Mini Storage Depot - Boyer Street

Project Files

  • 01 Drawings
    • Current
      • Mechanical
        • M0.1-MECHANICAL-GENERAL-NOTES-LEGEND-AND-DESIGN-INTENT-Rev.2.pdf Uploaded: 3/17/2025 (601 kb)
        • M0.2-MECHANICAL-SCHEDULES-Rev.2.pdf Uploaded: 3/17/2025 (563 kb)
        • M0.3-MECHANICAL-SCHEDULES-Rev.2.pdf Uploaded: 3/17/2025 (570 kb)
        • M0.4-MECHANICAL-SCHEDULES-Rev.2.pdf Uploaded: 3/17/2025 (562 kb)
        • M1.1-MECHANICAL-OVERALL-PLAN---FINISH-FLOOR-Rev.2.pdf Uploaded: 3/17/2025 (749 kb)
        • M1.2-MECHANICAL-OVERALL-PLAN---SECOND-FLOOR-Rev.2.pdf Uploaded: 3/17/2025 (699 kb)
        • M1.3-MECHANICAL-OVERALL-PLAN---THIRD-FLOOR-Rev.2.pdf Uploaded: 3/17/2025 (695 kb)
        • M5.0-MECHANICAL-DETAILS-Rev.2.pdf Uploaded: 3/17/2025 (646 kb)
      • Structural
        • S0.1-GENERAL-STRUCTURAL-NOTES-Rev.3.pdf Uploaded: 3/17/2025 (370 kb)
        • S0.2-GENERAL-STRUCTURAL-NOTES-Rev.3.pdf Uploaded: 3/17/2025 (373 kb)
        • S0.3-SPECIAL-INSPECTIONS-Rev.3.pdf Uploaded: 3/17/2025 (356 kb)
        • S0.4-SPECIAL-INSPECTIONS-Rev.3.pdf Uploaded: 3/17/2025 (338 kb)
        • S1.1-TYPICAL-DETAILS-Rev.3.pdf Uploaded: 3/17/2025 (383 kb)
        • S1.10-WALL-SCHEDULE-AND-SCHEDULE-AND-DETAILS-Rev.3.pdf Uploaded: 3/17/2025 (478 kb)
        • S1.2-TYPICAL-DETAILS-Rev.3.pdf Uploaded: 3/17/2025 (432 kb)
        • S1.3-TYPICAL-DETAILS-Rev.3.pdf Uploaded: 3/17/2025 (383 kb)
        • S1.4-TYPICAL-DETAILS-Rev.3.pdf Uploaded: 3/17/2025 (365 kb)
        • S1.5-TYPICAL-DETAILS-Rev.3.pdf Uploaded: 3/17/2025 (370 kb)
        • S1.6-TYPICAL-DETAILS-Rev.3.pdf Uploaded: 3/17/2025 (410 kb)
        • S1.7-TYPICAL-DETAILS-Rev.3.pdf Uploaded: 3/17/2025 (371 kb)
        • S1.8-TYPICAL-DETAILS-Rev.3.pdf Uploaded: 3/17/2025 (423 kb)
        • S1.9-SCHEDULE-SHEET-Rev.3.pdf Uploaded: 3/17/2025 (735 kb)
        • S2.1-FOUNDATION-PLAN-Rev.3.pdf Uploaded: 3/17/2025 (431 kb)
        • S3.1-SECOND-FLOOR-FRAMING-PLAN-Rev.3.pdf Uploaded: 3/17/2025 (477 kb)
        • S3.2-SECOND-FLOOR-WALL-PLAN-Rev.3.pdf Uploaded: 3/17/2025 (393 kb)
        • S3.3-THIRD-FLOOR-FRAMING-PLAN-Rev.3.pdf Uploaded: 3/17/2025 (473 kb)
        • S3.4-THIRD-FLOOR-WALL-PLAN-Rev.3.pdf Uploaded: 3/17/2025 (393 kb)
        • S3.5-ROOF-FRAMING-PLAN-Rev.3.pdf Uploaded: 3/17/2025 (552 kb)
        • S4.1-STAIR-DETAILS-Rev.3.pdf Uploaded: 3/17/2025 (367 kb)
        • S5.1-FOUNDATION-DETAILS-Rev.3.pdf Uploaded: 3/17/2025 (454 kb)
        • S5.2-FOUNDATION-DETAILS-Rev.3.pdf Uploaded: 3/17/2025 (376 kb)
        • S6.1-FRAMING-DETAILS-Rev.3.pdf Uploaded: 3/17/2025 (440 kb)
        • S6.2-FRAMING-DETAILS-Rev.3.pdf Uploaded: 3/17/2025 (431 kb)
        • S6.3-FRAMING-DETAILS-Rev.0.pdf Uploaded: 3/17/2025 (335 kb)
        • S6.5-FRAMING-DETAILS-Rev.0.pdf Uploaded: 3/17/2025 (333 kb)
        • S7.1-ROOF-FRAMING-DETAILS-Rev.3.pdf Uploaded: 3/17/2025 (419 kb)
        • S7.2-ROOF-FRAMING-DETAILS-Rev.3.pdf Uploaded: 3/17/2025 (366 kb)
        • S7.3-ROOF-FRAMING-DETAILS-Rev.2.pdf Uploaded: 3/17/2025 (381 kb)
        • S7.5-ROOF-FRAMING-DETAILS-Rev.0.pdf Uploaded: 3/17/2025 (343 kb)
        • S7.6-ROOF-FRAMING-DETAILS-Rev.0.pdf Uploaded: 3/17/2025 (379 kb)
      • Plumbing
        • P0.0-PLUMBING-COVER-SHEET-Rev.2.pdf Uploaded: 3/17/2025 (567 kb)
        • P1.0-PLUMBING-SITE-PLAN-Rev.2.pdf Uploaded: 3/17/2025 (763 kb)
        • P1.1-SANITARY-OVERALL-PLAN---FINISH-FLOOR-Rev.2.pdf Uploaded: 3/17/2025 (660 kb)
        • P1.2-SANITARY-OVERALL-PLAN---SECOND-FLOOR-Rev.2.pdf Uploaded: 3/17/2025 (648 kb)
        • P1.3-SANITARY-OVERALL-PLAN---THIRD-FLOOR-Rev.2.pdf Uploaded: 3/17/2025 (633 kb)
        • P1.4-DOMESTIC-WATER-OVERALL-PLAN---FINISH-Rev.2.pdf Uploaded: 3/17/2025 (628 kb)
        • P1.5-DOMESTIC-WATER-OVERALL-PLAN---SECOND-FLOOR-Rev.2.pdf Uploaded: 3/17/2025 (620 kb)
        • P1.7-PLUMBING-OVERALL-PLAN---ROOF-Rev.2.pdf Uploaded: 3/17/2025 (568 kb)
        • P4.1-PLUMBING-ENLARGED-PLANS---DOMESTIC-WATER-Rev.2.pdf Uploaded: 3/17/2025 (712 kb)
        • P4.2-PLUMBING-ENLARGED-PLANS---SANITARY-Rev.2.pdf Uploaded: 3/17/2025 (780 kb)
        • P5.0-PLUMBING-DETAILS--SCHEDULES-Rev.2.pdf Uploaded: 3/17/2025 (625 kb)
      • Architectural
        • 0G001-COVER-SHEET-Rev.3.pdf Uploaded: 3/17/2025 (13426 kb)
        • 0G002-OCCUPANCY--LIFE-SAFETY-PLANS-Rev.3.pdf Uploaded: 3/17/2025 (457 kb)
        • 0G003-ADA-COMPLIANCE-PLANS-Rev.3.pdf Uploaded: 3/17/2025 (616 kb)
        • 0G004-ADA-COMPLIANCE-PLANS---ENLARGED-VIEWS-Rev.3.pdf Uploaded: 3/17/2025 (478 kb)
        • 0G005-COMCHECK-Rev.3.pdf Uploaded: 3/17/2025 (2082 kb)
        • A002-ARCHITECTURAL-SITE-DETAILS-Rev.2.pdf Uploaded: 3/17/2025 (1006 kb)
        • A101-OVERALL-SLAB-PLAN---FINISH-FLOOR-Rev.3.pdf Uploaded: 3/17/2025 (396 kb)
        • A102-OVERALL-SLAB-PLAN---SECOND-Rev.3.pdf Uploaded: 3/17/2025 (236 kb)
        • A103-OVERALL-SLAB-PLAN--THIRD-FLOOR-Rev.3.pdf Uploaded: 3/17/2025 (200 kb)
        • A104-OVERALL-FLOOR-PLAN---FINISH-FLOOR-Rev.3.pdf Uploaded: 3/17/2025 (302 kb)
        • A105-OVERALL-FLOOR-PLAN---SECOND-FLOOR-Rev.3.pdf Uploaded: 3/17/2025 (285 kb)
        • A106-OVERALL-FLOOR-PLAN---THIRD-FLOOR-Rev.3.pdf Uploaded: 3/17/2025 (280 kb)
        • A107-OVERALL-PLANS-RCP-FINISH-FLOOR-Rev.3.pdf Uploaded: 3/17/2025 (268 kb)
        • A108-OVERALL-PLANS-RCP-SECOND-FLOOR-Rev.3.pdf Uploaded: 3/17/2025 (246 kb)
        • A109-OVERALL-PLAN-RCP-THIRD-FLOOR-Rev.3.pdf Uploaded: 3/17/2025 (263 kb)
        • A110-OVERALL-PLAN--ROOF-PLAN-Rev.3.pdf Uploaded: 3/17/2025 (234 kb)
        • A201-EXTERIOR-ELEVATIONS-Rev.3.pdf Uploaded: 3/17/2025 (782 kb)
        • A202-EXTERIOR-ELEVATIONS-Rev.3.pdf Uploaded: 3/17/2025 (676 kb)
        • A301-BUILDING-SECTIONS-Rev.3.pdf Uploaded: 3/17/2025 (497 kb)
        • A311-WALL-SECTIONS-Rev.3.pdf Uploaded: 3/17/2025 (522 kb)
        • A312-WALL-SECTIONS-Rev.3.pdf Uploaded: 3/17/2025 (481 kb)
        • A313-WALL-SECTIONS-Rev.3.pdf Uploaded: 3/17/2025 (326 kb)
        • A321-WALL-TYPES-Rev.3.pdf Uploaded: 3/17/2025 (4948 kb)
        • A401-ENLARGED-FLOOR-PLANS-Rev.3.pdf Uploaded: 3/17/2025 (353 kb)
        • A402-ENLARGED-FLOOR-AND-DETAILS-Rev.3.pdf Uploaded: 3/17/2025 (265 kb)
        • A403-ENLARGED-PLAN---FINISH-FLOOR---RESTROOMSS-Rev.3.pdf Uploaded: 3/17/2025 (296 kb)
        • A404-ENLARGED-RESTROOM-ELEVATIONS-Rev.3.pdf Uploaded: 3/17/2025 (405 kb)
        • A405-STAIR-PLANS--SECTIONS-Rev.3.pdf Uploaded: 3/17/2025 (457 kb)
        • A406-STAIR-PLANS--SECTIONS-Rev.3.pdf Uploaded: 3/17/2025 (415 kb)
        • A407-ELEVATOR-PLANS-AND-SECTION-Rev.3.pdf Uploaded: 3/17/2025 (353 kb)
        • A501-DETAILS-Rev.3.pdf Uploaded: 3/17/2025 (325 kb)
        • A502-DETAILS-Rev.3.pdf Uploaded: 3/17/2025 (280 kb)
        • A503-DETAILS-Rev.3.pdf Uploaded: 3/17/2025 (231 kb)
        • A601-DOOR-WINDOW--FRAME-DETAILS-Rev.3.pdf Uploaded: 3/17/2025 (205 kb)
        • A602-HEAD-JAMB--SILL-DETAILS-Rev.3.pdf Uploaded: 3/17/2025 (300 kb)
        • A705-OVERALL-FINISH-PLANS-Rev.3.pdf Uploaded: 3/17/2025 (403 kb)
        • A706-OVERALL-FINISHES-PLAN---FINISH-FLOOR-Rev.3.pdf Uploaded: 3/17/2025 (248 kb)
        • A710-FINISHES-SCHEDULE-Rev.3.pdf Uploaded: 3/17/2025 (188 kb)
      • Civil
        • 0CS-COVER-SHEET-Rev.4.pdf Uploaded: 3/17/2025 (1198 kb)
        • C0.00-PROJECT-NOTES-Rev.4.pdf Uploaded: 3/17/2025 (4145 kb)
        • C1.00-EXISTING-CONDITIONS-PLAN-Rev.4.pdf Uploaded: 3/17/2025 (2926 kb)
        • C1.01-DEMOLITION-PLAN-Rev.4.pdf Uploaded: 3/17/2025 (1531 kb)
        • C2.00-SITE-PLAN-Rev.4.pdf Uploaded: 3/17/2025 (1758 kb)
        • C2.01-FIRE-ACCESS-PLAN-Rev.4.pdf Uploaded: 3/17/2025 (2384 kb)
        • C2.02-ADA-ACCESS-AND-RAMP-PLAN-Rev.4.pdf Uploaded: 3/17/2025 (1726 kb)
        • C3.00-GRADING-PLAN-STORM-DRAINAGE-PLAN-Rev.4.pdf Uploaded: 3/17/2025 (1754 kb)
        • C3.01-DRAINAGE-AREA-MAP-Rev.4.pdf Uploaded: 3/17/2025 (1696 kb)
        • C4.00-UTILITY-PLAN-Rev.4.pdf Uploaded: 3/17/2025 (1673 kb)
        • C4.01-UTILITY-PLAN--SEWER-Rev.4.pdf Uploaded: 3/17/2025 (1458 kb)
        • C5.00-PLAN-AND-PROFILE-LINE-OF-SIGHT-Rev.4.pdf Uploaded: 3/17/2025 (1069 kb)
        • C5.00a-PLAN-AND-PROFILE-SEWER-Rev.0.pdf Uploaded: 3/17/2025 (929 kb)
        • C5.01-PLAN-AND-PROFILE-LINE-OF-SIGHT-Rev.4.pdf Uploaded: 3/17/2025 (1025 kb)
        • C5.02-PLAN-AND-PROFILE-Rev.3.pdf Uploaded: 3/17/2025 (1105 kb)
        • C6.00-EROSION-CONTROL-PLAN---STAGE-1-Rev.4.pdf Uploaded: 3/17/2025 (1773 kb)
        • C6.01-EROSION-CONTROL-PLAN---STAGE-2-Rev.4.pdf Uploaded: 3/17/2025 (1696 kb)
        • C6.02-EROSION-CONTROL-PLAN---STAGE-3-Rev.4.pdf Uploaded: 3/17/2025 (1647 kb)
        • C6.03-EROSION-CONTROL-DETAILS-Rev.4.pdf Uploaded: 3/17/2025 (6030 kb)
        • C6.04-EROSION-CONTROL-DETAILS-Rev.4.pdf Uploaded: 3/17/2025 (4697 kb)
        • C6.05-EROSION-CONTROL-DETAILS-Rev.4.pdf Uploaded: 3/17/2025 (1723 kb)
        • C8.00-SITE-DETAILS-Rev.4.pdf Uploaded: 3/17/2025 (4984 kb)
        • C8.01-SITE-DETAILS-Rev.4.pdf Uploaded: 3/17/2025 (3810 kb)
        • C8.02-STORM-DRAINAGE-DETAILS-Rev.1.pdf Uploaded: 3/17/2025 (1483 kb)
        • C8.03-WATER-DETAILS-Rev.4.pdf Uploaded: 3/17/2025 (2635 kb)
        • C8.04-SANITARY-SEWER-DETAILS-Rev.4.pdf Uploaded: 3/17/2025 (1586 kb)
        • C9.00-STORMWATER-CONTROL-A-MEASURE-PLAN-Rev.4.pdf Uploaded: 3/17/2025 (2261 kb)
        • C9.01-STORMWATER-CONTROL-A-MEASURE-DETAILS-Rev.4.pdf Uploaded: 3/17/2025 (1934 kb)
        • C9.02-STORMWATER-CONTROL-A-MEASURE-DETAILS-Rev.4.pdf Uploaded: 3/17/2025 (6797 kb)
        • L5.00-TREE-PROTECTION-PLAN-Rev.2.pdf Uploaded: 3/17/2025 (1990 kb)
        • L5.01-TREE-COMPLIANCE-PLAN-Rev.2.pdf Uploaded: 3/17/2025 (2160 kb)
        • L5.10-REQUIRED-PLANTING-NOTES--DETAILS-Rev.2.pdf Uploaded: 3/17/2025 (3247 kb)
        • POST-POST-DEVELOPMENT-HYDROLOGY-MAP-Rev.0.pdf Uploaded: 3/17/2025 (1783 kb)
        • PRE-PRE-DEVELOPMENT-HYDROLOGY-MAP-Rev.0.pdf Uploaded: 3/17/2025 (1048 kb)
      • Electrical
        • E0.1-ELECTRICAL-GENERAL-NOTES-LEGEND-AND-DESING-INTENT-Rev.2.pdf Uploaded: 3/17/2025 (1090 kb)
        • E1.0-ELECTRICAL-SITE-PLAN-Rev.2.pdf Uploaded: 3/17/2025 (1209 kb)
        • E1.0-PS-ELECTRICAL-SITE-PHOTOMETRIC-PLAN-Rev.2.pdf Uploaded: 3/17/2025 (1207 kb)
        • E1.1-ELECTRICAL-OVERALL-POWER---FINISH-FLOOR-Rev.2.pdf Uploaded: 3/17/2025 (1177 kb)
        • E1.2-ELECTRICAL-OVERALL-POWER-PLAN---SECOND-FLOOR-Rev.2.pdf Uploaded: 3/17/2025 (1122 kb)
        • E1.3-ELECTRICAL-OVERALL-POWER-PLAN---THIRD-FLOOR-Rev.2.pdf Uploaded: 3/17/2025 (1142 kb)
        • E1.4-ELECTRICAL-OVERALL-LIGHTING-PLAN---FINISH-FLOOR-Rev.2.pdf Uploaded: 3/17/2025 (1258 kb)
        • E1.5-ELECTRICAL-OVERALL-LIGHTING-PLAN---SECOND-FLOOR-Rev.2.pdf Uploaded: 3/17/2025 (1201 kb)
        • E1.6-ELECTRICAL-OVERALL-LIGHTING-PLAN---THIRD-FLOOR-Rev.2.pdf Uploaded: 3/17/2025 (1237 kb)
        • E1.7-ELECTRICAL-OFFICE-ENLARGED-FLR. POWER--LIGHTING-Rev.0.pdf Uploaded: 3/17/2025 (157 kb)
        • E2.1-ELECTRICAL-GROUND-FLOOR-NORMAL-PM.-PLAN-Rev.2.pdf Uploaded: 3/17/2025 (1109 kb)
        • E2.2-ELECTRICAL-SECOND-FLOOR-NORMAL-PM.-PLAN-Rev.2.pdf Uploaded: 3/17/2025 (1094 kb)
        • E2.3-ELECTRICAL-THIRD-FLOOR-NORMAL-PM.-PLAN-Rev.2.pdf Uploaded: 3/17/2025 (1099 kb)
        • E2.4-ELECTRICAL-GROUND-FLOOR-EMERGENCY-PM.-PLAN-Rev.2.pdf Uploaded: 3/17/2025 (1107 kb)
        • E2.5-ELECTRICAL-SECOND-FLOOR-EMERGENCY-PM.-PLAN-Rev.2.pdf Uploaded: 3/17/2025 (1093 kb)
        • E2.6-ELECTRICAL-THIRD-FLOOR-EMERGENCY-PM.-PLAN-Rev.2.pdf Uploaded: 3/17/2025 (1098 kb)
        • E5.1-OFFICE-ENLARGED-FLR.-PLAN-POWER--LIGHTING-Rev.1.pdf Uploaded: 3/17/2025 (1106 kb)
        • E5.2-ELECTRICAL-WORKING-SPACE-ENLARGED-PLAN-Rev.0.pdf Uploaded: 3/17/2025 (1084 kb)
        • E6.0-ELECTRICAL-PANEL-SCHEDULE-Rev.2.pdf Uploaded: 3/17/2025 (1083 kb)
        • E6.1-ELECTRICAL-PANEL-SCHEDULE-Rev.2.pdf Uploaded: 3/17/2025 (1063 kb)
        • E9.0-ELECTRICAL---SINGLE-LINE-DIAGRAM-Rev.2.pdf Uploaded: 3/17/2025 (1089 kb)
      • Fire Protection
        • FP0.0-FIRE-PROTECTION-COVER-SHEET-Rev.2.pdf Uploaded: 3/17/2025 (581 kb)
        • FP1.1-FIRE-PROTECTION-OVERALL-PLAN---FINISH-FLOOR-Rev.2.pdf Uploaded: 3/17/2025 (657 kb)
        • FP1.2-FIRE-PROTECTION-OVERALL-PLAN---SECOND-FLOOR-Rev.2.pdf Uploaded: 3/17/2025 (637 kb)
        • FP1.3-FIRE-PROTECTION-OVERALL-PLAN---THIRD-FLOOR-Rev.2.pdf Uploaded: 3/17/2025 (631 kb)
        • FP1.4-FIRE-PROTECTION-OVERALL-PLAN---ROOF-Rev.0.pdf Uploaded: 3/17/2025 (586 kb)
    • Pricing Permit Set 2525
      • A001-P1.PDF Uploaded: 3/17/2025 (233 kb)
      • A701-O1.PDF Uploaded: 3/17/2025 (405 kb)
  • 02 Specs
    • 2838_Boyer_Street_Storage_Depot_Geotechnical_Evaluation.pdf Uploaded: 3/17/2025 (931 kb)
    • Document_Log.pdf Uploaded: 3/17/2025 (100 kb)
    • FINAL_ESA_2838_Boyer_Street_Charlotte_NC.pdf Uploaded: 3/17/2025 (13643 kb)
    • MSD Boyer St Flow Test Flow Acceptable CLT Water 1.10.25.pdf Uploaded: 3/17/2025 (45 kb)
    • MSD_-_COI_Sample.pdf Uploaded: 3/17/2025 (592 kb)
    • MSD_Boyer_St_-_Hydrant_Flow_Test_from_01232024.pdf Uploaded: 3/17/2025 (78 kb)
    • MSD_Design_Standards_-_Sterling_MASTER.xlsx Uploaded: 3/17/2025 (2486 kb)
    • Mini_Storage_Depot_SOV_Template.xlsx Uploaded: 3/17/2025 (25 kb)
  • 03 Addenda
    • RFI Responses
      • MINI STORAGE GASTONIA AOR.pdf Uploaded: 3/26/2025 (3653 kb)
      • RFI Responses 03-26-25.docx Uploaded: 3/26/2025 (178 kb)
      • RFI Responses 03-28-25.docx Uploaded: 4/1/2025 (178 kb)
    • Civil Set Revisions 4-10-25
      • Revisions Civil Set For Pricing.pdf Uploaded: 4/10/2025 (856 kb)
    • MEPF Revisions
      • Boyer Street Storage - Narrative of Changes MEP FP.docx Uploaded: 4/2/2025 (53 kb)
      • Boyer Street Storage_EL RevB Set_2025.03.03.pdf Uploaded: 4/2/2025 (2318 kb)
      • Boyer Street Storage_FP RevB Set_2025.03.03.pdf Uploaded: 4/2/2025 (2980 kb)
      • Boyer Street Storage_Mech. RevB Set_2025.03.03.pdf Uploaded: 4/2/2025 (3750 kb)
      • Boyer Street Storage_PL RevB Set_2025.03.03.pdf Uploaded: 4/2/2025 (7180 kb)

Project Info

Project # 25004R
Project Name Mini Storage Depot - Boyer Street
Location Charlotte, NC
Address Map It 2838 Boyer St
City Charlotte
State NC
Zip 28208
Bid Date April 10, 2025
Bid Time 1:00 PM
 
Scope
  • Estimated Ground Break:  May 2025
  • As the planned start of the project is May 2025, please provide pricing that anticipates that start date.  
  • 2838 Boyer St, Charlotte, NC 28054
  • Number of Buildings:  1
  • Unit Count: 466
  • Square Footage: 74,448
  • There are specific insurance requirements noted within the Sample Certificate of Insurance.
  • Bid Alternate 1:  Remove air intake/exhaust/louvers/economizers from the HVAC system (except at the office).
  • Bid Alternate 2:  Provide an alternate to sod the immediate front area of the building (at the parking and office areas).  The sides and rear of the buildings can remain seeded.
  • Bid Alternate 3:  Provide a quote to add an Emergency Radio Responder Communication System (ERRCS).  This quote needs to include the coordinating items to install the system (Electrical/Roofing Penetrations/Etc)
  • Bid Alternate 4:  Provide a CREDIT/VE for the alternate pavement profile identified in the plans (6"agg/2" binder/1.5" topcoat).
  • Specifications/Standards for Design:  The Sterling Standards Document is to provide clarity and will be part of the contract docs.  It is located in the BID DOCS Folder in Procore.
  • Geo Technical Report of Record:  Be sure to submit your bid in accordance with the Geo-Technical report of record's findings and recommendations.  Site balance will need to be included in your bid.  Addressing unsuitable soils that are verified in the report will need to be in your bid.  You do NOT need to assume unsuitable soils or other issues where they are not identified in the report.
  • Hydrant Flow Test:  This document is provided in the bid docs folder.  Please ensure that the design-build fire suppression system assumes the pressure/flow identified in this report and is included in your bid.
Plans
Other Info

Notices

If you are looking for attached files related to a Notice, go back to the Home tab ("Project Files" are on the right side).
Title Created By Created On
Bid Day Approaching Dom McIver 3/24/2025
RFI Responses & Bid Date Change Colin Thrun 3/26/2025
Updated RFI Responses Colin Thrun 4/1/2025
MEPF Revisions & Sitework Clarification Colin Thrun 4/2/2025
Civil Revisions Colin Thrun 4/10/2025

Estimators

Company Estimator Phone Extension Fax Email
Liles Construction Co., Inc. Colin Thrun 716-604-5434 cthrun@lilesconstruction.com
Liles Construction Co., Inc. Noah Carlson ncarlson@lilesconstruction.com

If you have project-related questions, please contact your contractor or use the "Submit Question" tab.
If you are having technical difficulties downloading, please email support@pipelinesuite.com or call 949-222-0400.