Project Info
|
Project # |
IFB No 202577668 |
Project Name
|
DEN - South Worldport Lot
|
Location
|
Denver International Airport
|
Address
|
|
City
|
|
State
|
|
Zip
|
|
Bid Date
|
March 14, 2025
|
Bid Time
|
5:00 PM
|
Site Meeting Date
|
February 18, 2025
|
Site Meeting Time
|
3:00 PM
|
|
|
Scope |
The project consists of The South Worldport Lot to construct a new surface parking lot that will provide approximately 5,200 parking spaces. The project site exists just south of the existing Worldport Facility between Jackson Gap St and the Pikes Peak Shuttle Lot, at Denver International Airport (DEN). The current condition of the project site is undeveloped farmland. The project proposes to develop this land and provide a new location for the Longs Peak Shuttle Lot in effort to enable the construction of a ConRAC facility. The South Worldport Lot will provide connectivity to Jackson Gap St and the N Elk St.
The construction scope will include, but is not limited to earthwork and grading, stormwater drainage and conveyance infrastructure, concrete paving, construction of shuttle shelters, electrical and lighting infrastructure, electrical vehicle charging infrastructure, water service improvements and hydrants, communications and access control infrastructure, a new signalized intersection, extension asphalt roadway on of N Elk St, widening of Jackson Gap St, signage and pavement marking, erosion and sediment control measures, and existing roadway tie-ins.
Subcontractors Required:
- Survey
- Quality Control
- Traffic Control
- Sustainability Documentation
- Asphalt Milling
- Concrete Crushing
- Excavation
- Erosion Control & Seeding
- Asphalt Pavement
- Concrete Flatwork
- Storm Drainage
- Storm Drainage Structures
- Underdrain
- Fencing & Gates
- Signing & Bollards
- Site Electrical & Communication
- Traffic Signals
- Waterline
- Pavement Markings
- Demo Sawcutting
- Concrete Joint Sealing
- Bus Shelter Installation
- Handrail Install
- Castings
- Hourly Hauling
- Municipal Sweeper
- Pneumatic Hauling
Suppliers Required:
- Concrete Aggregates
- Concrete Admixtures
- Cement
- Fly-Ash
- Aggregate for Earthwork
- Geotextiles
- RCP Pipe
- Pre-Cast Drainage Structures
- PVC Underdrain Pipe
- Paving Accessories
- Ready-Mix & Flow-Fill Concrete
- Pond Outlet Metals
|
Plans |
The plans have been uploaded to the Planroom.
Addendums will be sent out and uploaded as they are recieved.
|
Other Info |
Millstone Weber is requesting quotes by 3/14/2025 to allow time to review quotes & close out the bid. This project is subject to Prevailing Wage, Certified Payroll, ROCIP IV, please have these costs covered in your proposals.
This project has a goal of 20% M/WBE through the City & County of Denver and only firms certified through CCD will be accepted for credit.
The Q&A deadline on this project is 2/26/2025 @ 2PM Local. All Question should be submitted in BidNet.
|
|