Scope |
Building: 22,398 SF
Start: Early Spring 2025
Termite Treatment, Concrete (Foundation, Slab On Grade), CMU Masonry, Structural & Misc Steel, Rough Carpentry Labor / Materials, Trusses, Plastic Laminate Cabinets, Countertops, Joint Sealants, Rigid Insulation, Metal Roofing, TPO Roofing, Doors, Frames, Finish Hardware, Overhead Roll Up Doors, Storefront, Glass & Glazing, Metal Studs, Insulation, Drywall, Acoustical Ceiling, PVC Panel, Rubber Base, Polished Concrete, Epoxy Flooring, Painting, Toilet Accessories, Fire Extinguishers, Fire Spinklers, Plumbing, HVAC, Electric
|