| Project # |
24126 |
|
Project Name
|
Greensboro ABC Warehouse
|
|
Location
|
|
|
Address
|
Map It
601 Diamond Hill Court
|
|
City
|
Greensboro
|
|
State
|
NC
|
|
Zip
|
27406
|
|
Bid Date
|
November 13, 2024
|
|
Bid Time
|
2:00 PM
|
|
|
| Scope |
55,758 SF warehouse and sales area consisting of replacement of the fire suppression system, redesigned office, breakroom, bathroom facilities, conference room, warehouse staff workstations, relocated EV Chargers, updated landscaping, front sign entry, and an addition under an existing canopy.
Scopes include:
Demolition, CIP, masonry, Steel, bollards, Rough Carpentry/Millwork, Insulation, air barriers, metal wall panels, roofing, gutter/downspouts, doors/frames/hardware, OH doors, storefront, glazing, window film, gypsum assemblies, ACT, resilient flooring, carpet tile, wall coverings, painting, toilet accessories, toilet partitions, fire protection specialties, metal lockers, loading dock equipment, canopies, fire suppression, plumbing, mechanical, electrical, sitework, erosion control, grading, asphalt, exterior concrete, fencing with gates, utilities, and landscaping.
|
| Plans |
|
| Other Info |
|
|