Cumberland TWP. Municipal Additions and Renovations

Project Files

  • Addendum 1
    • Specs Only
      • 016000-ProductReq-ADD1-1.pdf Uploaded: 1/8/2025 (84 kb)
      • AgmtAIA-ADD1.pdf Uploaded: 1/8/2025 (300 kb)
    • Drawings Only
      • E001-Schedules-ADD1.pdf Uploaded: 1/8/2025 (951 kb)
      • E011-LightingDemo-ADD1.pdf Uploaded: 1/8/2025 (961 kb)
      • E021-PowerDemo-ADD1.pdf Uploaded: 1/8/2025 (956 kb)
      • E031-TelecomDemo-ADD1.pdf Uploaded: 1/8/2025 (943 kb)
      • E041-FireAlarmDemo-ADD1.pdf Uploaded: 1/8/2025 (943 kb)
      • E051-SecurityDemo-ADD1.pdf Uploaded: 1/8/2025 (945 kb)
      • E111-Lighting-ADD1.pdf Uploaded: 1/8/2025 (1482 kb)
      • E121-Power-ADD1.pdf Uploaded: 1/8/2025 (1469 kb)
      • E131-MechPower-ADD1.pdf Uploaded: 1/8/2025 (1491 kb)
      • E132-Roof-ADD1.pdf Uploaded: 1/8/2025 (909 kb)
      • E141-Telecom-ADD1.pdf Uploaded: 1/8/2025 (1455 kb)
      • E151-FireAlarm-ADD1.pdf Uploaded: 1/8/2025 (1428 kb)
      • E161-Security-ADD1.pdf Uploaded: 1/8/2025 (1432 kb)
      • E200-Site-ADD1.pdf Uploaded: 1/8/2025 (1022 kb)
      • E300-Dtls-ADD1.pdf Uploaded: 1/8/2025 (948 kb)
      • E301-Dtls-ADD1.pdf Uploaded: 1/8/2025 (930 kb)
      • E302-Dtls-ADD1.pdf Uploaded: 1/8/2025 (950 kb)
      • E303-Dtls-ADD1.pdf Uploaded: 1/8/2025 (925 kb)
      • E304-Dtls-ADD1.pdf Uploaded: 1/8/2025 (913 kb)
      • E305-Dtls-ADD1.pdf Uploaded: 1/8/2025 (910 kb)
      • E306-Dtls-ADD1.pdf Uploaded: 1/8/2025 (905 kb)
      • E307-Dtls-ADD1.pdf Uploaded: 1/8/2025 (905 kb)
      • E308-Dtls-ADD1.pdf Uploaded: 1/8/2025 (904 kb)
      • E309-Dtls-ADD1.pdf Uploaded: 1/8/2025 (904 kb)
      • E310-Dtls-ADD1.pdf Uploaded: 1/8/2025 (899 kb)
      • E500-Schedules-ADD1.pdf Uploaded: 1/8/2025 (925 kb)
      • E501-Schedules-ADD1.pdf Uploaded: 1/8/2025 (901 kb)
      • E600-OneLineDiagram-ADD1.pdf Uploaded: 1/8/2025 (897 kb)
    • Addendum 1.pdf Uploaded: 1/8/2025 (13552 kb)
  • Addendum 2
    • Drawings Only
      • 001-G000-Cover-ADD2.pdf Uploaded: 1/16/2025 (761 kb)
    • Specs Only
      • 002-TOC-ADD2.pdf Uploaded: 1/16/2025 (39 kb)
      • 260519-LV PowerCondCables-ADD2.pdf Uploaded: 1/16/2025 (64 kb)
      • 260573-PowerStudies-ADD2.pdf Uploaded: 1/16/2025 (47 kb)
      • 260943.13-NetworkLightingControls-ADD2.pdf Uploaded: 1/16/2025 (108 kb)
    • Addendum 2.pdf Uploaded: 1/16/2025 (1669 kb)
  • Specs
    • Div 23
      • DIV 23.pdf Uploaded: 1/8/2025 (406 kb)
    • Div 03
      • 033000-CastInPlaceConcrete.pdf Uploaded: 1/8/2025 (112 kb)
    • Div 10
      • 101400-Signage.pdf Uploaded: 1/8/2025 (92 kb)
      • 102113.19-PlasticToiletCompartments.pdf Uploaded: 1/8/2025 (88 kb)
      • 102216-ChainLinkPartitions.pdf Uploaded: 1/8/2025 (94 kb)
      • 102239-FoldingPanelPartitions.pdf Uploaded: 1/8/2025 (92 kb)
      • 102240-RelocatedFoldingPartition.pdf Uploaded: 1/8/2025 (88 kb)
      • 102800-ToiletAccessories.pdf Uploaded: 1/8/2025 (124 kb)
      • 104400-FireProtectionSpecialties.pdf Uploaded: 1/8/2025 (87 kb)
      • 105164-PolicePersonnelLockers.pdf Uploaded: 1/8/2025 (95 kb)
      • 105165-PoliceEvidenceLockers.pdf Uploaded: 1/8/2025 (92 kb)
      • 105500-EnvelopeDepository.pdf Uploaded: 1/8/2025 (85 kb)
      • 107500-Flagpoles.pdf Uploaded: 1/8/2025 (89 kb)
    • Div 22
      • DIV 22.pdf Uploaded: 1/8/2025 (460 kb)
    • Div 02
      • 024100-Demo.pdf Uploaded: 1/8/2025 (92 kb)
    • Div 01
      • 011000-Summary.pdf Uploaded: 1/8/2025 (81 kb)
      • 012200-AllowancesAndUnitPrices.pdf Uploaded: 1/8/2025 (70 kb)
      • 012300-Alternates.pdf Uploaded: 1/8/2025 (87 kb)
      • 013000-AdminRequirements.pdf Uploaded: 1/8/2025 (174 kb)
      • 014000-QualityRequirements.pdf Uploaded: 1/8/2025 (94 kb)
      • 014113-RACP.pdf Uploaded: 1/8/2025 (129 kb)
      • 014533-CodeRequiredInspection.pdf Uploaded: 1/8/2025 (100 kb)
      • 015000-TempFacilities.pdf Uploaded: 1/8/2025 (115 kb)
      • 015100-TempUtilities.pdf Uploaded: 1/8/2025 (106 kb)
      • 015713-TempEandS.pdf Uploaded: 1/8/2025 (105 kb)
      • 016000-ProductReq-ADD1.pdf Uploaded: 1/8/2025 (84 kb)
      • 017000-Closeout.pdf Uploaded: 1/8/2025 (128 kb)
      • 017800-CloseoutSubmittals.pdf Uploaded: 1/8/2025 (95 kb)
      • 023100-SubsurfaceInvestigationGeoTech.pdf Uploaded: 1/8/2025 (13420 kb)
    • Div 00
      • 001-Cover.pdf Uploaded: 1/8/2025 (292 kb)
      • 002-TOC.pdf Uploaded: 1/8/2025 (38 kb)
      • 003-AdForBids.pdf Uploaded: 1/8/2025 (31 kb)
      • 004-InstructToBid.pdf Uploaded: 1/8/2025 (422 kb)
      • 005-QstmtAIA.pdf Uploaded: 1/8/2025 (182 kb)
      • 006-BidForm.pdf Uploaded: 1/8/2025 (30 kb)
      • 007-BidBondAIA.pdf Uploaded: 1/8/2025 (178 kb)
      • 008-SubstitutionRequestForm.pdf Uploaded: 1/8/2025 (83 kb)
      • 009-NonCollusionAffidavit.pdf Uploaded: 1/8/2025 (21 kb)
      • 010-AgmtAIA-ADD1.pdf Uploaded: 1/8/2025 (300 kb)
      • 011-PandPBond.pdf Uploaded: 1/8/2025 (438 kb)
      • 012-GenCond.pdf Uploaded: 1/8/2025 (869 kb)
      • 013-PrevailingWages.pdf Uploaded: 1/8/2025 (205 kb)
    • Div 08
      • 081113-HMDoors.pdf Uploaded: 1/8/2025 (81 kb)
      • 083323-CoilingDoor.pdf Uploaded: 1/8/2025 (88 kb)
      • 083454-BulletResistantDoors.pdf Uploaded: 1/8/2025 (93 kb)
      • 083473-SoundCtrlDoorAndWindowAssemblies.pdf Uploaded: 1/8/2025 (97 kb)
      • 083613-SectionalDoors.pdf Uploaded: 1/8/2025 (96 kb)
      • 084313-AlumFramedStorefronts.pdf Uploaded: 1/8/2025 (103 kb)
      • 085653-SecurityWindows.pdf Uploaded: 1/8/2025 (91 kb)
      • 087100-DoorHdw.pdf Uploaded: 1/8/2025 (153 kb)
      • 087113-PowerDoorOps.pdf Uploaded: 1/8/2025 (92 kb)
      • 088000-Glazing.pdf Uploaded: 1/8/2025 (82 kb)
      • 088723-SafetyAndSecurityFilms.pdf Uploaded: 1/8/2025 (88 kb)
      • 089100-Louvers.pdf Uploaded: 1/8/2025 (89 kb)
    • Div 12
      • 122410-WindowShades.pdf Uploaded: 1/8/2025 (92 kb)
      • 124813-WalkOffEntranceCarpet.pdf Uploaded: 1/8/2025 (85 kb)
      • 125510-RestraintBench.pdf Uploaded: 1/8/2025 (86 kb)
    • Div 33
      • 330561-ConcreteManholes.pdf Uploaded: 1/8/2025 (89 kb)
      • 334211-StormwaterGravityPipe.pdf Uploaded: 1/8/2025 (88 kb)
      • 334230-StormwaterDrains.pdf Uploaded: 1/8/2025 (86 kb)
    • Div 32
      • 321123-BaseCourses.pdf Uploaded: 1/8/2025 (90 kb)
      • 321216-AsphaltPaving.pdf Uploaded: 1/8/2025 (86 kb)
      • 321313-ConcretePaving.pdf Uploaded: 1/8/2025 (91 kb)
      • 321723.13-PavementMarkings.pdf Uploaded: 1/8/2025 (91 kb)
      • 323113-FencesAndGates.pdf Uploaded: 1/8/2025 (98 kb)
      • 329219-Seeding.pdf Uploaded: 1/8/2025 (89 kb)
      • 329300-Plants.pdf Uploaded: 1/8/2025 (90 kb)
    • Div 07
      • 071113-Dampproofing.pdf Uploaded: 1/8/2025 (87 kb)
      • 072100-ThermalInsulation.pdf Uploaded: 1/8/2025 (95 kb)
      • 072500-WeatherBarriers.pdf Uploaded: 1/8/2025 (98 kb)
      • 074113-MetalRoofPanels.pdf Uploaded: 1/8/2025 (103 kb)
      • 074213-MetalWallPanels.pdf Uploaded: 1/8/2025 (94 kb)
      • 074600-FiberReinforcedWallSiding.pdf Uploaded: 1/8/2025 (100 kb)
      • 075300-EPDM.pdf Uploaded: 1/8/2025 (99 kb)
      • 076200-SheetMetalFlashing.pdf Uploaded: 1/8/2025 (74 kb)
      • 076220-OutBldRenovations.pdf Uploaded: 1/8/2025 (78 kb)
      • 078400-Firestopping.pdf Uploaded: 1/8/2025 (93 kb)
      • 079200-JointSealants.pdf Uploaded: 1/8/2025 (97 kb)
    • Div 31
      • 311000-SiteClearing.pdf Uploaded: 1/8/2025 (92 kb)
      • 312200-Grading.pdf Uploaded: 1/8/2025 (86 kb)
      • 312316.13-Trenching.pdf Uploaded: 1/8/2025 (97 kb)
      • 312323-FillAndBackfilling.pdf Uploaded: 1/8/2025 (96 kb)
      • 313210-Excavation.pdf Uploaded: 1/8/2025 (96 kb)
      • 313700-Riprap.pdf Uploaded: 1/8/2025 (81 kb)
    • Div 06
      • 061000-RoughCarpentry.pdf Uploaded: 1/8/2025 (96 kb)
      • 064100-ArchWoodCasework.pdf Uploaded: 1/8/2025 (107 kb)
    • Div 28
      • DIV 28.pdf Uploaded: 1/8/2025 (176 kb)
    • Div 05
      • 051200-StructSteelFraming.pdf Uploaded: 1/8/2025 (92 kb)
      • 052100-SteelJoistFraming.pdf Uploaded: 1/8/2025 (87 kb)
      • 053100-SteelDecking.pdf Uploaded: 1/8/2025 (92 kb)
      • 054000-ColdFormedMetalFraming.pdf Uploaded: 1/8/2025 (96 kb)
      • 055000-MetalFab.pdf Uploaded: 1/8/2025 (96 kb)
      • 055213-PipeAndTubeRailings.pdf Uploaded: 1/8/2025 (89 kb)
    • Div 27
      • DIV 27.pdf Uploaded: 1/8/2025 (164 kb)
    • Div 04
      • 042000-UnitMasonry.pdf Uploaded: 1/8/2025 (123 kb)
    • Div 26
      • DIV 26.pdf Uploaded: 1/8/2025 (526 kb)
    • Div 11
      • 113013-ResidentialAppliances.pdf Uploaded: 1/8/2025 (86 kb)
      • 113300-RetractableStairs.pdf Uploaded: 1/8/2025 (88 kb)
    • Div 09
      • 090561-FlooringPrep.pdf Uploaded: 1/8/2025 (97 kb)
      • 092116-GypBoard.pdf Uploaded: 1/8/2025 (105 kb)
      • 095100-AcousticalCeilings.pdf Uploaded: 1/8/2025 (94 kb)
      • 096500-ResilientFlooring.pdf Uploaded: 1/8/2025 (93 kb)
      • 096700-ResinousFlooring.pdf Uploaded: 1/8/2025 (92 kb)
      • 096813-TileCarpeting.pdf Uploaded: 1/8/2025 (88 kb)
      • 098400-AcousticRoomComp.pdf Uploaded: 1/8/2025 (89 kb)
      • 099000-Painting.pdf Uploaded: 1/8/2025 (99 kb)
  • Plans
    • 07 Electrical
      • 045-E001-Schedules-ADD1.pdf Uploaded: 1/8/2025 (951 kb)
      • 046-E011-LightingDemo-ADD1.pdf Uploaded: 1/8/2025 (961 kb)
      • 047-E021-PowerDemo-ADD1.pdf Uploaded: 1/8/2025 (956 kb)
      • 048-E031-TelecomDemo-ADD1.pdf Uploaded: 1/8/2025 (943 kb)
      • 049-E041-FireAlarmDemo-ADD1.pdf Uploaded: 1/8/2025 (943 kb)
      • 050-E051-SecurityDemo-ADD1.pdf Uploaded: 1/8/2025 (945 kb)
      • 051-E111-Lighting-ADD1.pdf Uploaded: 1/8/2025 (1482 kb)
      • 052-E121-Power-ADD1.pdf Uploaded: 1/8/2025 (1469 kb)
      • 053-E131-MechPower-ADD1.pdf Uploaded: 1/8/2025 (1491 kb)
      • 054-E132-Roof-ADD1.pdf Uploaded: 1/8/2025 (909 kb)
      • 055-E141-Telecom-ADD1.pdf Uploaded: 1/8/2025 (1455 kb)
      • 056-E151-FireAlarm-ADD1.pdf Uploaded: 1/8/2025 (1428 kb)
      • 057-E161-Security-ADD1.pdf Uploaded: 1/8/2025 (1432 kb)
      • 058-E200-Site-ADD1.pdf Uploaded: 1/8/2025 (1022 kb)
      • 059-E300-Dtls-ADD1.pdf Uploaded: 1/8/2025 (948 kb)
      • 060-E301-Dtls-ADD1.pdf Uploaded: 1/8/2025 (930 kb)
      • 061-E302-Dtls-ADD1.pdf Uploaded: 1/8/2025 (950 kb)
      • 062-E303-Dtls-ADD1.pdf Uploaded: 1/8/2025 (925 kb)
      • 063-E304-Dtls-ADD1.pdf Uploaded: 1/8/2025 (913 kb)
      • 064-E305-Dtls-ADD1.pdf Uploaded: 1/8/2025 (910 kb)
      • 065-E306-Dtls-ADD1.pdf Uploaded: 1/8/2025 (905 kb)
      • 066-E307-Dtls-ADD1.pdf Uploaded: 1/8/2025 (905 kb)
      • 067-E308-Dtls-ADD1.pdf Uploaded: 1/8/2025 (904 kb)
      • 068-E309-Dtls-ADD1.pdf Uploaded: 1/8/2025 (904 kb)
      • 069-E310-Dtls-ADD1.pdf Uploaded: 1/8/2025 (899 kb)
      • 070-E500-Schedules-ADD1.pdf Uploaded: 1/8/2025 (925 kb)
      • 071-E501-Schedules-ADD1.pdf Uploaded: 1/8/2025 (901 kb)
      • 072-E600-OneLineDiagram-ADD1.pdf Uploaded: 1/8/2025 (897 kb)
    • 02 Civil
      • 073-LD01-Cover.pdf Uploaded: 1/8/2025 (781 kb)
      • 074-LD02-Notes.pdf Uploaded: 1/8/2025 (665 kb)
      • 075-LD03-ExistingCond.pdf Uploaded: 1/8/2025 (1093 kb)
      • 076-LD04-Demo.pdf Uploaded: 1/8/2025 (1073 kb)
      • 077-LD05A-Layout.pdf Uploaded: 1/8/2025 (725 kb)
      • 078-LD05B-Landscaping.pdf Uploaded: 1/8/2025 (1774 kb)
      • 079-LD05C-Lighting.pdf Uploaded: 1/8/2025 (5016 kb)
      • 080-LD05D-LightingDtls.pdf Uploaded: 1/8/2025 (2650 kb)
      • 081-LD05E-LightingDtls.pdf Uploaded: 1/8/2025 (6185 kb)
      • 082-LD05F-LightingDtls.pdf Uploaded: 1/8/2025 (6454 kb)
      • 083-LD06-Grading.pdf Uploaded: 1/8/2025 (1007 kb)
      • 084-LD07-StormwaterEasement.pdf Uploaded: 1/8/2025 (867 kb)
      • 085-LD08-EandS.pdf Uploaded: 1/8/2025 (951 kb)
      • 086-LD09A-Notes.pdf Uploaded: 1/8/2025 (500 kb)
      • 087-LD09B-Dtls.pdf Uploaded: 1/8/2025 (1464 kb)
      • 088-LD09C-Dtls.pdf Uploaded: 1/8/2025 (674 kb)
      • 089-LD10A-PipeProfiles.pdf Uploaded: 1/8/2025 (816 kb)
      • 090-LD11A-Dtls.pdf Uploaded: 1/8/2025 (642 kb)
      • 091-LD11B-Dtls.pdf Uploaded: 1/8/2025 (1524 kb)
      • 092-LD12-PCSMDtls.pdf Uploaded: 1/8/2025 (771 kb)
      • 093-LD13-PCSMDtls.pdf Uploaded: 1/8/2025 (2391 kb)
    • 06 Plumbing
      • 040-P001-Notes.pdf Uploaded: 1/8/2025 (429 kb)
      • 041-P002-Dtls.pdf Uploaded: 1/8/2025 (454 kb)
      • 042-P003-Demo.pdf Uploaded: 1/8/2025 (479 kb)
      • 043-P101-Sanitary.pdf Uploaded: 1/8/2025 (996 kb)
      • 044-P102-WaterAndGas.pdf Uploaded: 1/8/2025 (1015 kb)
    • 01 General
      • 001-G000-Cover.pdf Uploaded: 1/8/2025 (791 kb)
      • 002-G002-GenInfo.pdf Uploaded: 1/8/2025 (200 kb)
      • 003-G003-IntPartitionTypes.pdf Uploaded: 1/8/2025 (282 kb)
      • 004-G100-LifeSafety.pdf Uploaded: 1/8/2025 (882 kb)
      • 005-G101-AccessibilityGraphics.pdf Uploaded: 1/8/2025 (190 kb)
      • 006-G300-3DViews.pdf Uploaded: 1/8/2025 (1645 kb)
    • 05 Mechanical
      • 035-H001-Notes.pdf Uploaded: 1/8/2025 (451 kb)
      • 036-H002-Dtls.pdf Uploaded: 1/8/2025 (443 kb)
      • 037-H003-Demo.pdf Uploaded: 1/8/2025 (481 kb)
      • 038-H101-Floor.pdf Uploaded: 1/8/2025 (1106 kb)
      • 039-H201-Roof.pdf Uploaded: 1/8/2025 (393 kb)
    • 04 Structural
      • 026-S100-GenNotes.pdf Uploaded: 1/8/2025 (207 kb)
      • 027-S101-Foundation.pdf Uploaded: 1/8/2025 (212 kb)
      • 028-S102-RoofFraming.pdf Uploaded: 1/8/2025 (271 kb)
      • 029-S201-Dtls.pdf Uploaded: 1/8/2025 (369 kb)
      • 030-S202-Dtls.pdf Uploaded: 1/8/2025 (285 kb)
      • 031-S203-Dtls.pdf Uploaded: 1/8/2025 (214 kb)
      • 032-S301-FoundationSecs.pdf Uploaded: 1/8/2025 (371 kb)
      • 033-S400-FramingSecs.pdf Uploaded: 1/8/2025 (286 kb)
      • 034-S401-FramingSecs.pdf Uploaded: 1/8/2025 (253 kb)
    • 03 Architectural
      • 007-A051-1stFlDemo.pdf Uploaded: 1/8/2025 (809 kb)
      • 008-A101-1stFl.pdf Uploaded: 1/8/2025 (339 kb)
      • 009-A141-RCP.pdf Uploaded: 1/8/2025 (390 kb)
      • 010-A161-Roof.pdf Uploaded: 1/8/2025 (221 kb)
      • 011-A171-Elevations.pdf Uploaded: 1/8/2025 (507 kb)
      • 012-A172-Millwork.pdf Uploaded: 1/8/2025 (229 kb)
      • 013-A200-ExtElev.pdf Uploaded: 1/8/2025 (1065 kb)
      • 014-A210-AltBld2.pdf Uploaded: 1/8/2025 (1777 kb)
      • 015-A211-AltBld3.pdf Uploaded: 1/8/2025 (807 kb)
      • 016-A212-AltBld4.pdf Uploaded: 1/8/2025 (1805 kb)
      • 017-A213-AltFencing.pdf Uploaded: 1/8/2025 (139 kb)
      • 018-A400-BldSecs.pdf Uploaded: 1/8/2025 (495 kb)
      • 019-A410-WallSecs.pdf Uploaded: 1/8/2025 (548 kb)
      • 020-A411-WallSecs.pdf Uploaded: 1/8/2025 (498 kb)
      • 021-A412-WallSecDtl.pdf Uploaded: 1/8/2025 (298 kb)
      • 022-A420-Dtls.pdf Uploaded: 1/8/2025 (301 kb)
      • 023-A421-Dtls.pdf Uploaded: 1/8/2025 (247 kb)
      • 024-A422-Canopy.pdf Uploaded: 1/8/2025 (423 kb)
      • 025-A500-DoorSchedule.pdf Uploaded: 1/8/2025 (191 kb)
  • Prebid Pics
    • 20250106_084905.jpg Uploaded: 1/22/2025 (178 kb)
    • 20250106_084911.jpg Uploaded: 1/22/2025 (134 kb)
    • 20250106_084914.jpg Uploaded: 1/22/2025 (202 kb)
    • 20250106_084923.jpg Uploaded: 1/22/2025 (153 kb)
    • 20250106_084927.jpg Uploaded: 1/22/2025 (164 kb)
    • 20250106_084930.jpg Uploaded: 1/22/2025 (115 kb)
    • 20250106_085002.jpg Uploaded: 1/22/2025 (208 kb)
    • 20250106_085003.jpg Uploaded: 1/22/2025 (193 kb)
    • 20250106_085006.jpg Uploaded: 1/22/2025 (126 kb)
    • 20250106_085019.jpg Uploaded: 1/22/2025 (233 kb)
    • 20250106_085021.jpg Uploaded: 1/22/2025 (130 kb)
    • 20250106_085034.jpg Uploaded: 1/22/2025 (200 kb)
    • 20250106_085043.jpg Uploaded: 1/22/2025 (218 kb)
    • 20250106_085051.jpg Uploaded: 1/22/2025 (159 kb)
    • 20250106_085053.jpg Uploaded: 1/22/2025 (159 kb)
    • 20250106_085055.jpg Uploaded: 1/22/2025 (160 kb)
    • 20250106_085057.jpg Uploaded: 1/22/2025 (225 kb)
    • 20250106_085110.jpg Uploaded: 1/22/2025 (216 kb)
    • 20250106_085111.jpg Uploaded: 1/22/2025 (204 kb)
    • 20250106_085113.jpg Uploaded: 1/22/2025 (192 kb)
    • 20250106_085114.jpg Uploaded: 1/22/2025 (161 kb)
    • 20250106_085124.jpg Uploaded: 1/22/2025 (204 kb)
    • 20250106_085126.jpg Uploaded: 1/22/2025 (247 kb)
    • 20250106_085128.jpg Uploaded: 1/22/2025 (232 kb)
    • 20250106_085137.jpg Uploaded: 1/22/2025 (133 kb)
    • 20250106_085141.jpg Uploaded: 1/22/2025 (99 kb)
    • 20250106_085148.jpg Uploaded: 1/22/2025 (87 kb)
    • 20250106_085153.jpg Uploaded: 1/22/2025 (175 kb)
    • 20250106_085212.jpg Uploaded: 1/22/2025 (171 kb)
    • 20250106_085216.jpg Uploaded: 1/22/2025 (280 kb)
    • 20250106_085246.jpg Uploaded: 1/22/2025 (199 kb)
    • 20250106_085249.jpg Uploaded: 1/22/2025 (209 kb)
    • 20250106_085253.jpg Uploaded: 1/22/2025 (226 kb)
    • 20250106_085254.jpg Uploaded: 1/22/2025 (202 kb)
    • 20250106_085256.jpg Uploaded: 1/22/2025 (208 kb)
    • 20250106_085258.jpg Uploaded: 1/22/2025 (215 kb)
    • 20250106_085316.jpg Uploaded: 1/22/2025 (194 kb)
    • 20250106_085318.jpg Uploaded: 1/22/2025 (201 kb)
    • 20250106_085328.jpg Uploaded: 1/22/2025 (227 kb)
    • 20250106_085334.jpg Uploaded: 1/22/2025 (188 kb)
    • 20250106_085336.jpg Uploaded: 1/22/2025 (160 kb)
    • 20250106_085337.jpg Uploaded: 1/22/2025 (210 kb)
    • 20250106_085350.jpg Uploaded: 1/22/2025 (127 kb)
    • 20250106_085351.jpg Uploaded: 1/22/2025 (174 kb)
    • 20250106_085352.jpg Uploaded: 1/22/2025 (222 kb)
    • 20250106_085354.jpg Uploaded: 1/22/2025 (201 kb)
    • 20250106_085356.jpg Uploaded: 1/22/2025 (139 kb)
    • 20250106_085357.jpg Uploaded: 1/22/2025 (214 kb)
    • 20250106_085400.jpg Uploaded: 1/22/2025 (194 kb)
    • 20250106_085509.jpg Uploaded: 1/22/2025 (204 kb)
    • 20250106_085515.jpg Uploaded: 1/22/2025 (122 kb)
    • 20250106_085520.jpg Uploaded: 1/22/2025 (174 kb)
    • 20250106_085527.jpg Uploaded: 1/22/2025 (221 kb)
    • 20250106_085533.jpg Uploaded: 1/22/2025 (119 kb)
    • 20250106_085543.jpg Uploaded: 1/22/2025 (201 kb)
    • 20250106_085603.jpg Uploaded: 1/22/2025 (272 kb)
    • 20250106_085617.jpg Uploaded: 1/22/2025 (236 kb)
    • 20250106_085620.jpg Uploaded: 1/22/2025 (271 kb)
    • 20250106_085625.jpg Uploaded: 1/22/2025 (209 kb)
    • 20250106_085642.jpg Uploaded: 1/22/2025 (218 kb)
    • 20250106_085644.jpg Uploaded: 1/22/2025 (231 kb)
    • 20250106_085646.jpg Uploaded: 1/22/2025 (237 kb)
    • 20250106_085655.jpg Uploaded: 1/22/2025 (124 kb)
    • 20250106_085708.jpg Uploaded: 1/22/2025 (74 kb)
    • 20250106_085716.jpg Uploaded: 1/22/2025 (96 kb)
    • 20250106_085723.jpg Uploaded: 1/22/2025 (79 kb)
    • 20250106_085725.jpg Uploaded: 1/22/2025 (102 kb)
    • 20250106_085733.jpg Uploaded: 1/22/2025 (186 kb)
    • 20250106_085748.jpg Uploaded: 1/22/2025 (115 kb)
    • 20250106_085754.jpg Uploaded: 1/22/2025 (153 kb)
    • 20250106_085811.jpg Uploaded: 1/22/2025 (240 kb)
    • 20250106_085814.jpg Uploaded: 1/22/2025 (192 kb)
    • 20250106_085816.jpg Uploaded: 1/22/2025 (245 kb)
    • 20250106_085818.jpg Uploaded: 1/22/2025 (234 kb)
    • 20250106_085823.jpg Uploaded: 1/22/2025 (243 kb)
    • 20250106_085830.jpg Uploaded: 1/22/2025 (116 kb)
    • 20250106_085844.jpg Uploaded: 1/22/2025 (183 kb)
    • 20250106_085854.jpg Uploaded: 1/22/2025 (212 kb)
    • 20250106_085908.jpg Uploaded: 1/22/2025 (195 kb)
  • Addendum 5
    • Sketches Only
      • SK1.pdf Uploaded: 1/30/2025 (712 kb)
      • SK2.pdf Uploaded: 1/30/2025 (1241 kb)
      • SK3.pdf Uploaded: 1/30/2025 (811 kb)
    • Specs Only
      • 003100-AvailableInfo-ADD5.pdf Uploaded: 1/30/2025 (1212 kb)
      • 011000-Summary-ADD5.pdf Uploaded: 1/30/2025 (86 kb)
      • 012200-AllowancesAndUnitPrices-ADD5.pdf Uploaded: 1/30/2025 (73 kb)
      • 012300-Alternates-ADD5.pdf Uploaded: 1/30/2025 (76 kb)
      • 087100-DoorHdw-ADD5.pdf Uploaded: 1/30/2025 (142 kb)
      • TOC-ADD5.pdf Uploaded: 1/30/2025 (39 kb)
    • Drawings Only
      • A051-1stFlDemo-ADD5.pdf Uploaded: 1/30/2025 (24246 kb)
    • Addendum 5.pdf Uploaded: 1/30/2025 (28657 kb)
  • Q and A
    • PennBId QA 1.20.25.pdf Uploaded: 1/21/2025 (99 kb)
    • PennBid QA 1.23.25.pdf Uploaded: 1/23/2025 (112 kb)
    • PennBid QA 1.29.25.pdf Uploaded: 1/30/2025 (89 kb)
  • Addendum 3
    • Specs Only
      • 011000-Summary-ADD3.pdf Uploaded: 1/21/2025 (86 kb)
      • 012300-Alternates-ADD3.pdf Uploaded: 1/21/2025 (68 kb)
      • 015713-TempEandS-ADD3.pdf Uploaded: 1/21/2025 (85 kb)
      • 017000-Closeout-ADD3.pdf Uploaded: 1/21/2025 (115 kb)
      • 075300-ElastomericMembraneRoofing-ADD3.pdf Uploaded: 1/21/2025 (81 kb)
    • Drawings Only
      • A101-1stFl-ADD3.pdf Uploaded: 1/21/2025 (313 kb)
      • E001-Schedules-ADD3.pdf Uploaded: 1/21/2025 (372 kb)
      • E021-PowerDemo-ADD3.pdf Uploaded: 1/21/2025 (376 kb)
      • E111-Lighting-ADD3.pdf Uploaded: 1/21/2025 (923 kb)
      • E121-Power-ADD3.pdf Uploaded: 1/21/2025 (892 kb)
      • E131-MechPower-ADD3.pdf Uploaded: 1/21/2025 (908 kb)
      • E141-Telecomm-ADD3.pdf Uploaded: 1/21/2025 (874 kb)
      • E161-Security-ADD3.pdf Uploaded: 1/21/2025 (851 kb)
      • E200-Site-ADD3.pdf Uploaded: 1/21/2025 (444 kb)
      • E500-Schedules-ADD3.pdf Uploaded: 1/21/2025 (352 kb)
      • E600-OneLineDiagram-ADD3.pdf Uploaded: 1/21/2025 (317 kb)
      • G003-IntPartitionTypes-ADD3.pdf Uploaded: 1/21/2025 (265 kb)
    • Addendum 3.pdf Uploaded: 1/21/2025 (5932 kb)
  • Addendum 4
    • Drawings Only
      • A172-MillworkDtls-ADD4.pdf Uploaded: 1/23/2025 (206 kb)
      • A211-Alternate-ADD4.pdf Uploaded: 1/23/2025 (876 kb)
    • Addendum 4.pdf Uploaded: 1/23/2025 (1412 kb)

Project Info

Project #
Project Name Cumberland TWP. Municipal Additions and Renovations
Location Gettysburg, Pa
Address Map It 1370 Fairfield Road
City Gettysburg
State PA
Zip 17325
Bid Date February 4, 2025
Bid Time 2:00 PM
 
Scope eciConstruction is seeking sub contractors and suppliers for the Cumberland Township Municipal Additions and Renovations project.  See full set of project documents for your complete scope of work.

  • Bids are due on February 4 at 2 pm.  Please submit bids to eciConstruction no later than end of day on Fedruary 3.
  • Anticipated start of project is April of 2025.
  • Anticipated final completion is February 27, 2026.
  • Multi prime - GC, MC, PC, EC
  • Prevailing wages apply
  • Substitutions are to be approved prior to bid and submitted 10 days prior to bid date. If you wish to bid with products not listed in the specs, you must fill out and submit the substitution form as provided in 004325 and explained in 016000.
  • (11) Alternates: See section 012300, please provide pricing for all that apply to your scope. 
  • (5) Unit Prices: See Section 012200, please provide pricing for all that apply to your scope.  All are for the sitework package.
  • RFI's must be submitted 7 days prior to bid date.
Plans
Project documents can be found in the Pipeline planroom for this project.
Other Info
Project contact:

Justin Peachey

717-638-3318
jlp@eciconstruction.com 

Notices

If you are looking for attached files related to a Notice, go back to the Home tab ("Project Files" are on the right side).
Title Created By Created On
Addendum 2 Justin Peachey 1/16/2025
Addendum 3 Justin Peachey 1/21/2025
Addendum 4 Justin Peachey 1/23/2025
Addendum 5 Justin Peachey 1/30/2025

If you have project-related questions, please contact your contractor or use the "Submit Question" tab.
If you are having technical difficulties downloading, please email support@pipelinesuite.com or call 949-222-0400.