Rough and Ready Island Terminal Phase 1A

Project Files

  • 02_Plans
    • CWP-01B Bid Materials.pdf Uploaded: 2/11/2025 (13210 kb)
    • DNM IFB REV 1 030325.pdf Uploaded: 3/20/2025 (19865 kb)
    • Dillon Murphy IFB.pdf Uploaded: 2/11/2025 (17256 kb)
    • HDR IFB REV 1 03102025.pdf Uploaded: 3/20/2025 (32433 kb)
    • HDR IFB.pdf Uploaded: 2/11/2025 (24949 kb)
    • Master Drawing Index.pdf Uploaded: 2/11/2025 (1382 kb)
  • 01_Specifications
    • 1 - Site Access Control.pdf Uploaded: 2/11/2025 (116 kb)
    • 1 - Site Visit Protocol.pdf Uploaded: 2/11/2025 (72 kb)
    • 1 - WI.Process Controls - Respond to a Stockton Soda Bid.PDF Uploaded: 2/11/2025 (655 kb)
    • 1- Instructions to Bidders issued 2.17.25-1.PDF Uploaded: 2/21/2025 (718 kb)
    • 1- Instructions to Bidders.pdf Uploaded: 2/11/2025 (288 kb)
    • 2 - A101-2017 - SSAP Standard Form of Agreement Between Owner and Contractor.pdf Uploaded: 2/11/2025 (730 kb)
    • 2 - A201-2017 SSAP General Conditions of the Contract for Construction.pdf Uploaded: 2/11/2025 (865 kb)
    • 2 - Exhibit G Insurance Requirements.pdf Uploaded: 2/11/2025 (527 kb)
    • 2 - Exhibit H - Lien Waivers.pdf Uploaded: 2/11/2025 (147 kb)
    • 2- A101-2017 - SSAP Standard Form of Agreement Between Owner and Contractor 2.14.25.1-1.pdf Uploaded: 2/21/2025 (732 kb)
    • 2- A201-2017 SSAP General Conditions of the Contract for Construction 2.14.25.1-1.pdf Uploaded: 2/21/2025 (1416 kb)
    • 3 - Specifications.PDF Uploaded: 2/11/2025 (599 kb)
    • 4 - Exhibit A - Construction Areas for CWP-01A and CWP-01B.PDF Uploaded: 2/11/2025 (1207 kb)
    • 4 - Exhibit B - Potential Construction Laydown Area Map.PDF Uploaded: 2/11/2025 (831 kb)
    • 4 - Special Conditions.PDF Uploaded: 2/11/2025 (80 kb)
    • 4882-006acp - Stockton Soda PLA.pdf Uploaded: 2/27/2025 (257 kb)
    • 5 - Project Management Plan PMP.PDF Uploaded: 2/11/2025 (1265 kb)
    • 5 - RRIT Organization Flow Chart and Supplemental Organization Charts.PDF Uploaded: 2/11/2025 (4776 kb)
    • 5 - Risk Opportunity Management ROM.PDF Uploaded: 2/11/2025 (414 kb)
    • 6 - A1 - Global Stability of Infinity Loop T-Wall.PDF Uploaded: 2/11/2025 (2374 kb)
    • 6 - A2 - Railcar Unloading Building Geotechnical Recommendations.PDF Uploaded: 2/11/2025 (264 kb)
    • 6 - Reference A - Geotechnical Engineer-of-Record Report r3.PDF Uploaded: 2/11/2025 (85714 kb)
    • 6 - Reference B - T-Wall Design.PDF Uploaded: 2/11/2025 (1775 kb)
    • Bid Form Quantities and Item Detail-1.xlsx Uploaded: 2/21/2025 (39 kb)
    • CWP01A Bid Sheet Item Details.pdf Uploaded: 2/11/2025 (445 kb)
    • Draft Final SGMP 3rd Submission - Appendix B HASP template.pdf Uploaded: 2/27/2025 (1233 kb)
    • Draft Final SGMP 3rd Submission - Appendix C Import Soil Acceptance Plan.pdf Uploaded: 2/27/2025 (8181 kb)
    • Draft Final SGMP 3rd Submission - Appendix D DCCAMP.pdf Uploaded: 2/27/2025 (5527 kb)
    • Draft Final SGMP 3rd Submission - IFB Appendix A Development Plans.pdf Uploaded: 2/27/2025 (814 kb)
    • Draft Final SGMP 3rd Submission - IFB Appendix E SWPPP.pdf Uploaded: 2/27/2025 (856 kb)
  • 03_Addendum
    • 1- Clarification for Phase 1b CWP-01B.pdf Uploaded: 2/11/2025 (63 kb)
  • Q&A
    • POS WC Soda Ash Export Terminal - Gannett and Fleming Geotechnical Memo_07-03-2020.pdf Uploaded: 2/26/2025 (58655 kb)
    • QA.docx Uploaded: 2/26/2025 (32 kb)
    • Utility Plans sheet.pdf Uploaded: 2/26/2025 (241 kb)
  • CAD
    • Dillion Murphy
      • Complied Survey from 2001
        • COMPILED-Rough and Ready Island NO XREFS.dwg Uploaded: 2/26/2025 (15144 kb)
        • COMPILED-Rough and Ready Island.dwg Uploaded: 2/26/2025 (16746 kb)
      • COS References
        • Pages from Standard_Drawings_2016.pdf Uploaded: 2/26/2025 (207 kb)
      • HDR Drawings
        • 00V-BE05-01 FOR PLAN SET.dwg Uploaded: 2/26/2025 (755 kb)
        • P-Keynotes.dwg Uploaded: 2/26/2025 (549 kb)
        • P-Rail-Layout.dwg Uploaded: 2/26/2025 (1887 kb)
      • Final Drainage 052021
        • P-Drainage-Basins_5_19_21.dwg Uploaded: 2/26/2025 (65443 kb)
      • 10212024
        • 595-00100-210-LAY-001-RO.dwg Uploaded: 2/26/2025 (13310 kb)
      • CAD
        • SBS Logo.jpg Uploaded: 2/26/2025 (25 kb)
      • COS-Caltrans details
        • 3 Pages from Standard_Drawings_2016-2.pdf Uploaded: 2/26/2025 (884 kb)
        • A85.pdf Uploaded: 2/26/2025 (276 kb)
        • COMBINED.pdf Uploaded: 2/26/2025 (767 kb)
        • COS R-41 TRENCH DETAIL.pdf Uploaded: 2/26/2025 (178 kb)
        • COS W-12 THRUST BLOCK.pdf Uploaded: 2/26/2025 (94 kb)
        • COS W-13 FIRE HYDRANT EDITED CLOW 960 WETBARREL.pdf Uploaded: 2/26/2025 (145 kb)
        • COS W-16 FIRE PROTECTION.pdf Uploaded: 2/26/2025 (146 kb)
        • COS W-2 LAYOUT FOR 3 OR LARGER METER BYPASS INSTALATION.pdf Uploaded: 2/26/2025 (74 kb)
        • COS W-3 WATER SERVICE METER.pdf Uploaded: 2/26/2025 (104 kb)
        • COS W-5 ISOLATION OF NEW MAINS 12IN SMALLER .pdf Uploaded: 2/26/2025 (76 kb)
        • D94A.pdf Uploaded: 2/26/2025 (267 kb)
      • DM XREF DWG
        • PROPOSED UTILITIES.dwg Uploaded: 2/26/2025 (532 kb)
        • REVISED-Reclamation District-403 Easement.dwg Uploaded: 2/26/2025 (393 kb)
        • Utility-REV-05142020.dwg Uploaded: 2/26/2025 (886 kb)
      • PDF
        • flows to river.tif Uploaded: 2/26/2025 (116 kb)
      • PlotCfgs
        • AutoCAD PDF General Documentation.pc3 Uploaded: 2/26/2025 (2 kb)
        • AutoCAD PDF Smallest File.pc3 Uploaded: 2/26/2025 (4 kb)
        • DWG To PDF.pc3 Uploaded: 2/26/2025 (2 kb)
        • DillonMurphy.ctb Uploaded: 2/26/2025 (5 kb)
        • DillonMurphyJacobs.ctb Uploaded: 2/26/2025 (5 kb)
      • P-Track-Drainage
        • P-Track-Drainage.dwg Uploaded: 2/26/2025 (3655 kb)
      • XREFS
        • DM CONTOUR SURFACE.dwg Uploaded: 2/26/2025 (30993 kb)
        • RCUB SURFACE.dwg Uploaded: 2/26/2025 (13209 kb)
      • 1 00C001_CIVIL LEGEND.dwg Uploaded: 2/26/2025 (604 kb)
      • 1 00C001_CIVIL LEGEND.txt Uploaded: 2/26/2025 (27 kb)
      • 10 TOPO 00C006.dwg Uploaded: 2/26/2025 (725 kb)
      • 11 TOPO 00C007.dwg Uploaded: 2/26/2025 (726 kb)
      • 12 TOPO 00C008.dwg Uploaded: 2/26/2025 (739 kb)
      • 13 TOPO 00C009.dwg Uploaded: 2/26/2025 (744 kb)
      • 14 TOPO 00C010.dwg Uploaded: 2/26/2025 (743 kb)
      • 15 TOPO 00C011.dwg Uploaded: 2/26/2025 (756 kb)
      • 16 00C003.dwg Uploaded: 2/26/2025 (1512 kb)
      • 17 00C004.dwg Uploaded: 2/26/2025 (1578 kb)
      • 18 00C005.dwg Uploaded: 2/26/2025 (1584 kb)
      • 19 00C006.dwg Uploaded: 2/26/2025 (1558 kb)
      • 2 00C002_CIVIL GENERAL NOTES.dwg Uploaded: 2/26/2025 (521 kb)
      • 20 00C007.dwg Uploaded: 2/26/2025 (1547 kb)
      • 21 00C008.dwg Uploaded: 2/26/2025 (4233 kb)
      • 22 00C009.dwg Uploaded: 2/26/2025 (1549 kb)
      • 23 00C010.dwg Uploaded: 2/26/2025 (1606 kb)
      • 24 00C011.dwg Uploaded: 2/26/2025 (1555 kb)
      • 25 - 27 00C012-14XSECTIONS.dwg Uploaded: 2/26/2025 (74447 kb)
      • 28 00C015_GRADING-RAILCAR UNLOADING BUILDINGTOWERS.dwg Uploaded: 2/26/2025 (1755 kb)
      • 29 00C016_GRADING-RAILCAR UNLOADING BUILDINGTOWERS.dwg Uploaded: 2/26/2025 (1742 kb)
      • 3 15C002_CIVIL GENERAL NOTES.dwg Uploaded: 2/26/2025 (530 kb)
      • 30 01C0XX_FYFFE AVENUE UTILITIES.dwg Uploaded: 2/26/2025 (1716 kb)
      • 31 02C0XX_FYFFE PLANPROF-SS1.dwg Uploaded: 2/26/2025 (21679 kb)
      • 32 04C0XX_FYFFE PLANPROF-GAS2.dwg Uploaded: 2/26/2025 (21648 kb)
      • 33 05C0XX_NORTH OF FYFFE CASINGS.dwg Uploaded: 2/26/2025 (21624 kb)
      • 34 06C0XX_NORTH OF FYFFE PLANPROF-W.dwg Uploaded: 2/26/2025 (21644 kb)
      • 35 07C0XX_NORTH OF FYFFE PLANPROF-SS2.dwg Uploaded: 2/26/2025 (21651 kb)
      • 36 08C0XX_RCUB UTILITIES.dwg Uploaded: 2/26/2025 (1799 kb)
      • 37 09C0XX_RCUB PLANPROF-FW2.dwg Uploaded: 2/26/2025 (21645 kb)
      • 38 10C0XX_RCUB PLANPROF-FW1.dwg Uploaded: 2/26/2025 (21674 kb)
      • 39 11C0XX_RCUB PLANPROF-EXW.dwg Uploaded: 2/26/2025 (21665 kb)
      • 4 00C017_CONSTRUCTION DETAILS.dwg Uploaded: 2/26/2025 (1885 kb)
      • 40 12C0XX_RCUB PLANPROF-SSFM1.dwg Uploaded: 2/26/2025 (21253 kb)
      • 41 13C0XX_TYPICAL CASING DETAIL.dwg Uploaded: 2/26/2025 (1663 kb)
      • 42 ESCP plan 1.dwg Uploaded: 2/26/2025 (1590 kb)
      • 43 ESCP plan 2.dwg Uploaded: 2/26/2025 (1527 kb)
      • 44 ESCP PLAN 3.dwg Uploaded: 2/26/2025 (1509 kb)
      • 45 ESCP DETAILS.dwg Uploaded: 2/26/2025 (1957 kb)
      • 5 14C0XX_CONSTRUCTION DETAILS.dwg Uploaded: 2/26/2025 (735 kb)
      • 6 CONTROL POINTS.dwg Uploaded: 2/26/2025 (9312 kb)
      • 7 TOPO 00C003.dwg Uploaded: 2/26/2025 (697 kb)
      • 8 TOPO 00C004.dwg Uploaded: 2/26/2025 (774 kb)
      • 9 TOPO 00C005.dwg Uploaded: 2/26/2025 (776 kb)
    • P-Rail-Surfaces DWG HDR.dwg Uploaded: 2/26/2025 (30501 kb)
    • P-Site-Access-Roads DWG HDR.dwg Uploaded: 2/26/2025 (3661 kb)
  • Stockton Soda Ash - Non-Disclosure_ Blank.pdf Uploaded: 2/11/2025 (88 kb)

Project Info

Project # W9Y45500
Project Name Rough and Ready Island Terminal Phase 1A
Location Stockton
Address Map It 217 W Fyffe Street, Ste 158
City Stockton
State CA
Zip 95203
Bid Date March 21, 2025
Bid Time 5:00 PM
 
Scope Estimator Information:
Marc Almassy
(916) 208-9339
marc.almassy@gcinc.com

NDA must be signed to view documents

Project Description: Transfer facility at the Port of Stockton.
Includes earthwork, grading, paving, wet utilities, rail and retaining wall.

 


Engineer's Estimate: $ 50,000,000


Quotes Due: Please submit quotes no later than 5PM to give the Estimator time to review.



Plans Provided:
Non-disclosure
Plans 

Specification
Addendums (if issued)

Other Info Quotations will be broken down into comparable packages as reasonably necessary.  Granite will work with interested subcontractors to identify opportunities to break down items into economically feasible packages.

Please call if you need assistance in obtaining bonding, insurance, equipment, materials, and/or supplies. Granite intends to work cooperatively with all qualified firms seeking work on this project.  Granite is an Equal Opportunity Employer.

Requirements:  Granite is signatory to Operating Engineers, Laborers, Teamsters, Cement Masons, and Carpenters Unions.  100% performance and payment bonds required for the full amount of the subcontract price.  Granite may assist with the bond premium up to 2%.  Subcontractors must possess a current contractor’s license, insurance and worker’s compensation insurance coverage meeting Granite’s requirements and will be required to sign the standard Granite Subcontract Agreement.  A copy of the insurance requirements and agreements can be obtained by contacting the Estimator. 

All quotes are subject to the terms of Granite Construction Company’s applicable standard form agreement which is available through the following link: https://www.graniteconstruction.com/ca-resources/standard-agreements

Subcontractors must also be registered with a current DIR number.  (No bid shall be accepted, nor any subcontract entered into without proof of the Subcontractor’s current registration to perform public work pursuant to Section 1725.5.)  
https://www.dir.ca.gov/Public-Works/Contractor-Registration.html

Granite Construction Contacts

Company Contact Title Phone Extension Fax Email
Granite Construction Company Marc Almassy Senior Estimator II 209-234-3569 marc.almassy@gcinc.com

If you have project-related questions, please contact your contractor or use the "Submit Question" tab.