Fleet Maintenance Facility for Fremont Nebraska

Project Files

  • City of Fremont - Fleet Maint - Drawings.pdf Uploaded: 10/5/2024 (54417 kb)
  • City of Fremont - Fleet Mainte- Specs.pdf Uploaded: 10/5/2024 (20261 kb)
  • Fremont Maintenance Facility - Addenda 01.pdf Uploaded: 10/5/2024 (8367 kb)
  • Fremont Maintenance Facility - Addenda 02.pdf Uploaded: 10/12/2024 (2192 kb)
  • Fremont Maintenance Facility - Addenda 03.pdf Uploaded: 10/15/2024 (732 kb)

Project Info

Project #
Project Name Fleet Maintenance Facility for Fremont Nebraska
Location Fremont NE
Address Map It 643 South Luther Road
City Fremont
State NE
Zip 68025
Bid Date October 15, 2024
Bid Time 1:30 PM
 
Scope
1. The proposed Streets – Parks - Fleet Maintenance Facility will be located at 643 South 
Luther Road in Fremont NE and will consist of two separate buildings. 

a. The maintenance building will consist of a 28,303 square foot pre-engineered metal 
building that will be sub-divided into offices, restrooms, locker rooms, parts room, 
wood shop area, sign shop area, metal fabrication area, and vehicle maintenance 
bays.  The building will utilize interior metal stud framing and interior concrete block 
walls to sub-divide the spaces.  The exterior façade will consist of pre-finished metal 
wall panels with a masonry veneer wainscot and pre-finished metal roof panels. 

b. The vehicle storage building will consist of a 14,400 square foot pre-engineered metal 
building that will be sub-divided into a wash bay and vehicle storage bays. The 
building will utilize interior metal stud framing to sub-divide the spaces. The exterior 
façade will consist of pre-finished metal wall and roof panels. 

1) The vehicle storage building is listed as Alternate No. 1, refer to specification 
Section 01 23 00 – Alternates. 
Plans JEO - Bid Documents for a Stipulated Sum contract may be obtained by download in PDF format from 
JEO's website at jeo.com for a nonrefundable fee of $30.00.

Cheever on-line plan room
Other Info Submit bids to
-bids@cheeverconstruction.com

Schedule:
Immediate start
Project Completion 2/27/2026
LDs of $500.00/day

This project is tax exempt.

No wage scale.




Notices

If you are looking for attached files related to a Notice, go back to the Home tab ("Project Files" are on the right side).
Title Created By Created On
Addendum 002 Issued Brian Clinton 10/12/2024
Addendum 003 Brian Clinton 10/15/2024

If you have project-related questions, please contact your contractor or use the "Submit Question" tab.
If you are having technical difficulties downloading, please email support@pipelinesuite.com or call 949-222-0400.