Scope |
The project consists of building/structure demolition and a 2-story addition to the existing facility for additional business/office space as well as locker rooms and other common spaces. The scope of work also includes renovations to existing spaces as well as building tie-in and a new exterior facade.
Prevailing wages apply, see spec section 007200
This project requires pricing for Alternates, Allowances and Unit Prices. Please be sure to provide pricing for them according to your scope of work. See sections, 012100, 012200, 012300.
Project duration is 365 calendar days
Anticipated start date is March, 2025
Divisions of work include:
Division 02 — Existing Conditions: Selective Demolition & Alteration Work
Division 03 — Concrete: Cast in Place Concrete
Division 04 — Masonry: Unit Masonry, Masonry Veneer
Division 05 — Metals: Structural Steel Framing, Steel Joist Framing, Steel Decking
Division 06 — Wood, Plastics & Composites: Fire Retardant Wood Treatment and Pressure Treated Wood, Gypsum Sheathing, Finish Carpentry, Cabinetry and Millwork, Plastic Laminate Casework
Division 07 — Thermal And Moisture Protection: Thermal Insulation, EIFS, Weather Barrier, Vapor Retarders, Under-Slab Vapor Barriers, Air Barriers, Fluid Applied Weather Barrier, Metal Wall Panels, (EPDM) Roofing, Sheet Metal Flashing & Trim, Roof Accessories, Joint Sealers
Division 08 — Openings: Hollow Metal Frames, Wood Doors, Access Doors and Frames, Aluminum Framed Storefront & Entrances Thermal, Curtain Wall, Sliding Service Windows, Door Hardware, Hardware Sets, Glazing, Bullet Resistant Acrylic Security Glass
Division 09 — Finishes: USG Drywall Suspension System, Gypsum Drywall, USG Acoustical Panels, USG Ceiling Grid, Resilient Tile Flooring, Resilient Wall Base, Carpet Tile, Acoustical Insulation, Exterior & Interior Painting, High Performance Coatings
Division 10 — Specialties: Signage, Operable Partitions, Total Armor Bullet Resistant Fiberglass, Washroom Accessories, Fire Extinguishers and Cabinets, Lockers, Flagpole
Division 11 — Equipment: Bullet Resistant Deal Tray – Recessed Flat Bottom, Projectors
Division 12 — Furnishings: Countertops, Solid Surfacing Countertops, Entrance Floor Mats and Frames
Division 13 — Special Construction: Fabricated Structures
Division 21 — Fire Supression: Common Work Results of Fire Suppression, Fire Protection Systems
Division 32 — Exterior Improvements: Unit Paving
|