Scope |
The scope of work includes Comprehensive upgrades and renovations to the existing Buck Swank Stadium at Palmyra Area Middle School, existing buildings including Concessions, toilet facilities and 2 storage buildings. Stadium work includes full replacement of the grass playfield, home and away
grandstands, the track and surround fence, all track and field lanes and pits and surrounding property fencing and sidewalks.
Prevailing wages apply (see spec section 007343)
Notice to proceed is anticipated January 10, 2025
Start date is anticipated May 27, 2025
Completion date is anticipated February 13, 2026
***There are Alternates, Allowances & Unit Prices required for this project, please provide separate pricing accordingly. (see spec sections 012100, 012200 & 012300)
***Addendums # 1 thru 4 have already been issued and contains reissued drawings and specs, please be sure to review it and incorporate any changes
Divisions of work include:
Division 02 — Existing Conditions: Selective Demolition
Division 03 — Concrete: Cast in Place Concrete
Division 04 — Masonry: Masonry Cleaning, Concrete Unit Masonry
Division 05 — Metals: Metal Fabrications,
Division 06 — Wood, Plastics, And Composites: Miscellaneous Rough Carpentry, Sheathing
Division 07 — Thermal And Moisture Protection: Thermal Insulation, Weather Barriers, Asphalt Shingles, Standing Seam Metal Roof Panels, Formed Metal Wall & Soffit Panels, Sheet Metal Plasing & Trim, Joint Sealants
Division 08 — Openings: Hollow Metal Frames, Access Doors & Frames, Coiling Counter Doors, Sectioinal Doors, Door Hardware, Louvers & Vents
Division 09 — Finishes: Color Schedule, Non-Structural Metal Framing, Gypsum Board, Resilient Base & Accessories, Resilient Tile Flooring, Resinous Flooring, Impact Resistant Wall Covering, Painting
Division 10 — Specialties: Toilet Compartments, Toilet, Bath, And Laundry Accessories
Division 11 — Equipment: Retractable Stairs, Scoreboards,
Division 12 — Furnishings: Metal Countertops
Division 13 — Special Construction: Tensile Fabric Structure Facade Screening, Grandstands
Division 31 — Earthwork: Site Preparation, Clearing And Grubbing Earthwork (Unclassified) , Trenching, Backfilling & Compacting , Sinkhole Remedial Procedures, Shoring
Division 32 — Exterior Improvements: Unbound Pavement Base Courses, Flexible Pavement, Paving Restoration, Concrete Curbs And Sidewalks, Synthetic Track Surfacing, Site Improvements & Amenities, Basic Site Materials & Methods, Lawns & Grasses, Soils Work & Sod
Division 33 — Utilities: Storm Drainage, Sand Grid Drainage System
|