ST JULIENS CREEK SANITARY SEWER REPLACEMENT

Project Files

  • Amendments
    • 0001
      • Amendment 0001.pdf Uploaded: 4/3/2025 (131 kb)
      • Amendment_0001.pdf Uploaded: 3/20/2025 (131 kb)
      • Attachment 1 - Site Visit Log.pdf Uploaded: 4/3/2025 (85 kb)
      • Attachment_1___Site_Visit_Log.pdf Uploaded: 3/20/2025 (85 kb)
    • 0002
      • Amendment 0002.pdf Uploaded: 4/3/2025 (131 kb)
      • Attachment 1- 25R2577 PPIs.pdf Uploaded: 4/3/2025 (164 kb)
      • Attachment 2 - 03 42 13.00 10.pdf Uploaded: 4/3/2025 (110 kb)
    • 0003
      • Amendment 0003.pdf Uploaded: 4/9/2025 (364 kb)
      • Attachment 1 - 25R2577 Additional PPIs.pdf Uploaded: 4/9/2025 (442 kb)
  • Plans and Specs
    • Attachment_A___SPECS_1727643.pdf Uploaded: 3/13/2025 (3066 kb)
    • Attachment_B___DRAWINGS_1727643.pdf Uploaded: 3/13/2025 (25179 kb)
  • RFIs and PPIs
    • Attachment_D___Pre_Proposal_Inquiry__PPI__Form.xlsx Uploaded: 3/13/2025 (22 kb)
  • RFP and Scope
    • 25R2577_SJCA_Sanitary_Sewer_Corridor_Replacement_General_Requirements 1.pdf Uploaded: 3/13/2025 (161 kb)
    • Attachment_C___Wage_Determination_VA20250161_02282025.pdf Uploaded: 3/13/2025 (51 kb)
    • Attachment_F___PRICE_SCHEDULE_1727643.pdf Uploaded: 3/13/2025 (91 kb)
    • Attachment_H___Additional_Provisions_and_Clauses.pdf Uploaded: 3/13/2025 (196 kb)
    • Building 492 Location.pdf Uploaded: 3/13/2025 (1573 kb)

Project Info

Project # 2514-01
Project Name ST JULIENS CREEK SANITARY SEWER REPLACEMENT
Location ST JULIENS CREEK ANNEX, PORTSMOUTH VA
Address
City
State
Zip
Bid Date April 14, 2025
Bid Time 12:00 PM
Site Meeting Date March 18, 2025
Site Meeting Time 10:00 AM
 
Scope This project involves abandoning approximately 3,000 linear feet of existing sanitary sewer along the water with flowable fill. Existing sanitary manholes will be demolished to 3 feet below existing grade and filled with flowable fill and abandoned in place. Replacement sanitary sewer includes installing approximately 3,700 linear feet of 8‐inch sanitary sewer, 250 linear feet of 6‐inch sanitary sewer, 1,250 linear feet of 4‐inch sanitary lateral and 15 sanitary manholes. Restoration of disturbed areas along the proposed sanitary sewer alignment includes resurfacing, milling and paving of impacted pavement sections and incidental related work
Plans Please find the following in the Pipeline Online Planning Room (PipelineOPR):

-General Requirements
-Scope of Work
-All Documents”
Other Info If you have any questions, please reach out to Adam Mangus - Adam.M@miggov.com, Jose Gutierrez - jose.g@miggov.com , 757-759-6165. Additionally, please submit all quotes to Estimating@miggov.com. Visit miggov.com for more information.

Notices

If you are looking for attached files related to a Notice, go back to the Home tab ("Project Files" are on the right side).
Title Created By Created On
Amendment 1 Amy Fanghella 3/20/2025
Amendment 1 Continued Amy Fanghella 4/3/2025
Amendment 2 Amy Fanghella 4/3/2025
Amendment 3 Amy Fanghella 4/9/2025

If you have project-related questions, please contact your contractor or use the "Submit Question" tab.
If you are having technical difficulties downloading, please email support@pipelinesuite.com or call 949-222-0400.