Scope |
The additions and renovation to accommodate new circulation stairs includes two separate, two-story additions at the back of the existing building as well as partial interior renovations to the existing library. New spaces in the additions include a large open collaboration space, two small group rooms and a stair tower, small group instruction room, small open collaboration space respectively. Generally, the new construction consists of load bearing masonry, steel joists and metal deck, masonry veneer, EPDM membrane roofing, aluminum storefront and curtain wall systems, interior finishes
include carpet, acoustical ceilings and paint.
Prevailing wages apply, see spec section 000900
Project duration is 138 calendar days for substantial completion with 60 calendar days for punchlist and final acceptance.
Divisions of work include:
Division 02 — Existing Conditions: Selective Demolition
Division 03 — Concrete: Cast in Place Concrete, Hydraulic Cement Underlayment
Division 04 — Masonry: Unit Masonry Assemblies, Architectural Precast Concrete
Division 05 — Metals: Metal Fabrications, Metal Stairs, Pipe & Tube Railings
Division 07 — Thermal And Moisture Protection: Thermal Insulation, (EPDM) Roofing, Sheet Metal Flashing & Trim, Through Penetration Firestop Systems, Joint Sealants, Expansion Control
Division 08 — Openings: Hollow Metal Frames, Flush Wood Doors, Aluminum Framed Entrances & Storefronts, Glazed Aluminum Curtain Walls, Tubular Daylight Devices, General Glazing
Division 09 — Finishes: Non-Structural Metal Framing, Metal Suspension Gypsum Board Ceiling System, Gypsum Board, Acoustical Panel Ceilings, Resilient Base & Accessories, Tile Carpeting, Painting, High Performance Coatings
Division 10 — Specialties: Visual Display, Panel Signs
Division 12 — Furnishings: Roller Window Shades
|