GC - Ingleside WWTP Improvements

Project Files

  • Drawings
    • Civil
      • C-0.01 Exist Conds Pl Uploaded: 10/2/2024 (834 kb)
      • C-1.01 Ppsd Site Pl Uploaded: 10/2/2024 (734 kb)
      • C-1.02 Ppsd Enlgd Site Pl Uploaded: 10/2/2024 (679 kb)
      • C-1.03 Prof Uploaded: 10/2/2024 (298 kb)
      • C-2.01 Pl Elev Uploaded: 10/2/2024 (491 kb)
      • C-2.02 Sect Uploaded: 10/2/2024 (557 kb)
      • C-2.03 ATAD Piping Inbasin Pl Uploaded: 10/2/2024 (512 kb)
      • C-2.04 ATAD Upper Piping Pl Uploaded: 10/2/2024 (480 kb)
      • C-2.05 Equip Bldg PS Pl Uploaded: 10/2/2024 (489 kb)
      • C-2.06 ATAD Piping Rf Pl Uploaded: 10/2/2024 (309 kb)
      • C-2.07 ATAD Piping Sect Uploaded: 10/2/2024 (439 kb)
      • C-2.08 ATAD Piping Sect Uploaded: 10/2/2024 (453 kb)
      • C-2.09 ATAD Piping Sect Uploaded: 10/2/2024 (405 kb)
      • C-3.01 Exist Belt Filter Press Rm Uploaded: 10/2/2024 (411 kb)
      • C-3.02 Exist Sludge Pump Rm Uploaded: 10/2/2024 (320 kb)
      • C-3.03 Exist Sludge Pump Rm Uploaded: 10/2/2024 (386 kb)
      • C-3.04 Exist Sludge Pump Rm Uploaded: 10/2/2024 (360 kb)
      • C-3.05 Exist Sludge Pump Rm Uploaded: 10/2/2024 (395 kb)
      • C-4.01 SBR Digester Basin Uploaded: 10/2/2024 (9266 kb)
      • C-4.02 SBR Basin Aeration Pl Uploaded: 10/2/2024 (6320 kb)
      • C-4.03 SBR Basin Aeration Pl Uploaded: 10/2/2024 (6266 kb)
      • C-4.04 Digester Aeration Pl Uploaded: 10/2/2024 (5255 kb)
      • C-4.05 Digester Aeration Pl Uploaded: 10/2/2024 (5212 kb)
      • C-4.06 SBR Aeration Dtls Uploaded: 10/2/2024 (3661 kb)
      • C-4.07 Digester Aeration Dtls Uploaded: 10/2/2024 (3738 kb)
      • C-4.08 Aeration Dtls Uploaded: 10/2/2024 (4525 kb)
      • C-4.09 Aeration Dtls Uploaded: 10/2/2024 (3496 kb)
      • C-4.10 Aeration Decanter Dtls Uploaded: 10/2/2024 (2730 kb)
      • C-5.01 Typ Dtls Uploaded: 10/2/2024 (485 kb)
      • C-5.02 Typ Dtls Uploaded: 10/2/2024 (445 kb)
      • C-5.03 Typ Dtls Uploaded: 10/2/2024 (559 kb)
      • C-5.04 Typ Dtls Uploaded: 10/2/2024 (420 kb)
      • C-6.01 PCSM Dtls Uploaded: 10/2/2024 (367 kb)
      • C-6.02 PCSM Nts Uploaded: 10/2/2024 (368 kb)
      • C-6.03 PCSM Exist Drng Uploaded: 10/2/2024 (713 kb)
      • C-6.04 PCSM Ppsd Drng Uploaded: 10/2/2024 (1306 kb)
      • C-6.05 Impervious Areas Uploaded: 10/2/2024 (1322 kb)
      • C-7.01 ES Pl Uploaded: 10/2/2024 (1084 kb)
      • C-7.02 ES Dtls Uploaded: 10/2/2024 (670 kb)
      • C-7.03 ES Dtls Uploaded: 10/2/2024 (501 kb)
      • C-7.04 ES Nts Uploaded: 10/2/2024 (639 kb)
      • G-0.01 ES Cvr Sht Uploaded: 10/2/2024 (1635 kb)
      • G-0.01 PCSM Cvr Sht Uploaded: 10/2/2024 (4494 kb)
      • Thumbs Uploaded: 10/2/2024 (204 kb)
    • Mechanical
      • MP-1 Fl Pl Uploaded: 10/2/2024 (614 kb)
      • MP-2 Sch Uploaded: 10/2/2024 (2399 kb)
    • General
      • G-0.01 Cvr Sht Uploaded: 10/2/2024 (1001 kb)
      • G-0.02 Dwg List Ult Uploaded: 10/2/2024 (391 kb)
      • G-0.03 Gen Nts Uploaded: 10/2/2024 (593 kb)
    • Structural
      • S-0.01 Gen Nts Uploaded: 10/2/2024 (574 kb)
      • S-0.02 Gen Dtls Uploaded: 10/2/2024 (397 kb)
      • S-0.03 Geotech Nts Uploaded: 10/2/2024 (424 kb)
      • S-1.01 ATAD Equip Bldg Pl Uploaded: 10/2/2024 (379 kb)
      • S-1.02 ATAD Equip Bldg Elev Uploaded: 10/2/2024 (366 kb)
      • S-1.03 ATAD Equip Bldg Elev Uploaded: 10/2/2024 (329 kb)
      • S-1.04 ATAD Wl Sect Uploaded: 10/2/2024 (503 kb)
      • S-1.05 ATAD Wl Sect Uploaded: 10/2/2024 (396 kb)
      • S-1.06 ATAD Equip Bldg Fnd Pl Uploaded: 10/2/2024 (516 kb)
      • S-1.07 ATAD Equip Bldg Fnd Dtls Uploaded: 10/2/2024 (384 kb)
      • S-1.08 ATAD Mas Lintel Pl Uploaded: 10/2/2024 (420 kb)
      • S-1.09 ATAD Ctrl Jnt Drng Uploaded: 10/2/2024 (458 kb)
      • S-1.10 ATAD Equip Bldg Rf Frm Pl Uploaded: 10/2/2024 (325 kb)
      • S-1.11 ATAD Equip Bldg Dr Sch Uploaded: 10/2/2024 (332 kb)
      • S-1.12 ATAD Bldg Rm Fin Sch Uploaded: 10/2/2024 (340 kb)
      • S-1.13 ATAD Equip Bldg Win Sch Uploaded: 10/2/2024 (359 kb)
      • S-1.14 Poly Scrubber Fnd Uploaded: 10/2/2024 (345 kb)
      • S-2.01 ATAD Precast Conc Uploaded: 10/2/2024 (364 kb)
      • S-2.02 ATAD Sys Basin Uploaded: 10/2/2024 (293 kb)
      • S-2.03 ATAD Sys Basin Uploaded: 10/2/2024 (334 kb)
      • S-3.01 Exist Ctrl Bldg Uploaded: 10/2/2024 (302 kb)
    • Process
      • D-1.01 Effluent Wtr Diag Uploaded: 10/2/2024 (284 kb)
      • D-1.02 Prcs Flow Diag Uploaded: 10/2/2024 (341 kb)
      • D-1.03 ATAD Prcs Flow Diag 1 of 5 Uploaded: 10/2/2024 (4200 kb)
      • D-1.04 ATAD Prcs Flow Diag 2 of 5 Uploaded: 10/2/2024 (3458 kb)
      • D-1.05 ATAD Prcs Flow Diag 3 of 5 Uploaded: 10/2/2024 (877 kb)
      • D-1.06 ATAD Prcs Flow Diag 4 of 5 Uploaded: 10/2/2024 (7080 kb)
      • D-1.07 ATAD Prcs Flow Diag 5 of 5 Uploaded: 10/2/2024 (3264 kb)
    • Electrical
      • E-0.01 Lgnd Uploaded: 10/2/2024 (503 kb)
      • E-1.01 Site Pl -Demo Uploaded: 10/2/2024 (438 kb)
      • E-1.02 Site Pl - Ppsd Work Uploaded: 10/2/2024 (444 kb)
      • E-1.03 Exist Ofc Bldg - Ppsd Pwr Uploaded: 10/2/2024 (323 kb)
      • E-1.04 Exist Ctrl Bldg - Demo Uploaded: 10/2/2024 (358 kb)
      • E-1.05 Exist Ctrl Bldg - Ppsd Work Uploaded: 10/2/2024 (365 kb)
      • E-1.06 Exist Sludge Bldg Upper Uploaded: 10/2/2024 (617 kb)
      • E-1.07 Exist Sludge Bldg Lower Uploaded: 10/2/2024 (432 kb)
      • E-1.08 Reator Tanks - Pwr Uploaded: 10/2/2024 (445 kb)
      • E-1.09 Equip Bldg A-Ltg Uploaded: 10/2/2024 (479 kb)
      • E-1.10 Equip Bldg A-Pwr Uploaded: 10/2/2024 (709 kb)
      • E-1.11 Equip Bldg B-Ltg Pwr Uploaded: 10/2/2024 (358 kb)
      • E-3.01 Wiring Schem Uploaded: 10/2/2024 (412 kb)
      • E-3.02 Wiring Schem Uploaded: 10/2/2024 (398 kb)
      • E-3.03 Wiring Schem Uploaded: 10/2/2024 (551 kb)
      • E-3.04 Dtls Uploaded: 10/2/2024 (455 kb)
      • E-3.05 Sch Uploaded: 10/2/2024 (468 kb)
      • E-3.06 Sch Uploaded: 10/2/2024 (361 kb)
      • E-3.07 One-Line Riser Diag Uploaded: 10/2/2024 (452 kb)
    • _Combined Drawings Uploaded: 10/2/2024 (233490 kb)
  • Addenda
    • Addendum 1 Uploaded: 10/11/2024 (1266 kb)
  • Specifications
    • 2004 Geotechnical Report Uploaded: 9/25/2024 (16932 kb)
    • 2024 Geotechnical Report Uploaded: 9/25/2024 (5349 kb)
    • Acceptance of Final Payment General Release Uploaded: 9/25/2024 (196 kb)
    • Advertisement for Bids Uploaded: 9/25/2024 (245 kb)
    • Agreement Between Owner Contractor - Electrical Uploaded: 9/25/2024 (332 kb)
    • Agreement Between Owner Contractor - General Uploaded: 9/25/2024 (333 kb)
    • BID FORM - Electrical Uploaded: 9/25/2024 (461 kb)
    • BID FORM - General Uploaded: 9/25/2024 (411 kb)
    • Bid Bond Uploaded: 9/25/2024 (228 kb)
    • Bidder Certification Regarding the Use of Am Iron Steel Products Uploaded: 9/25/2024 (256 kb)
    • Build America Buy America Contractor Agreement Uploaded: 9/25/2024 (250 kb)
    • Build America Buy America Guidence Documents Uploaded: 9/25/2024 (1035 kb)
    • Cert Regarding Debarment-Suspension-Ineligibility Uploaded: 9/25/2024 (223 kb)
    • Cert of Contracts Grants Loans Uploaded: 9/25/2024 (193 kb)
    • Cert of Non-Segregated Facilities Illegal Alien Labor Uploaded: 9/25/2024 (230 kb)
    • Certificate of Substantial Completion Uploaded: 9/25/2024 (238 kb)
    • Change Order Uploaded: 9/25/2024 (240 kb)
    • Compliance Statement EEO Exec. Order 11246 Uploaded: 9/25/2024 (211 kb)
    • Contractors Application for Payment Uploaded: 9/25/2024 (485 kb)
    • County Conservation District Soil ES Control Plan Approval Uploaded: 9/25/2024 (216 kb)
    • DBE - Contract Procurement Breakdown Uploaded: 9/25/2024 (461 kb)
    • DBE Solicitation Supplemental Instructions from DEP Uploaded: 9/25/2024 (641 kb)
    • Davis Bacon Wage Rates Building Uploaded: 9/25/2024 (3014 kb)
    • Davis Bacon Wage Rates Heavy Sewer-Water Treatment Plant Uploaded: 9/25/2024 (7296 kb)
    • Div 01 General Requirements Uploaded: 9/25/2024 (1307 kb)
    • Div 02 Existing Conditions Uploaded: 9/25/2024 (237 kb)
    • Div 03 Concrete Uploaded: 9/25/2024 (1355 kb)
    • Div 04 Masonry Uploaded: 9/25/2024 (274 kb)
    • Div 05 Metals Uploaded: 9/25/2024 (356 kb)
    • Div 06 Carpentry Uploaded: 9/25/2024 (336 kb)
    • Div 07 Thermal Moisture Protection Uploaded: 9/25/2024 (425 kb)
    • Div 08 Openings Uploaded: 9/25/2024 (651 kb)
    • Div 09 Finishes Uploaded: 9/25/2024 (250 kb)
    • Div 10 Specialties Uploaded: 9/25/2024 (245 kb)
    • Div 22 Plumbing Uploaded: 9/25/2024 (519 kb)
    • Div 23 Mechanical Uploaded: 9/25/2024 (315 kb)
    • Div 26 Electrical Uploaded: 9/25/2024 (693 kb)
    • Div 31 Earthwork Uploaded: 9/25/2024 (1453 kb)
    • Div 32 Exterior Improvements Uploaded: 9/25/2024 (848 kb)
    • Div 33 Utilities Uploaded: 9/25/2024 (1281 kb)
    • Div 40 Process Interconnections Uploaded: 9/25/2024 (535 kb)
    • Div 46 Water Wastewater Equipment Uploaded: 9/25/2024 (4595 kb)
    • ES Pollution Control Plan Uploaded: 9/25/2024 (3080 kb)
    • Employee Rights Under the Davis Bacon Act Poster WH-1321 Uploaded: 9/25/2024 (542 kb)
    • Field Order Uploaded: 9/25/2024 (221 kb)
    • Implementation of AIS Provisions 2014 Uploaded: 9/25/2024 (441 kb)
    • Instructions to Bidders Uploaded: 9/25/2024 (630 kb)
    • Non-Collusion Affidavit of Prime Bidder Uploaded: 9/25/2024 (183 kb)
    • Notice of Acceptability of Work Uploaded: 9/25/2024 (254 kb)
    • Notice of Award Uploaded: 9/25/2024 (252 kb)
    • Notice to Proceed Uploaded: 9/25/2024 (268 kb)
    • PA DCNR Scenic Rivers Program dtd 4-1-2024-Requested Actions Uploaded: 9/25/2024 (233 kb)
    • PA DEP-PAG-07 General Permit Permit No. PAG076106 Uploaded: 9/25/2024 (545 kb)
    • PA DEP-Water Quality ManagementWQM Permit Part IIPermit 1169402A-9 Uploaded: 9/25/2024 (564 kb)
    • PENNVEST Funding Offer Uploaded: 9/25/2024 (367 kb)
    • Payment Bond Uploaded: 9/25/2024 (292 kb)
    • Payroll Form WH-347 Instructions for Weekly Certified Payroll Reports Uploaded: 9/25/2024 (609 kb)
    • Performance Bond Uploaded: 9/25/2024 (290 kb)
    • Permits Uploaded: 9/25/2024 (228 kb)
    • Prime Contractor DBE Compliance Satement Uploaded: 9/25/2024 (509 kb)
    • Prime Contractor DBE Solicitation Effort Help Guide Uploaded: 9/25/2024 (5394 kb)
    • Public Works Employment Verification Form Uploaded: 9/25/2024 (306 kb)
    • Qualifications Statement Uploaded: 9/25/2024 (319 kb)
    • Richland Township Post-Construction Stormwater Mgmt Plan Approval Uploaded: 9/25/2024 (375 kb)
    • Standard General Conditions of the Contract Uploaded: 9/25/2024 (903 kb)
    • Supplementary Conditions Uploaded: 9/25/2024 (765 kb)
    • Volume 1 - Table of Contents Uploaded: 9/25/2024 (556 kb)
    • Volume 2 - Table of Contents Uploaded: 9/25/2024 (525 kb)
    • Waiver of Lien Uploaded: 9/25/2024 (220 kb)
    • Warranty Bond Uploaded: 9/25/2024 (311 kb)
    • Work Change Directive Uploaded: 9/25/2024 (242 kb)
    • _Combined Volume 1 Uploaded: 9/25/2024 (28498 kb)
    • _Combined Volume 2 Uploaded: 9/25/2024 (41187 kb)

Project Info

Project # 24-038
Project Name GC - Ingleside WWTP Improvements
Location Windber Area Authority
Address Map It 407 Old Walsall Road , PA 15904
City Johnstown
State PA
Zip 15904
Bid Date October 16, 2024
Bid Time 1:00 PM
 
Scope

This project includes a new Autothermal Thermophilic Aerobic Digestion (ATAD) System, reactor basins, biofilter basin with scrubber, equipment building with pumps, blowers, a drum thickener, drum thickener filtrate pump station, heat exchanger and heat exchanger pumps, and all associated piping, appurtenances, and site work necessary to integrate the new facilities in with the existing WWTP. Also included is the replacement of sludge pumps, the decanter actuator, the effluent water pumping system, fine bubble air diffuser membranes, belt filter press polymer feed system, belt filter press control panel, and upgrades to the SBR plant main control panel.
 
 
Plans
Other Info
We are requesting bids for the following specification sections:

DIVISION 02 – EXISTING CONDITIONS

02 41 19.13 Selective Building Demolition
 
DIVISION 03 – CONCRETE

03 10 00 Concrete Forming and Accessories
03 10 01.00 Concrete Pavement, Walks, and Curbs  
03 10 02.00 Concrete Paving and Walkway Joint Sealants
03 20 00 Concrete Reinforcing     
03 30 00 Cast-In-Place Concrete 
03 31 00 CIP Concrete Base Slab for Precast Post-Tensioned Tank
03 42 00 Precast Post-Tensioned Concrete Tank and Building
03 60 00 Grouting 
 
DIVISION 04 – MASONRY

04 20 00 Concrete Masonry and Core Insulation  
 
DIVISION 05 – METALS

05 00 00  Miscellaneous Metals    
05 12 00 Structural Steel     
 
DIVISION 06 – CARPENTRY

06 10 00 Carpentry Work   
06 74 13 Fiberglass Reinforced Handrails, Gratings & Ladders
 
DIVISION 07 – THERMAL AND MOISTURE PROTECTION

07 10 00 Thermal and Moisture Protection
07 46 33 Plastic Siding 
 
DIVISION 08 – OPENINGS

08 11 13 Entrance Doors, Windows, and Frames 
08 33 23 Overhead Coiling Doors 
08 71 00 Door Hardware     
 
DIVISION 09 – FINISHES

09 91 23 Interior Painting   
 
DIVISION 10 – SPECIALTIES

10 44 16 Fire Extinguishers   
 
DIVISION 22 – PLUMBING

22 00 00 Plumbing Specifications  
22 05 03 Pipes and Tubes for Plumbing Piping and Equipment
22 10 06 Plumbing Piping Specialties   

DIVISION 23 – MECHANICAL

23 00 15 Basic Requirements for HVAC  
23 31 10 Air Distribution Systems and Accessories
23 33 00  Air Duct Accessories     
23 34 23 HVAC Power Ventilators 
23 82 39 Unit Heaters      
 
DIVISION 31 – EARTHWORK

31 05 13 Soils for Earthwork  
31 05 16 Aggregate for Earthwork  
31 10 00 Site Clearing      
31 23 16 Excavation      
31 23 16.13 Trenching    
31 23 16.26 Rock Removal     
31 23 19 Dewatering   
31 23 23 Fill       
31 25 00 Erosion and Sedimentation Controls 
31 37 16.13 Rip Rap      
 
DIVISION 32 – EXTERIOR IMPROVEMENTS

32 11 23 Aggregate Base Courses    
32 12 16 Asphalt Paving     
32 13 13 Concrete Paving    
32 91 19 Landscape Grading     
32 92 19 Seeding       

DIVISION 33 – UTILITIES

33 01 30.13 Sewer And Manhole Testing   
33 05 05.31 Hydrostatic Testing    
33 05 13.16 Public Manholes and Structures    
33 05 16.13 Precast Concrete Utility Structures  
33 05 26  Utility Identification     
33 31 13 Public Sanitary Utility Sewerage Piping  
33 41 13 Public Storm Utility Drainage Piping   
 
DIVISION 40 – PROCESS INTERCONNECTIONS

40 05 19 Ductile Iron Process Pipe    
40 05 23 Stainless Steel Pipe     
40 05 65 Swing Check, Plug and Gate Valves   
 
DIVISION 46 – WATER AND WASTEWATER EQUIPMENT

46 10 00 Reciprocating Positive Displacement Pumps  
46 11 00 Vertical Turbine Pumps - Wet Pit   
46 11 01 Vertical Turbine Pumps Control Panel  
46 12 00 Magnetic Flow Meter    
46 20 00 Liquid Polymer Blending System  
46 30 00 Rotary Drum Thickener     
46 40 00 Submersible Chopper Pumps   
46 50 00 Autothermal Thermophilic Aerobic Digestion System
46 80 00 Pump Station Control Panel for Rotary Drum Thickener Waste Pump Station 
46 90 00 Variable Speed Packaged Pumping System
46 91 00 SBR Decanter Actuator and Limit Switch Replacements 
46 92 00 Existing SBR System Controls Upgrade 
46 93 00 Belt Filter Press Replacement  
46 94 00 Belt Filter Press Control Panel  
46 95 00 Replacement of Fine Bubble Aeration Diffusers and Piping



Notices

If you are looking for attached files related to a Notice, go back to the Home tab ("Project Files" are on the right side).
Title Created By Created On
Ingleside WWTP Improvements Valerie Slagle 9/25/2024
Notice of Addendum 1 Valerie Slagle 10/11/2024

Estimators

Company Estimator Phone Extension Fax Email
Lobar, Inc Aaron Eichelberger 717-432-9728 AaronE@lobar.com
Lobar, Inc. Eric Bowen 717-432-9728 4289 eric.bowen@lobar.com

If you have project-related questions, please contact your contractor or use the "Submit Question" tab.
If you are having technical difficulties downloading, please email support@pipelinesuite.com or call 949-222-0400.