Project Info
|
Project # |
25018U |
Project Name
|
Carolina Rising Museum (RE-BID)
|
Location
|
|
Address
|
Map It
210 S. Limestone Street
|
City
|
Gaffney
|
State
|
SC
|
Zip
|
|
Bid Date
|
March 10, 2025
|
Bid Time
|
|
|
|
Scope |
THIS IS A RE-BID FOR THE CAROLINA RISING MUSEUM PROJECT IN GAFFNEY, SC. THREE SHEETS HAVE BEEN UPDATED AND ARE INCLUDED IN THE UPDATED PLAN SET IN PLANROOM. SHEETS INCLUDE:
- A9.01 - VERTICAL CIRCULATION PLANS & DETAILS
- A10.01 - DOOR SCHEDULE, HARDWARE SCHEDULE, DOOR LEGEND
- C0.1 - SITE PLAN
The Project consists of the renovation of an existing two-story historic building for use as a new museum. The building is located at 210 N. Limestone Street in Gaffney, SC 29340.
Construction disciplines required for the project include, but are not limited to:
- Site work: Excavation, rough and finish grading, branch utilities, paving.
- Concrete: Cast in place.
- Masonry: Unit masonry repair and restoration where required.
- Metals: Miscellaneous steel and structural repair.
- Wood & Plastics: Casework and custom millwork assemblies. Wood framing and structural wood repair where required
- Thermal & Moisture Protection: Insulation, Damp-proofing, waterproofing, and roof repair where required.
- Doors & Windows: Wooden doors and frames, wooden panel doors, and wooden clad windows with insulating glass.
- Finishes: Gypsum board assemblies, paint, stain
- Specialties: Toilet accessories.
- Equipment: Appliances – provided by Owner, installed by contractor. A/V conduit and equipment installed by contractor.
- Furnishings: As noted on the drawings
- Special Construction: None
- Conveying systems: Wheelchair lift into existing structure.
- Plumbing: Standard ADA
- Mechanical: Package HVAC units
- Electrical: Standard
|
Plans |
|