Project Info
|
Project # |
25-003 |
Project Name
|
GC - Shinglehouse Borough WWTP Phase II Improvements
|
Location
|
Shinglehouse Borough
|
Address
|
Map It
149 Wolcott Avenue
|
City
|
Shinglehouse
|
State
|
PA
|
Zip
|
16748
|
Bid Date
|
February 19, 2025
|
Bid Time
|
12:00 PM
|
|
|
Scope |
The Project consists of the construction of a new headworks building structure, installation of a grit vortex, construction of a new blower building, chemical feed systems, one (1) new pre-anaerobic tank, one (1) aerobic digestor, two (2) new oxidation ditches, two (2) clarifiers, one (1) WAS/RAS pump station, retrofitting of the existing effluent pump station, rehabilitation of the existing chlorine contact tank.
|
Plans |
|
Other Info |
We are requesting bids for the following specification sections:
DIVISION 02 - EXISTING CONDITIONS
02 41 16 Structure Demolition 02 41 19 Selective Structure Demolition 02 41 19.13 Selective Building Demolition
DIVISION 03-CONCRETE
03 10 00 Concrete Forming And Accessories 03 20 00 Concrete Reinforcing 03 30 00 Cast-ln-Place Concrete 03 35 00 Concrete Finishing 03 39 00 Concrete Curing 03 40 00 Miscellaneous Precast Concrete 03 41 00 Precast Reinforced Concrete Structures 03 41 36 Precast Structural Post-Tensioned Concrete Tankage
DIVISION 04-MASONRY
20 00 Unit Masonry
DIVISION 05-METALS
05 12 00 Structural Steel Framing 05 50 00 Metal Fabrications 05 51 00 Metal Stairs 05 52 00 Metal Railings 05 53 00 Metal Gratings
DIVISION 06 - WOOD. PLASTICS. AND COMPOSITES
06 10 00 Rough Carpentry 06 10 53 Miscellaneous Rough Carpentry 06 16 00 Sheathing 06 17 53 Shop-Fabricated Wood Trusses
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 21 00 Thermal Insulation 07 25 00 Weather Barriers 07 31 13 Asphalt Shingles 07 47 00 Siding 07 62 00 Sheet Metal Flashing and Trim 07 71 00 Roof Specialties 07 92 00 Joint Sealants
DIVISION 08-OPENINGS
08 17 43 FRP/Aluminum Hybrid Doors and Frames 08 33 23 Overhead Coiling Doors 08 39 19 Pedestrian Flood Doors 08 41 00 Flood Barriers 08 51 13 Aluminum Windows 08 71 00 Door Hardware 08 81 00 Glazing 08 90 00 Louvers and Vents 08 91 19 Fixed Louvers
DIVISION 09-FINISHES
09 29 00 Gypsum Board 09 90 00 Painting and Coating 09 91 13 Exterior Painting 09 96 00 High-09 96 00.01 Epoxy Coating High-Performance Coatings DIVISION 10-SPECIALTIES
10 14 00 Signage 10 44 16 Fire Extinguishers DIVISION 12 - FURNISHINGS
12 35 53 Metal Laboratory Cabinets 12 36 53 Laboratory Work Surfaces 12 36 61 Simulated Stone Windowsills
DIVISION 31 - EARTHWORK
31 05 13 Soils for Earthwork 31 05 16 Aggregates for Earthwork 3105 19.13 Geotextiles for Earthwork 31 10 00 Site Clearing 31 22 13 Rough Grading 31 23 00 Excavation and Fill 31 23 16.26 Rock Removal 31 23 19 Dewatering 31 23 23.33 Flowable Fill 31 23 33 Trenching and Backfilling for Utilities 3125 00 Erosion and Sedimentation Controls 3137 00 Riprap 31 40 00 Shoring and Underpinning
DIVISION 32 - EXTERIOR IMPROVEMENTS
32 1123 Aggregate Base Courses 32 12 00 Flexible Paving 32 12 00 Concrete Paving. 32 16 23 Sidewalks 32 31 13 Chain Link Fences and Gates 32 91 13 Soil Preparation 32 92 00 Turf and Grasses
DIVISION 33-UTILITIES
33 01 10.58 Disinfection of Water Utility Piping Systems 33 01 32 Concrete Tank Rehabilitation 33 05 05.31 Hydrostatic Testing 33 05 05.36 Vacuum Testing 33 05 05.41 Air Testing 33 05 05.43 Mandrel Testing 33 05 61 Concrete Manholes 33 14 16 Site Water Utility Distribution Piping 33 14 17 Site Water Service Utility Laterals 33 31 11 Public Sanitary Sewerage Gravity Piping 33 31 23 Sanitary Sewerage Force Main Piping
DIVISION 34 - TRANSPORTATION
34 71 13 Vehicle Barriers
DIVISION 40 - PROCESS INTEGRATION PAGES
40 05 23 Stainless Steel Process Pipe and Tubing 40 05 57 Actuators for Process Valves and Gates 40 05 59.23 Stainless Steel Slide Gates 40 05 61 Gate Valves
40 05 62 Plug Valves 40 05 63 Ball Valves 40 05 64 Butterfly Valves 40 05 65.23 Swing Check Valves 40 05 71.23 Mud Valves 40 05 71.33 Telescoping Valves 40 05 96 Vibration and Seismic Controls for Process Equipment 40 23 23 Potable Water Process Piping 40 05 78.23 Air-Vacuum Valves for Wastewater Service 40 42 13 Process Piping Insulation40 66 13 Switches and Routers 40 66 33 Fiber Optic Communication Systems 40 73 13 Pressure and Differential Pressure Gauges 40 73 63 Diaphragm Seals40 90 00 Primary Process Measuring Devices 40 94 43 Programmable Logic Control Equipment 40 95 13 Process Control Panels and Hardware 40 95 33 Process Control Network Overview 40 95 34 Process Control Network Input/Output List 40 95 35 Process Control Network Computer Equipment
DIVISION 41 - MATERIAL PROCESSING AND HANDLING EQUIPMENT
41 22 00 Crane and Hoists
DIVISION 43 - PROCESS GAS AND LIQUID HANDLING. PURIFICATION. AND STORAGE EQUIPMENT
43 22 53 Packaged Metering Manholes 43 25 13 Overhung Close-Coupled Submersible Centrifugal Pumps
DIVISION 46 - WATER AND WASTEWATER EQUIPMENT
46 05 53 Identification for Water and Wastewater Equipment 46 23 00 Grit Removal and Handling Equipment 46 33 00 Liquid Chemical Feed Equipment 46 43 21 Circular Clarifier Equipment 46 53 61 Oxidation Ditch Equipment 46 69 01 Refrigerated Sampler 46 73 21 Aerobic Digester Aeration Equipment
|
|