Novato Bus Facility Dispatch and Fuel Island Building Roof Rehabilitation and Building Exterior Improvements

Project Files

  • 0011.pdf Uploaded: 2/13/2025 (144 kb)
  • 03 Contract Drawings Novato Bus Facility Dispatch Fuel Bldg Roof Rehab 2024BT029.pdf Uploaded: 2/13/2025 (2730 kb)
  • 04 Ref Drawings 00-75A Novato Bus Maintenance Facility.pdf Uploaded: 2/13/2025 (44287 kb)
  • 05 Ref Drawings 00-2012BT6-Novato Bus Facility Security Improvements.pdf Uploaded: 2/13/2025 (3866 kb)
  • 06 Ref Drawings 00-2020BT011-Novato Bus Facility Underground Tank.pdf Uploaded: 2/13/2025 (4027 kb)
  • 07 Ref Drawings 1990BT10 AB Novato Bus Lot Imp.pdf Uploaded: 2/13/2025 (775 kb)
  • 08 Ref Drawings 00-96BT7 AB Novato Bus Facility Parking Lot Repair.pdf Uploaded: 2/13/2025 (555 kb)
  • 09 Ref Drawings 00-2004BT8 SAN RAFAEL NOVATO PAVEMENT REHAB full szie.pdf Uploaded: 2/13/2025 (943 kb)
  • 10 Ref Drawings 97BT7 AB Santa Rosa Novato Bus Fac Fuel Tank Replacement SR Bus Fuel Tank Mod-CONFORMED SET.pdf Uploaded: 2/13/2025 (2135 kb)
  • Addendum_1.pdf Uploaded: 2/13/2025 (504 kb)
  • Specs.pdf Uploaded: 2/13/2025 (6814 kb)

Project Info

Project #
Project Name Novato Bus Facility Dispatch and Fuel Island Building Roof Rehabilitation and Building Exterior Improvements
Location 4 Golden Gate Place Novato Marin CA 94945
Address Map It 4 Golden Gate Place
City Novato
State Ca
Zip 94945
Bid Date February 20, 2025
Bid Time 2:00 PM
 
Scope This public works project consists of, in general, roof rehabilitation and building exterior improvements at the District’s Novato Bus Facility Dispatcher and Fuel Island Buildings located at 4 Golden Gate Place, Novato, CA, 94945.

The scope of work includes cleaning and repairing of existing metal decking roof as necessary for installation of Sprayed Polyurethane Foam (SPF) Roofing system including replacement of necessary edge metal, stacks and vents; removing and replacing six (6) existing roof skylights; removing and replacing ten (10) exterior windows; cleaning and preparing exterior walls, overhang soffits, doors including roll-up doors, rain gutters, downspouts, vents and louvers to receive the exterior paint coating system; furnishing and installing a quick connect Generator Connection Switchboard system including all necessary connection to the existing PG&E Main Switchboard, and all other related work items as required to complete the project titled Novato Bus Facility Dispatch and Fuel Island Building Roof Rehabilitation and Building Exterior Improvements, as shown on the Contract Plans and as specified in the Contract Documents.
Plans
Other Info

If you have project-related questions, please contact your contractor or use the "Submit Question" tab.