Lodi Access Center

Project Files

  • 001A210 - OPEN CONCEPT FLOOR PLAN.pdf Uploaded: 11/8/2024 (1237 kb)
  • 22044 Addendum 3.pdf Uploaded: 11/12/2024 (1654 kb)
  • ADD 01.pdf Uploaded: 11/8/2024 (96 kb)
  • Geotech Report.pdf Uploaded: 11/8/2024 (2487 kb)
  • Plans 2.pdf Uploaded: 11/8/2024 (8079 kb)
  • Plans.pdf Uploaded: 11/8/2024 (294528 kb)
  • Specs.pdf Uploaded: 11/8/2024 (8371 kb)

Project Info

Project #
Project Name Lodi Access Center
Location
Address Map It 710 N. SACRAMENTO STREET
City Lodi
State Ca
Zip 95240
Bid Date November 13, 2024
Bid Time 2:00 PM
 
Scope
LODI ACCESS & NAVIGATION CENTER 'SHELTER' IS PROPOSED TO OCCUPY AN EXISTING INDUSTRIAL PROPERTY 
OWNED BY THE CITY WHERE ITS PRIOR USE WAS A PARTIALLY CONDITIONED MECHANICAL AND SHEET METAL 
WELDING FACTORY WAREHOUSE WITH OFFICES.  THE CITY OF LODI PROPOSES TO ALTER, ADAPT, AND CHANGE 
THE USE OF THE EXISTING FACTORY WAREHOUSE & OFFICES (METAL BUILDING)  INTO A 30-DAY AND LONGER R-2 
CONGREGATE RESIDENCE -EMERGENCY HOUSING -WHICH IS A RESIDENTIAL USE WITH DAILY FOOD AND 
PUBLIC SERVICES, INCLUDING 24/7 STAFFIING -THEREFORE A MIXED-USE BUILDING.   A TRAINING PROGRAM WILL
BE OPERATED IN A SEPARATE BUILDING CONNECTED BY SITE AMENTIIES INCLUDING A COVERED WALKWAY. 

THE CITY WILL IMPROVE THE EXISTING BUILDING AND SITE WITH ALTERATIONS, ADDITIONS, NEW INTERIOR & 
EXTERIOR CONSTRUCTION, VOLUNTARY STRUCTURAL UPGRADES, ENERGY COMPLIANCE 2022.  

MAIN-USE:  ALTERATIONS FOR R-2 OCCUPANCY INCLUDE THE WET AREAS FOR MEN'S AND WOMEN'S SHOWERS 
AND TOILET FACILITIES FOR STAFF AND VISITORS. 
  
ACCESSORY USES: OFFICES FOR PUBLIC SERVICES AND GUEST SERVICES, KITCHEN, PUBLIC RESOURCE CENTER

INTERIOR CONSTRUCTION IS ADDING CONGREGATE RESIDENTIAL R-2 (30-DAY AND LONGER) BUNK ROOM WITH 
DAILY FOOD SERVICE FROM COMMERCIAL KITCHEN & DINING (A-2), LAUNDRY SERVICES (B,U), MONITORED 
PERSONAL STORAGE (B,S-2), LOCKERS, AFOREMENTIONED SHOWERS & RESTROOMS AND A DEDICATED MEDICAL 
BED AREA (R-2, B).  THE PROJECT IS USING EXISTING UTILITY CONNECTIONS WITH ADDITION OF GREASE TRAP, 
SEWER LIFT STATION, AND FIRE HYDRANT.  NEW ELECTRICAL SERVICE IS BEING PROVIDED FOR THE ADDITIONAL 
ELECTRICAL DEMAND TO THE SITE.  AN EXISTING TELECOMMUNICSITONS LOT IS SERVICED THROUGH THE 
PROPERTY BY SITE ACESS AND UTILITY EASEMENT RIGHTS.

IN THE FRONT OF THE MAIN SHELTER IS A PUBLIC LOBBY AND MEETING ROOM (A-3) FOR ON-SITE ACTIVITIES AND 
HOSTING GROUPS FROM THE COMMUNITY.  MAIN OPERATIONAL 'ACCESS SERVICES' ARE PROPOSED WITH 
WAITING LOBBY (A-3) FOR INVESTIGATING OR ARRANGING PUBLIC SERVICES BY RESIDENTS AND NON-RESIDENTS.
THESE SERVICES OPEN TO THE PUBLIC DURING DAYTIME HOURS.

THE PROJECT INCLUDES ACCESSORY OFFICES FOR ON-SITE SECURITY, ON-SITE OPERATOR, CITY AND COUNTY 
STAFF, AND THE ROTATING PUBLIC AND PRIVATE CONTINUUM OF CARE PROVIDERS, INCLUDING MEDICAL 
PROFESSIONALS (B).

A NEW ADDITION IS PROPOSED TO BE ATTACHED TO THE EXISTING METAL BUILDING FOR RESIDENT SECURED 
ENTRY, RESIDENT INTAKE/PROCESSING, AND RESTROOMS.  A STRUCTURALLY INDEPENDENT BUT ATTACHED 
CANOPY IS PLANNED OVER A PATIO OUTSIDE THE DINING ROOM. (B, A-3, U)

A NEW EDUCATION & TRAINING BUILDING -(A-3, S-2, U) WILL BE CONSTRUCTED ON THE SITE AND ADJOINED BY 
COVERED WALKWAY.

AFTER THOROUIGH ASSESSMENT OF THE EXISTING CONDITIONS, THE PROJECT PROPOSES TO 'RE-SKIN' THE 
EXISTING METAL STRUCTURAL SHELL WITIH A CONTEMPORARY THERMAL AND MOISTURE BARRIER ENVELOPE IN 
ORDER TO MEET OR EXCEED CALIFRONIA TITLE 24 ENERGY COMPLIANCE.  THE EXISTING STRUCTURAL FRAME IS 
BEING RETAINED AND AUGMENTED AS NECESSARY TO AVOID ADDING MORE THAN 10% VERTICAL LOAD AND 
5% LATERAL LOADS TO ITS EXISTING DESIGIN LIMITS INCLUDING ALLOWANCE FOR WIND AND SESIMIC FORCES.  
NEW COLUMNS AND WALLS WITH FOOTINGS ARE BEING ADDED INSIDE THE METAL FRAME AND SKIN SLAB AREA 
TO SUPPORT NEW COLUMNS, WALLS, AND SHEAR ELEMENTS.

THE ACCESS CENTER IS CURRENTLY OPERATING AT THE SITE AND OPEN 9AM-6PM OPERATING AS TEMPORARY 
OVERNIGHT SHELTER AND DAILY SERVICES.  THE OPERATIONS WILL CONTINUE DURING PHASED CONSTRUCTION.  
THE PROJECT WILL BE DIVIDED AT A MINIMUM INTO 4 PHASES:

PHASE 0 -TEMPORARY OCCUPANCY PERMIT (completed);
PHASE 1 -CMU WALL (NIC -separate permit), OFF-SITE WORK STREET & UTILITIES AND FIRE HYDRANT, SITE ELECTRICAL (NIC -separate permit);
PHASE 2 -TENT POPULATION RELOCATION TO SOUTH PORTION OF SITE & SHELTER BUILDING (NORTH) CONSTRUCTION;
PHASE 3-EDUCATIONBUILDING AND ON-SITE WORK CONTINUATION (SOUTH).  TWO BUILDING PERMITS IN THREE PHASES.
Plans
Other Info

Notices

If you are looking for attached files related to a Notice, go back to the Home tab ("Project Files" are on the right side).
Title Created By Created On
Bid Reminder Bid Reminder Alert 11/8/2024

Estimators

Company Estimator Phone Extension Fax Email
CWS Construction Group CWS Construction Estimating 415-599-6545 estimator@cwsconstructiongroup.com

If you have project-related questions, please contact your contractor or use the "Submit Question" tab.
If you are having technical difficulties downloading, please email support@pipelinesuite.com or call 949-222-0400.