.D. HDPE Profile-Wall Pipe or 63” O.D. Solid-Wall HDPE Pipe and approximately 10,800-LF of 54” I.D. HDPE Profile-Wall Pipe or 54” O.D. Solid- Wall HDPE Pipe and all Bends; · Furnish and install a reinforced concrete inlet structure and two traveling screens; · Provide associated mobilization, selective demolition, tree removal, trenching, earthwork, backfill, compaction, surface restoration, other restoration; · Remove two City Bridges and other bridges and culverts; · Coordinate utility locations and relocations as necessary; coordinate with Owner and Owner’s Engineer; and furnish and install all other associated meter assemblies, stub turnouts, air and vacuum valve assemblies, valves and valve cans, cleanout assemblies, and appurtenances necessary to provide a complete project ready for irrigation delivery.
The time for substantial completion will commence on October 4, 2024 and end on April 15, 2025. Liquidated damages of $2,000.00 per day for the first ten (10) days and $10,000.00 per day thereafter will be assessed if the contractor fails to achieve substantial completion within the time allowed. Restoration, demobilization from the site, and all closeout and punch-list items are to be completed by April 30, 2025.
Contractors shall use recyclable products to the maximum extent economically feasible in the performance of the contract work.
Disadvantaged Business Enterprises are encouraged to propose on this project. The project and associated Proposal are subject to grant conditions provided in the Proposal Documents.
|