Description of Project:
Project consists of construction of a new 3 story classroom wing. Upon completion of the new classroom wing a substantial portion of the existing school is to be demolished. Project also includes substantial site improvements (parking lots, underground basins, utility work, etc.)
WE ARE REQUESTING BIDS FOR:
DIVISION 2 EXISTING CONDITIONS 02 41 16 Structure Demolition 02 41 19 Selective Demolition
DIVISION 3 CONCRETE 03 30 00 Cast-In-Place Concrete 03 54 16 Hydraulic Cement Underlayment
DIVISION 4 MASONRY 04 20 00 Unit Masonry 04 70 00 Architectural Precast Concrete
DIVISION 5 METALS 05 12 00 Structural Steel Framing 05 21 00 Steel Joist Framing 05 31 00 Steel Decking 05 40 00 Cold-Formed Metal Framing 05 50 00 Metal Fabrications 05 51 13 Metal Pan Stairs 05 52 13 Pipe & Tube Railings DIVISION 6 WOODS, PLASTICES, AND COMPOSITES 06 10 53 Misc Rough Carpentry 06 16 00 Sheathing 06 40 23 Interior Finish Carpenty DIVISION 7 THERMAL AND MOISTURE PROTECTION 07 11 13 Bituminous Dampproofing 07 14 16 Cold Fluid-Applied Waterproofing 07 21 00 Thermal Insulation 07 21 13 EPS Geofoam 07 21 29 Foamed-In-Place Insulation 07 27 26 Fluid-Applied Membrane Air Barriers 07 42 13.13 Formed Metal Wall Panels 07 42 93 Sheet Metal Soffit 07 53 23 EPDM Roofing 07 62 00 Sheet Metal Flashing and Trim 07 71 00 Roof Specialties 07 72 00 Roof Accessories 07 84 13 Penetration Firestopping 07 84 43 Joint Firestopping 07 92 00 Joint Sealants 07 95 13.13 Interior Expansion Joint Cover Assemblies DIVISION 8 OPENINGS 08 11 13 Hollow Metal Doors & Frames 08 14 16 Flush Wood Doors 08 33 13 Overhead Coiling Doors 08 41 13 Aluminum Framed Entrances & Storefronts 08 44 13 Glazed Aluminum Curtainwalls 08 71 00 Door Hardware 08 80 00 Glazing 08 91 19 Fixed Louvers
DIVISION 9 FINISHES 09 22 16 Non-Structural Metal Framing 09 29 00 Gypsum Board 09 30 00 Tiling 09 51 13 Acoustical Panel Ceilings 09 65 13 Resilient Base and Accessories 09 65 19 Resilient Tile Flooring 09 66 60 Resilient Slip-Resistant Vinyl Flooring 09 67 23 Resinous Flooring 09 68 13 Tile Carpeting 09 91 13 Exterior Painting 09 91 23 Interior Painting 09 96 46 Intumescent Painting DIVISION 10 SPECIALTIES 10 11 00 Visual Display Units 10 12 00 Display Cases 10 14 16 Plaques 10 14 19 Dimensional Signage 10 14 23 Panel Signage 10 26 00 Wall Protection 10 28 00 Toilet Accessories 10 44 13 Fire Protection Cabinets 10 51 13 Metal Lockers 10 56 13 Metal Storage Shelving 10 60 00 Art Room Equipment
DIVISION 11 EQUIPMENT 11 30 13 Residential Appliances 11 51 23 Library Stack Systems DIVISION 12 FURNISHINGS 12 24 13 Roller Window Shades 12 35 50 Manufactured Plastic-Laminate Faced Casework 12 35 53.13 Metal Laboratory Casework 12 36 61 Solid Surface Panels
DIVISION 14 CONVEYING SYSTEMS 14 24 00 Hydraulic Elevators
DIVISION 31 EARTHWORK 31 10 00 Site Clearing 31 20 00 Earth Moving
DIVISION 32 EXTERIOR IMPROVEMENTS
32 11 00 Unbound Pavement Base Courses and Aggregates 32 12 16 Asphalt Paving 32 13 13 Concrete Paving 32 13 73 Concrete Paving Joint Sealants 32 17 26 Tactile Warning Surfacing 32 30 00 Site Improvements and Amenties 32 31 13 Chain Link Fences and Gates 32 92 00 Turf & Grasses 32 93 00 Plants
DIVISION 33 UTILITIES 33 14 11 Facility Water Distribution Piping 33 14 12 Facility Sanitary Sewers 33 41 00 Storm Utility Drainage Piping 33 46 00 Subdrainage
|
Plans |
|
Other Info |
Subcontractors are reminded to review UNIT PRICES, QUANTITY ALLOWANCES, AND ALTERNATE Options. To receive addendum notices you must select 'YES' to this bid invitation.
|
|