Morningstar - Kannapolis

Project Files

  • Additional Documents
    • 20250106 - SIA Report_Kannapolis_SIGNED.pdf Uploaded: 2/20/2025 (71412 kb)
    • Mstar Kannapolis Instruction to Bidders.docx Uploaded: 2/20/2025 (52 kb)
    • Preliminary Geotechnical Report.Morningstar Kannapolis.Revised.10-3-24.pdf Uploaded: 2/20/2025 (3253 kb)
  • RFI Responses
    • 2025-02-20 Drive Up Unit Mix v2.pdf Uploaded: 3/6/2025 (1890 kb)
    • 20250218_Morningstar Kannapolis_Master Out.dwg Uploaded: 3/6/2025 (3197 kb)
    • RFI Responses as of March 4th.pdf Uploaded: 3/6/2025 (194 kb)
  • Drawings
    • 20250107 Kannapolis Civil Plans_ SIGNED.pdf Uploaded: 2/20/2025 (71207 kb)
    • 24-427 Electrical Permit Set.pdf Uploaded: 2/20/2025 (12772 kb)
    • 24-427 Mechanical Permit Set.pdf Uploaded: 2/20/2025 (10673 kb)
    • 243833-Morningstar Kannapolis-Architectural.pdf Uploaded: 2/20/2025 (30722 kb)
    • 243833-Mornngstar Kannapolis-General.pdf Uploaded: 2/20/2025 (23536 kb)
    • 24DS-0971 Morningstar Kannapolis Structural.pdf Uploaded: 2/20/2025 (20567 kb)
    • MS Kannapolis Fire Permit Set.pdf Uploaded: 2/20/2025 (2346 kb)
    • MS Kannapolis Plumbing Permit Set.pdf Uploaded: 2/20/2025 (5761 kb)
  • Addenda
    • Addendum 1
      • LAYOUT- MORNINGSTAR - KANNAPOLIS- REV0 02-27-2025.pdf Uploaded: 3/6/2025 (19753 kb)
      • Quote - Morningstar - Kannapolis - Controls - TL72940.pdf Uploaded: 3/6/2025 (88 kb)

Project Info

Project # 25033
Project Name Morningstar - Kannapolis
Location Kannapolis
Address Map It Cold Water Ridge Drive 28083
City Kannapolis
State NC
Zip
Bid Date March 13, 2025
Bid Time 3:00 PM
 
Scope This project consists of a new Storage Facility with a total of 5 buildings and a full site package. The buildings consist of one 3-Story Climate Controlled building and four Storage Buildings. The project scope includes but is not limited to the following:
  • Surveying
  • CIP Concrete
  • Masonry
  • Structural Steel
  • Misc. Steel Fabrications
  • Rough Carpentry
  • Casework
  • Roofing
  • EIFS
  • Waterproofing/Joint Sealants
  • Doors, Frames and Hardware
  • Storefront Assemblies
  • Glazing
  • Automatic Double Sliding Doors
  • Metal Stud Framing
  • GYP Assemblies
  • Acoustical Ceiling Tiles
  • Resilient Flooring
  • Carpet Tile
  • Painting
  • Signage
  • Toilet Accessories
  • Fire Protection
  • Canopies
  • Fire Suppression
  • Plumbing
  • Mechanical
  • Electrical
  • Site Demo
  • Earthwork
  • Erosion Control
  • Asphalt Paving
  • Site Concrete
  • Landscaping
  • Site Fencing
  • Site Utilities
Plans
  • Civil Plans dated 01/07/25
  • Architectural Plans dated 10/07/24
  • General Plans dated 10/07/24
  • Structural Plans dated 01/10/25
  • Mechanical Plans dated 01/09/25
  • Electrical Plans dated 01/09/25
  • Plumbing Plans dated 01/09/25
  • Fire Plans dated 01/09/25
Other Info
  • ITB
  • Geo-Tech Report
  • On Site Stormwater Impact Analysis Report

Notices

If you are looking for attached files related to a Notice, go back to the Home tab ("Project Files" are on the right side).
Title Created By Created On
Bid Day Approaching Dom McIver 3/5/2025
Addendum #1 and Additional RFI Responses Colin Thrun 3/6/2025
Additional RFI Response Regarding Elevator Sump Pumps Colin Thrun 3/12/2025

Estimators

Company Estimator Phone Extension Fax Email
Liles Construction Co., Inc. Colin Thrun 716-604-5434 cthrun@lilesconstruction.com
Liles Construction Co., Inc. Ford Schwing 704-786-3450 fschwing@lilesconstruction.com
Liles Construction Co., Inc. Noah Carlson ncarlson@lilesconstruction.com

If you have project-related questions, please contact your contractor or use the "Submit Question" tab.
If you are having technical difficulties downloading, please email support@pipelinesuite.com or call 949-222-0400.