CCA 25th Street Harrisburg

Project Files

  • Plans
    • North Bld
      • 08 Fire Alarm
        • 223-FA001-DwgList Uploaded: 4/15/2025 (229 kb)
        • 224-FA101-Overall Uploaded: 4/15/2025 (506 kb)
        • 225-FA101A-QuadA Uploaded: 4/15/2025 (328 kb)
        • 225-FA102-Roof Uploaded: 4/15/2025 (248 kb)
        • 226-FA101B-QuaB Uploaded: 4/15/2025 (258 kb)
        • 227-FA101C-QuadC Uploaded: 4/15/2025 (314 kb)
      • 01 Civil
        • C-1 Cover Sheet Uploaded: 4/15/2025 (3180 kb)
        • C-10 Construction Details Uploaded: 4/15/2025 (792 kb)
        • C-11 Construction Details Uploaded: 4/15/2025 (3890 kb)
        • C-12 Construction Details Uploaded: 4/15/2025 (6863 kb)
        • C-13 PCSM Plan Uploaded: 4/15/2025 (790 kb)
        • C-14 PCSM Details Uploaded: 4/15/2025 (480 kb)
        • C-15 Erosion and Sediment Control Plan Uploaded: 4/15/2025 (854 kb)
        • C-16 Erosion and Sediment Control Details Uploaded: 4/15/2025 (749 kb)
        • C-17 Erosion and Sediment Control Details Uploaded: 4/15/2025 (582 kb)
        • C-18 Erosion and Sediment Control Details Uploaded: 4/15/2025 (2781 kb)
        • C-19 Erosion and Sediment Control Notes Uploaded: 4/15/2025 (630 kb)
        • C-2 Existing Conditions Plan Uploaded: 4/15/2025 (707 kb)
        • C-3 Demolition Plan Uploaded: 4/15/2025 (742 kb)
        • C-4 Site Layout Plan Uploaded: 4/15/2025 (672 kb)
        • C-4A Site Layout Plan With Solar Uploaded: 4/15/2025 (420 kb)
        • C-5 Grading Plan Uploaded: 4/15/2025 (765 kb)
        • C-5A Enlarged Grading Plan Uploaded: 4/15/2025 (419 kb)
        • C-6 Utility Plan Uploaded: 4/15/2025 (677 kb)
        • C-7 Driveway Plan and Profiles Uploaded: 4/15/2025 (669 kb)
        • C-8 Utility Profiles Uploaded: 4/15/2025 (713 kb)
        • C-9 Construction Details Uploaded: 4/15/2025 (401 kb)
      • 00 General
        • 001-T001-Title Uploaded: 4/15/2025 (1463 kb)
        • 002-T002-SheetList Uploaded: 4/15/2025 (360 kb)
        • 003-G001-Scope Uploaded: 4/15/2025 (2200 kb)
        • 004-G002-Code Uploaded: 4/15/2025 (1223 kb)
        • 005-G003-LifeSafety Uploaded: 4/15/2025 (1423 kb)
        • 006-G004-RoofDrain Uploaded: 4/15/2025 (499 kb)
        • 007-G005-ADArequirements Uploaded: 4/15/2025 (422 kb)
      • 03 Structural
        • 073-S001-Notes Uploaded: 4/15/2025 (197 kb)
        • 074-S002-Notes Uploaded: 4/15/2025 (196 kb)
        • 075-S100-Foundation Uploaded: 4/15/2025 (276 kb)
        • 076-S101-LowRoofFraming Uploaded: 4/15/2025 (232 kb)
        • 077-S102-MainRoofFraming Uploaded: 4/15/2025 (281 kb)
        • 078-S103-RoofLoading Uploaded: 4/15/2025 (211 kb)
        • 079-S104-Views Uploaded: 4/15/2025 (230 kb)
        • 080-S201-FoundationSec Uploaded: 4/15/2025 (361 kb)
        • 081-S202-FoundationSec Uploaded: 4/15/2025 (315 kb)
        • 082-S203-FoundationSec Uploaded: 4/15/2025 (243 kb)
        • 083-S204-FoundationSec Uploaded: 4/15/2025 (517 kb)
        • 084-S205-FoundationSec Uploaded: 4/15/2025 (327 kb)
        • 085-S301-Superstructure Uploaded: 4/15/2025 (246 kb)
        • 086-S302-Superstructure Uploaded: 4/15/2025 (216 kb)
        • 087-S303-Superstructure Uploaded: 4/15/2025 (235 kb)
        • 088-S304-Superstructure Uploaded: 4/15/2025 (663 kb)
        • 089-S305-Superstructure Uploaded: 4/15/2025 (222 kb)
      • 02 Architectural
        • 008-A001-PARTITION SCHEDULES AND TYP- DETAILS Uploaded: 4/15/2025 (443 kb)
        • 009-A002-DOOR SCHEDULE Uploaded: 4/15/2025 (479 kb)
        • 010-A003-DOOR AND STOREFRONT DETAILS Uploaded: 4/15/2025 (447 kb)
        • 011-A004 -EQUIPMENT SCHEDULES Uploaded: 4/15/2025 (405 kb)
        • 012-A005-SIGNAGE Uploaded: 4/15/2025 (375 kb)
        • 013-DM00-DEMO SCOPE Uploaded: 4/15/2025 (488 kb)
        • 014-DM01-DEMO Uploaded: 4/15/2025 (371 kb)
        • 015-A010-AERIAL VIEWS Uploaded: 4/15/2025 (1273 kb)
        • 016-A-011-ARCHITECTURAL SITE Uploaded: 4/15/2025 (748 kb)
        • 017-A012-ALT SCOPE DESCRIPTION Uploaded: 4/15/2025 (574 kb)
        • 018-A100-CONSTRUCTION Uploaded: 4/15/2025 (665 kb)
        • 019-A100A-FIRST FLOOR QUAD A Uploaded: 4/15/2025 (536 kb)
        • 020-A100B-FIRST FLOOR QUAD B Uploaded: 4/15/2025 (738 kb)
        • 021-A100C-FIRST FLOOR QUAD C Uploaded: 4/15/2025 (559 kb)
        • 022-A102-ROOF Uploaded: 4/15/2025 (510 kb)
        • 023-A102A-ROOF PLAN QUADRANT A Uploaded: 4/15/2025 (473 kb)
        • 024-A102B-ROOF PLAN QUADRANT B Uploaded: 4/15/2025 (452 kb)
        • 025-A102C-ROOF PLAN QUADRANT C Uploaded: 4/15/2025 (424 kb)
        • 026-A201- RCP FIRST FLOOR Uploaded: 4/15/2025 (673 kb)
        • 027-A201A- RCP FIRST FLOOR QUAD A Uploaded: 4/15/2025 (570 kb)
        • 028-A201B-RCP FIRST FLOOR QUAD B Uploaded: 4/15/2025 (581 kb)
        • 029-A201C-RCP FIRST FLOOR QUAD C Uploaded: 4/15/2025 (570 kb)
        • 030-A202-ENLARGED RCP Uploaded: 4/15/2025 (445 kb)
        • 031-A301-POWER-COM-FURN FIRST FL Uploaded: 4/15/2025 (705 kb)
        • 032-A301A-POWER COM FURN 1st Fl QUAD A Uploaded: 4/15/2025 (505 kb)
        • 033-A301B-POWER COM FURN 1st Fl QUAD B Uploaded: 4/15/2025 (499 kb)
        • 034-A301C-POWER COM FURN 1st Fl QUAD C Uploaded: 4/15/2025 (575 kb)
        • 035-A401A-FINISH 1st Fl QUAD A Uploaded: 4/15/2025 (701 kb)
        • 036-A401B-FINISH 1st Fl QUAD B Uploaded: 4/15/2025 (906 kb)
        • 037-A401C-FINISH 1st Fl QUAD C Uploaded: 4/15/2025 (640 kb)
        • 038-A410A-SIGNAGE 1st Fl QUAD A Uploaded: 4/15/2025 (447 kb)
        • 039-A410B-SIGNAGE 1st Fl QUAD B Uploaded: 4/15/2025 (462 kb)
        • 040-A410C-SIGNAGE 1st Fl QUAD C Uploaded: 4/15/2025 (486 kb)
        • 041-A501-OVERALL BUILDING ELEV Uploaded: 4/15/2025 (974 kb)
        • 042-A502-BUILDING ELEV Uploaded: 4/15/2025 (740 kb)
        • 043-A503-BUILDING ELEV Uploaded: 4/15/2025 (417 kb)
        • 044-A511-BUILDING SECTIONS Uploaded: 4/15/2025 (761 kb)
        • 045-A521-WALL SECTIONS Uploaded: 4/15/2025 (954 kb)
        • 046-A522-WALL SECTIONS Uploaded: 4/15/2025 (752 kb)
        • 047-A523-WALL SECTIONS Uploaded: 4/15/2025 (626 kb)
        • 048-A524-WALL SECTIONS Uploaded: 4/15/2025 (3030 kb)
        • 049-A550-INTERIOR STAIR Uploaded: 4/15/2025 (733 kb)
        • 050-A551-INTERIOR STAIR Uploaded: 4/15/2025 (450 kb)
        • 051-A552-INTERIOR STAIRS AT SHELLED SPACE Uploaded: 4/15/2025 (349 kb)
        • 052-A601-WOMENS RESTROOM Uploaded: 4/15/2025 (462 kb)
        • 053-A602-MENS RESTROOM Uploaded: 4/15/2025 (496 kb)
        • 054-A604-BREAK ROOM PANTRY Uploaded: 4/15/2025 (1207 kb)
        • 055-A610-INT ELEV CONF ROOM Uploaded: 4/15/2025 (452 kb)
        • 056-A611-INT ELEV BUSINESS AND TECH OFFICES Uploaded: 4/15/2025 (422 kb)
        • 057-A612-INT ELEV TECH OFFICES Uploaded: 4/15/2025 (420 kb)
        • 058-A613-INT ELEV TECH OFFICES DC ENTRY Uploaded: 4/15/2025 (405 kb)
        • 059-A614-INT ELEV ENTRY CORRIDOR Uploaded: 4/15/2025 (407 kb)
        • 060-A615-INT ELEV ENTRY CORRIDOR Uploaded: 4/15/2025 (422 kb)
        • 061-A616-INT ELEV FACILITY OFFICE AND TECH LAB Uploaded: 4/15/2025 (393 kb)
        • 062-A617-INT ELEV SERVER RM Uploaded: 4/15/2025 (463 kb)
        • 063-A620-INT ELEV CORRIDORS Uploaded: 4/15/2025 (403 kb)
        • 064-A621-INT ELEV CORRIDOR GENERATOR RM Uploaded: 4/15/2025 (412 kb)
        • 065-A701-DETAILS Uploaded: 4/15/2025 (547 kb)
        • 066-A702-DETAILS Uploaded: 4/15/2025 (694 kb)
        • 067-A703-DETAILS Uploaded: 4/15/2025 (521 kb)
        • 068-A704-DETAILS Uploaded: 4/15/2025 (476 kb)
        • 069-A705-ROOF DETAILS Uploaded: 4/15/2025 (697 kb)
        • 070-A801-MILLWORK DETAILS Uploaded: 4/15/2025 (472 kb)
        • 071-A803-CEILING DETAILS Uploaded: 4/15/2025 (481 kb)
        • 072-A901-FURNITURE-REFERENCE ONLY Uploaded: 4/15/2025 (666 kb)
      • 05 Plumbing
        • 141-P001-NOTES Uploaded: 4/15/2025 (216 kb)
        • 142-P002-SYMBOLS ABBREVIATIONS Uploaded: 4/15/2025 (215 kb)
        • 143-P100-UNDERGROUND PIPING Uploaded: 4/15/2025 (252 kb)
        • 144-P101-OVERALL PLAN Uploaded: 4/15/2025 (363 kb)
        • 145-P101A-PART PLAN QUAD A Uploaded: 4/15/2025 (288 kb)
        • 146-P101B-PART PLAN QUAD B Uploaded: 4/15/2025 (283 kb)
        • 147-P101C-PART PLAN QUAD C Uploaded: 4/15/2025 (316 kb)
        • 148-P201-PARTIAL PLANS Uploaded: 4/15/2025 (317 kb)
        • 149-P401-RISER DIAGRAM Uploaded: 4/15/2025 (217 kb)
        • 150-P501-DETAILS I Uploaded: 4/15/2025 (329 kb)
        • 151-P502-DETAILS II Uploaded: 4/15/2025 (290 kb)
      • 04 Mechanical
        • 090-M001-NOTES Uploaded: 4/15/2025 (226 kb)
        • 091-M002-SYMBOL LIST Uploaded: 4/15/2025 (272 kb)
        • 092-M100- EQUIPMENT Uploaded: 4/15/2025 (1189 kb)
        • 092-MR000- REMOVAL NOTES Uploaded: 4/15/2025 (228 kb)
        • 092-MR001-REMOVAL PLAN FIRST FL Uploaded: 4/15/2025 (253 kb)
        • 092-MR002- REMOVAL ROOF Uploaded: 4/15/2025 (226 kb)
        • 093-M100A-EQUIPMENT FIRST FLOOR QUAD A Uploaded: 4/15/2025 (640 kb)
        • 094-M100B-EQUIPMENT FIRST FLOOR QUAD B Uploaded: 4/15/2025 (1462 kb)
        • 095-M100C-EQUIPMENT FIRST FL QUAD C Uploaded: 4/15/2025 (360 kb)
        • 096-M101-ROOF Uploaded: 4/15/2025 (361 kb)
        • 097-M101A-ROOF QUAD A Uploaded: 4/15/2025 (319 kb)
        • 098-M101B-ROOF QUAD B Uploaded: 4/15/2025 (295 kb)
        • 099-M101C-ROOF QUAD C Uploaded: 4/15/2025 (253 kb)
        • 100-M110-FUEL OIL EQUIPMENT PIPING Uploaded: 4/15/2025 (738 kb)
        • 101-M110A-FUEL OIL EQUIPMENT PIPING QUAD A Uploaded: 4/15/2025 (556 kb)
        • 102-M130-SNOW MELT Uploaded: 4/15/2025 (460 kb)
        • 103-M200-DUCTWORK FIRST FL Uploaded: 4/15/2025 (1150 kb)
        • 104-M200A-DUCTWORK FIRST FL QUAD A Uploaded: 4/15/2025 (718 kb)
        • 105-M200B-DUCTWORK FIRST FL QUAD B Uploaded: 4/15/2025 (855 kb)
        • 106-M200C-DUCTWORK FIRST FL QUAD C Uploaded: 4/15/2025 (656 kb)
        • 107-M201-DUCTWORK ROOF Uploaded: 4/15/2025 (374 kb)
        • 108-M201A-DUCTWORK ROOF QUAD A Uploaded: 4/15/2025 (326 kb)
        • 109-M201B-DUCTWORK ROOF QUAD B Uploaded: 4/15/2025 (289 kb)
        • 110-M201C-DUCTWORK ROOF QUAD C Uploaded: 4/15/2025 (261 kb)
        • 111-M301-SCHEDULES Uploaded: 4/15/2025 (221 kb)
        • 112-M302-SCHEDULES Uploaded: 4/15/2025 (226 kb)
        • 113-M303-SCHEDULES Uploaded: 4/15/2025 (224 kb)
        • 114-M304-SCHEDULES Uploaded: 4/15/2025 (224 kb)
        • 115-M305-SCHEDULES Uploaded: 4/15/2025 (232 kb)
        • 116-M306-SCHEDULES Uploaded: 4/15/2025 (234 kb)
        • 117-M307-SCHEDULES Uploaded: 4/15/2025 (222 kb)
        • 118-M308-SCHEDULES Uploaded: 4/15/2025 (221 kb)
        • 119-M401-FUEL OIL DIAGRAM Uploaded: 4/15/2025 (341 kb)
        • 120-M402-CHILLED WATER DIAGRAM - DATA CENTER Uploaded: 4/15/2025 (368 kb)
        • 121-M501-DETAILS Uploaded: 4/15/2025 (570 kb)
        • 122-M502-DETAILS Uploaded: 4/15/2025 (594 kb)
        • 123-M503-DETAILS Uploaded: 4/15/2025 (592 kb)
        • 124-M504-DETAILS Uploaded: 4/15/2025 (239 kb)
        • 125-M505-DETAILS Uploaded: 4/15/2025 (295 kb)
        • 126-M506-DETAILS Uploaded: 4/15/2025 (301 kb)
        • 127-M507-DETAILS Uploaded: 4/15/2025 (329 kb)
        • 128-M508-DETAILS Uploaded: 4/15/2025 (502 kb)
        • 129-M509-DETAILS Uploaded: 4/15/2025 (290 kb)
        • 130-M510-DETAILS Uploaded: 4/15/2025 (403 kb)
        • 131-M511-DETAILS Uploaded: 4/15/2025 (354 kb)
        • 132-M512-DETAILS Uploaded: 4/15/2025 (316 kb)
        • 133-M513-DETAILS Uploaded: 4/15/2025 (411 kb)
        • 134-M514-DETAILS Uploaded: 4/15/2025 (411 kb)
        • 135-M515-DETAILS Uploaded: 4/15/2025 (489 kb)
        • 136-M516-DETAILS Uploaded: 4/15/2025 (236 kb)
        • 137-M517-DETAILS Uploaded: 4/15/2025 (363 kb)
        • 138-M701-CONTROL DIAGRAMS Uploaded: 4/15/2025 (269 kb)
        • 139-M702-CONTROL DIAGRAMS Uploaded: 4/15/2025 (712 kb)
        • 140-M703-CONTROL DIAGRAMS Uploaded: 4/15/2025 (241 kb)
      • 07 Fire Protection
        • 212-FP001-SCHEDULES Uploaded: 4/15/2025 (320 kb)
        • 213-FP002-ZONING Uploaded: 4/15/2025 (690 kb)
        • 214-FP100-OVERALL Uploaded: 4/15/2025 (537 kb)
        • 215-FP100A-QUAD A Uploaded: 4/15/2025 (452 kb)
        • 216-FP100B-QUAD B Uploaded: 4/15/2025 (400 kb)
        • 217-FP100C-QUAD C Uploaded: 4/15/2025 (451 kb)
        • 218-FP200-WATER ROOM Uploaded: 4/15/2025 (315 kb)
        • 219-FP401-RISER DIAGRAM Uploaded: 4/15/2025 (308 kb)
        • 220-FP501-DETAILS I Uploaded: 4/15/2025 (353 kb)
        • 221-FP502-DETAILS II Uploaded: 4/15/2025 (354 kb)
        • 222-FP503-DETAILS III Uploaded: 4/15/2025 (347 kb)
      • 06 Electrical
        • 152-E001-DwgList Uploaded: 4/15/2025 (393 kb)
        • 153-E002-Schedule Uploaded: 4/15/2025 (260 kb)
        • 154-E003-Site Uploaded: 4/15/2025 (359 kb)
        • 155-E004-Alternate Uploaded: 4/15/2025 (354 kb)
        • 156-ED101-Demo Uploaded: 4/15/2025 (264 kb)
        • 157-E101-Power Uploaded: 4/15/2025 (578 kb)
        • 158-E101A-Power Uploaded: 4/15/2025 (442 kb)
        • 159-E101B-Power Uploaded: 4/15/2025 (570 kb)
        • 160-E101C-Power Uploaded: 4/15/2025 (450 kb)
        • 161-E111-UndergroundConduit Uploaded: 4/15/2025 (583 kb)
        • 162-E111A-UndergroundConduit Uploaded: 4/15/2025 (857 kb)
        • 163-E111B-UndergroundConduit Uploaded: 4/15/2025 (309 kb)
        • 164-E111C-UndergroundConduit Uploaded: 4/15/2025 (319 kb)
        • 165-E121-OverheadConduit Uploaded: 4/15/2025 (584 kb)
        • 166-E121A-OverheadConduit Uploaded: 4/15/2025 (460 kb)
        • 167-E121B-OverheadConduit Uploaded: 4/15/2025 (678 kb)
        • 168-E201-Lighting Uploaded: 4/15/2025 (412 kb)
        • 169-E201A-Lighting Uploaded: 4/15/2025 (420 kb)
        • 170-E201B-Lighting Uploaded: 4/15/2025 (332 kb)
        • 171-E201C-Lighting Uploaded: 4/15/2025 (390 kb)
        • 172-E202-LighitngRoof Uploaded: 4/15/2025 (249 kb)
        • 173-E301-MechEquipPower Uploaded: 4/15/2025 (576 kb)
        • 174-E301A-MechEquipPower Uploaded: 4/15/2025 (447 kb)
        • 175-E301B-MechEquipPower Uploaded: 4/15/2025 (570 kb)
        • 176-E301C-MechEquipPower Uploaded: 4/15/2025 (424 kb)
        • 177-E302-MechEquipPwrRoof Uploaded: 4/15/2025 (270 kb)
        • 178-E401-MechEquipSchedule Uploaded: 4/15/2025 (229 kb)
        • 179-E402-MechEquipSchedule Uploaded: 4/15/2025 (222 kb)
        • 180-E403-MechEquipWiring Uploaded: 4/15/2025 (263 kb)
        • 181-E501-PanelSchedules Uploaded: 4/15/2025 (228 kb)
        • 182-E502-PanelSchedules Uploaded: 4/15/2025 (244 kb)
        • 183-E503-PanelSchedules Uploaded: 4/15/2025 (243 kb)
        • 184-E504-PanelSchedules Uploaded: 4/15/2025 (223 kb)
        • 185-E601-OneLineDiagram Uploaded: 4/15/2025 (227 kb)
        • 186-E602-OneLineDiagram Uploaded: 4/15/2025 (295 kb)
        • 187-E603-OneLineDiagram Uploaded: 4/15/2025 (256 kb)
        • 188-E604-OneLineDiagram Uploaded: 4/15/2025 (261 kb)
        • 189-EG101-Grounding Uploaded: 4/15/2025 (636 kb)
        • 190-EG601-GroundingRiser Uploaded: 4/15/2025 (237 kb)
        • 191-EG602-GroundingRiser Uploaded: 4/15/2025 (235 kb)
        • 192-E901-Dtls Uploaded: 4/15/2025 (364 kb)
        • 193-E902-Dtls Uploaded: 4/15/2025 (344 kb)
        • 194-E903-Dtls Uploaded: 4/15/2025 (277 kb)
        • 195-E904-Dtls Uploaded: 4/15/2025 (312 kb)
        • 196-E905-Dtls Uploaded: 4/15/2025 (227 kb)
        • 197-E906-Dtls Uploaded: 4/15/2025 (356 kb)
        • 198-E907-Dtls Uploaded: 4/15/2025 (333 kb)
        • 199-E908-Dtls Uploaded: 4/15/2025 (275 kb)
        • 200-E909-Dtls Uploaded: 4/15/2025 (275 kb)
        • 201-E910-Dtls Uploaded: 4/15/2025 (235 kb)
        • 202-E911-Dtls Uploaded: 4/15/2025 (232 kb)
        • 203-E912-Dtls Uploaded: 4/15/2025 (276 kb)
        • 204-E913-Dtls Uploaded: 4/15/2025 (224 kb)
        • 205-E914-Dtls Uploaded: 4/15/2025 (360 kb)
        • 206-E915-Dtls Uploaded: 4/15/2025 (253 kb)
        • 207-ES001-Security Uploaded: 4/15/2025 (343 kb)
        • 208-ES101-Security Uploaded: 4/15/2025 (568 kb)
        • 209-ES101A-Security Uploaded: 4/15/2025 (396 kb)
        • 210-ES101B-Security Uploaded: 4/15/2025 (270 kb)
        • 211-ES101C-Security Uploaded: 4/15/2025 (391 kb)
    • South Bld
      • 01 Architectural
        • 000-CS1.01-Cover Uploaded: 4/15/2025 (5367 kb)
        • 001-G1.01-Drawing Index Uploaded: 4/15/2025 (294 kb)
        • 002-G2.01-Code Uploaded: 4/15/2025 (1767 kb)
        • 003-G2.02-Accessibility Dwgs Uploaded: 4/15/2025 (395 kb)
        • 004-G2.03-1st Fl Life Safety Uploaded: 4/15/2025 (1383 kb)
        • 005-G2.04-Lower Level Life Safety Uploaded: 4/15/2025 (1861 kb)
        • 006-G3.01-Interior Wall Types Uploaded: 4/15/2025 (401 kb)
        • 007-G3.02-Interior Wall Types Uploaded: 4/15/2025 (405 kb)
        • 008-G4.01-1st Fl and Lower Level Scope Uploaded: 4/15/2025 (1150 kb)
        • 009-L1.0-Overall Site Uploaded: 4/15/2025 (2777 kb)
        • 010-L1.02-Overall Planting Uploaded: 4/15/2025 (5491 kb)
        • 011-L1.03-Alt 2 Parking Lot Planting Uploaded: 4/15/2025 (594 kb)
        • 012-L2.01-Landscape Materials Uploaded: 4/15/2025 (2682 kb)
        • 013-L2.02-Landscape Layout Uploaded: 4/15/2025 (1509 kb)
        • 014-L2.03-Landscape Soils Uploaded: 4/15/2025 (2034 kb)
        • 015-L2.04-Landscape Planting Uploaded: 4/15/2025 (3823 kb)
        • 016-L4.01Landscape Site Furniture Details Uploaded: 4/15/2025 (437 kb)
        • 017-L4.02-Landscape Planting Details Uploaded: 4/15/2025 (508 kb)
        • 018-L4.03-Landscape Planting Details Uploaded: 4/15/2025 (338 kb)
        • 019-D1.01-1st Fl Demo Uploaded: 4/15/2025 (622 kb)
        • 020-D1.02-Lower Level Demo Uploaded: 4/15/2025 (464 kb)
        • 021-D1.03-Roof Demo Uploaded: 4/15/2025 (854 kb)
        • 022-D2.01-Demo Elev Uploaded: 4/15/2025 (410 kb)
        • 023-D2.02-Demo Elev Uploaded: 4/15/2025 (671 kb)
        • 024-D2.03-Demo Elev Uploaded: 4/15/2025 (504 kb)
        • 025-A1.01-1st Fl Uploaded: 4/15/2025 (862 kb)
        • 026-A1.02-Lower Level Fl Uploaded: 4/15/2025 (729 kb)
        • 027-A1.03-Roof Uploaded: 4/15/2025 (342 kb)
        • 028-A1.50-Restroom Uploaded: 4/15/2025 (510 kb)
        • 029-A1.51-Restroom Uploaded: 4/15/2025 (876 kb)
        • 030-A2.01-Exterior Elevations Uploaded: 4/15/2025 (676 kb)
        • 031-A2.02-Exterior Elevations Uploaded: 4/15/2025 (711 kb)
        • 032-A2.03-Exterior Elevations Uploaded: 4/15/2025 (499 kb)
        • 033-A4.01-First Floor RCP Uploaded: 4/15/2025 (1141 kb)
        • 034-A4.02-Lower Level RCP Uploaded: 4/15/2025 (792 kb)
        • 035-A5.01-Communicating Stair and Details Uploaded: 4/15/2025 (501 kb)
        • 036-A5.02-Stair Details Uploaded: 4/15/2025 (346 kb)
        • 037-A5.03-Stair Details Uploaded: 4/15/2025 (310 kb)
        • 038-A5.04-Elevator Uploaded: 4/15/2025 (370 kb)
        • 039-A6.01-Interior Elevations Uploaded: 4/15/2025 (1070 kb)
        • 040-A6.02-Interior Elevations Uploaded: 4/15/2025 (1036 kb)
        • 041-A6.03-Interior Elevations Uploaded: 4/15/2025 (424 kb)
        • 042-A6.04-Interior Elevations Uploaded: 4/15/2025 (471 kb)
        • 043-A6.05-Interior Elevations Uploaded: 4/15/2025 (329 kb)
        • 044-A6.50-Interior Details Feature Wall Uploaded: 4/15/2025 (628 kb)
        • 045-A6.51-Interior Details Uploaded: 4/15/2025 (363 kb)
        • 046-A6.52-Interior Details Uploaded: 4/15/2025 (452 kb)
        • 047-A6.53-Casework Details Uploaded: 4/15/2025 (365 kb)
        • 048-A6.54-Casework Details Uploaded: 4/15/2025 (334 kb)
        • 049-A6.55-Ceiling Details Uploaded: 4/15/2025 (396 kb)
        • 050-A6.56-Ceiling Details Uploaded: 4/15/2025 (322 kb)
        • 051-A7.00-Exterior Assembly Types Uploaded: 4/15/2025 (465 kb)
        • 052-A7.01-Wall Sections Uploaded: 4/15/2025 (516 kb)
        • 053-A7.02-Wall Sections Uploaded: 4/15/2025 (388 kb)
        • 054-A7.03-Wall Sections Uploaded: 4/15/2025 (674 kb)
        • 055-A7.04-Wall Section Uploaded: 4/15/2025 (638 kb)
        • 056-A7.11-Enclosure Details Uploaded: 4/15/2025 (560 kb)
        • 057-A7.12-Enclosure Details Uploaded: 4/15/2025 (370 kb)
        • 058-A7.13-Enclosure Details Uploaded: 4/15/2025 (681 kb)
        • 059-A7.21-Enclosure Details Uploaded: 4/15/2025 (589 kb)
        • 060-A7.22-Enclosure Details Uploaded: 4/15/2025 (407 kb)
        • 061-A7.23-Enclosure Details Uploaded: 4/15/2025 (383 kb)
        • 062-A7.31-Enclosure Details Uploaded: 4/15/2025 (585 kb)
        • 063-A8.01-Door Schedule Uploaded: 4/15/2025 (390 kb)
        • 064-A8.10-Window Types Uploaded: 4/15/2025 (294 kb)
        • 065-A8.11-Curtain Wall Enlarged Elev Uploaded: 4/15/2025 (307 kb)
        • 066-A8.21-Window Details Uploaded: 4/15/2025 (477 kb)
        • 067-A8.22-Window Details Uploaded: 4/15/2025 (508 kb)
        • 068-A8.23-Window Details Uploaded: 4/15/2025 (349 kb)
        • 069-A8.24-Window Details Uploaded: 4/15/2025 (560 kb)
        • 070-A8.30-First Fl Signage Uploaded: 4/15/2025 (985 kb)
        • 071-A8.31-Lower Level Signage Uploaded: 4/15/2025 (670 kb)
        • 072-A8.32-Signage Details Uploaded: 4/15/2025 (281 kb)
        • 073-A8.33-Speciality Signage Details Uploaded: 4/15/2025 (450 kb)
        • 074-A9.01-First Fl Finish Uploaded: 4/15/2025 (1921 kb)
        • 075-A9.02-Lower Level Finish Uploaded: 4/15/2025 (584 kb)
        • 076-A9.03-Finish Details Uploaded: 4/15/2025 (287 kb)
        • 077-A9.04-Finish Legend and Schedule Uploaded: 4/15/2025 (284 kb)
        • 078-A9.50-First Fl Furniture For Reference Only Uploaded: 4/15/2025 (5451 kb)
        • 079-A9.51-Lower Level Furniture For Reference Only Uploaded: 4/15/2025 (3240 kb)
      • 03 Mechanical
        • 094-M0.00-Data Sheet Uploaded: 4/15/2025 (532 kb)
        • 095-M1.01-Lower Level Uploaded: 4/15/2025 (1516 kb)
        • 096-M1.02-Roof Uploaded: 4/15/2025 (1478 kb)
        • 097-M2.00-First Fl Mech Piping Uploaded: 4/15/2025 (1568 kb)
        • 098-M2.01-Lower Lever Mech Piping Uploaded: 4/15/2025 (1745 kb)
        • 099-M3.00-Details Uploaded: 4/15/2025 (990 kb)
        • 100-M3.01-Details Uploaded: 4/15/2025 (556 kb)
        • 101-M4.00-Schedules Uploaded: 4/15/2025 (631 kb)
        • 102-M4.01-Schedules Uploaded: 4/15/2025 (493 kb)
        • 103-M4.02-Schedules Uploaded: 4/15/2025 (1524 kb)
        • 104-MD1.00-First Fl Demo Uploaded: 4/15/2025 (659 kb)
        • 105-MD1.01- Lower Lever Demo Uploaded: 4/15/2025 (613 kb)
      • 02 Structural
        • 080-S0.01-NOTES Uploaded: 4/15/2025 (1019 kb)
        • 081-S0.02-NOTES AND SCHEDULES Uploaded: 4/15/2025 (996 kb)
        • 082-S1.01-FIRST FL FRAMING Uploaded: 4/15/2025 (1237 kb)
        • 083-S1.02-LOWER LEVEL FOUNDATION Uploaded: 4/15/2025 (1194 kb)
        • 084-S1.03-ROOF FRAMING Uploaded: 4/15/2025 (1199 kb)
        • 085-S2.01-FOUNDATION TYPICAL DETAILS Uploaded: 4/15/2025 (1185 kb)
        • 086-S2.02-FRAMING TYPICAL DETAILS Uploaded: 4/15/2025 (1102 kb)
        • 087-S3.01-FOUNDATION SECTIONS Uploaded: 4/15/2025 (1096 kb)
        • 088-S3.02-FRAMING SECTIONS Uploaded: 4/15/2025 (1096 kb)
        • 089-S4.01-COMMUNICATING STAIR SECTIONS AND DETAILS Uploaded: 4/15/2025 (1083 kb)
        • 090-S4.02-ELEVATOR SECTIONS AND DETAILS Uploaded: 4/15/2025 (1176 kb)
        • 091-S4.03-CANOPY AND FACADE Uploaded: 4/15/2025 (1165 kb)
        • 092-S4.04-FACADE SECTIONS AND DETAILS Uploaded: 4/15/2025 (1178 kb)
        • 093-SD1.01-FIRST FL FRAMING DEMO Uploaded: 4/15/2025 (1139 kb)
      • 05 Electrical
        • 120-E0.00-DATA SHEET Uploaded: 4/15/2025 (585 kb)
        • 121-E0.01- DATA SHEET Uploaded: 4/15/2025 (611 kb)
        • 122-E1.00-FIRST FL LIGHTING Uploaded: 4/15/2025 (1148 kb)
        • 123-E1.01-LL LIGHTING Uploaded: 4/15/2025 (961 kb)
        • 124-E2.00-FIRST FL POWER Uploaded: 4/15/2025 (1264 kb)
        • 125-E2.01- LL POWER Uploaded: 4/15/2025 (1848 kb)
        • 126-E2.02-ROOF POWER Uploaded: 4/15/2025 (552 kb)
        • 127-E4.00-DETAILS Uploaded: 4/15/2025 (858 kb)
        • 128-E4.01-DETAILS Uploaded: 4/15/2025 (633 kb)
        • 129-E4.02-DETAILS Uploaded: 4/15/2025 (1069 kb)
        • 130-E4.03-DETAILS Uploaded: 4/15/2025 (661 kb)
        • 131-E5.00-SCHEDULES Uploaded: 4/15/2025 (739 kb)
        • 132-E5.01-SCHEDULES Uploaded: 4/15/2025 (624 kb)
        • 133-E5.02-SCHEDULES Uploaded: 4/15/2025 (595 kb)
        • 134-E5.03-SCHEDULES Uploaded: 4/15/2025 (589 kb)
        • 135-E5.04-SCHEDULES Uploaded: 4/15/2025 (679 kb)
        • 136-ED1.00-FIRST FL DEMO Uploaded: 4/15/2025 (721 kb)
        • 137-ED1.01-LL DEMO Uploaded: 4/15/2025 (698 kb)
        • 138-ED1.02-ROOF DEMO Uploaded: 4/15/2025 (605 kb)
      • 04 Plumbing
        • 106-P0.00-DATA SHEET Uploaded: 4/15/2025 (598 kb)
        • 107-P1.00-FIRST FL SUPPLY Uploaded: 4/15/2025 (1705 kb)
        • 108-P1.01-LOWER LEVEL SUPPLY Uploaded: 4/15/2025 (1398 kb)
        • 109-P2.00-DRAINAGE Uploaded: 4/15/2025 (1743 kb)
        • 110-P2.01-LOWER LEVEL DRAINAGE Uploaded: 4/15/2025 (1459 kb)
        • 111-P2.02-ROOF Uploaded: 4/15/2025 (942 kb)
        • 112-P3.00-ENLARGED Uploaded: 4/15/2025 (1366 kb)
        • 113-P4.00-DETAILS Uploaded: 4/15/2025 (643 kb)
        • 114-P4.01-DETAILS Uploaded: 4/15/2025 (597 kb)
        • 115-P5.00-SCHEDULES Uploaded: 4/15/2025 (703 kb)
        • 116-P5.01-SCHEDULES Uploaded: 4/15/2025 (848 kb)
        • 117-PD1.00-FIRST FL DEMO Uploaded: 4/15/2025 (728 kb)
        • 118-PD1.01-LOWER LEVEL DEMO Uploaded: 4/15/2025 (706 kb)
        • 119-PD1.02-ROOF DEMO Uploaded: 4/15/2025 (584 kb)
      • 07 Fire Alarm
        • 143-FA0.00-Data Sheet Uploaded: 4/15/2025 (648 kb)
        • 144-FA1.00-1st Floor Uploaded: 4/15/2025 (1210 kb)
        • 145-FA1.01-LL Uploaded: 4/15/2025 (940 kb)
        • 146-FA4.00-Details Uploaded: 4/15/2025 (793 kb)
      • 06 Fire Protection
        • 139-FP0.00-DATA SHEET Uploaded: 4/15/2025 (611 kb)
        • 140-FP1.01-FIRST FLOOR Uploaded: 4/15/2025 (2215 kb)
        • 141-FP1.02-LOWER LEVEL Uploaded: 4/15/2025 (1637 kb)
        • 142-FP4.00-DETAILS Uploaded: 4/15/2025 (589 kb)
  • Specs
    • DIV 1
      • 011000 Summary Uploaded: 4/15/2025 (134 kb)
      • 012100 Allowances Uploaded: 4/15/2025 (84 kb)
      • 012300 Alternates Uploaded: 4/15/2025 (82 kb)
      • 012500 Substitution Procedures Uploaded: 4/15/2025 (87 kb)
      • 012600 Contract Modification Procedures Uploaded: 4/15/2025 (79 kb)
      • 012900 Payment Procedures Uploaded: 4/15/2025 (93 kb)
      • 013100 Proj. Mgmt. Coordination Uploaded: 4/15/2025 (174 kb)
      • 013200 Constr. Progress Documentation Uploaded: 4/15/2025 (93 kb)
      • 013233 Photographic Documentation Uploaded: 4/15/2025 (105 kb)
      • 013300 Submittal Procedures Uploaded: 4/15/2025 (246 kb)
      • 014000 Quality Requirements Uploaded: 4/15/2025 (123 kb)
      • 014200 References Uploaded: 4/15/2025 (128 kb)
      • 015000 Temporary Facilities and Controls Uploaded: 4/15/2025 (137 kb)
      • 015713 Temporary Erosion and Sediment Control Uploaded: 4/15/2025 (53 kb)
      • 016000 Product Requirements Uploaded: 4/15/2025 (101 kb)
      • 017300 Execution Uploaded: 4/15/2025 (114 kb)
      • 017419 Constr. Waste Mmgt. Disposal Uploaded: 4/15/2025 (92 kb)
      • 017700 Closeout Procedures Uploaded: 4/15/2025 (106 kb)
      • 017823 Operation Maint. Data Uploaded: 4/15/2025 (111 kb)
      • 017839 Proj. Record Documents Uploaded: 4/15/2025 (80 kb)
      • 017900 Demonstration and Training Uploaded: 4/15/2025 (95 kb)
    • DIV 0
      • 000001 Cover Sheet Uploaded: 4/15/2025 (135 kb)
      • 000002 TOC Volume 1 Uploaded: 4/15/2025 (196 kb)
      • 001113 Advertisement for Bids Uploaded: 4/15/2025 (143 kb)
      • 001300 Prevailing Wage Uploaded: 4/15/2025 (413 kb)
      • 002513 Prebid Meetings Uploaded: 4/15/2025 (98 kb)
      • 004113 Bid Form - Stipulated Sum Uploaded: 4/15/2025 (131 kb)
      • 004300 PA Tax Exempt Entity Disclosure Uploaded: 4/15/2025 (75 kb)
      • 004393 Bid Submittal Checklist Uploaded: 4/15/2025 (80 kb)
      • 004394 Non-Collusion Affidavit Uploaded: 4/15/2025 (96 kb)
      • 004900N_Contractors Qualifications Statement IFB-20250411 Uploaded: 4/15/2025 (46 kb)
      • 006000 Project Forms Uploaded: 4/15/2025 (74 kb)
      • 006001 A101 2017 - Sample Uploaded: 4/15/2025 (367 kb)
      • 006002 A101 ExhibitA-2017 Uploaded: 4/15/2025 (334 kb)
      • 006003 CCA General Conditions of the Contract for Construction Uploaded: 4/15/2025 (997 kb)
      • 006004 A305-2020 - Sample Uploaded: 4/15/2025 (248 kb)
      • 006005 A305 ExhibitA-2020 - Sample Uploaded: 4/15/2025 (245 kb)
      • 006006 A305 ExhibitB-2020 - Sample Uploaded: 4/15/2025 (237 kb)
      • 006007 A305 ExhibitC-2020 - Sample Uploaded: 4/15/2025 (250 kb)
      • 006008 A305 ExhibitD-2020 - Form Draft Sample Uploaded: 4/15/2025 (199 kb)
      • 006009 A305 ExhibitE-2020 - Form Sample Uploaded: 4/15/2025 (201 kb)
      • 006010 A312 Payment Bond-2010 - Sample Uploaded: 4/15/2025 (295 kb)
      • 006011 A312 Performance Bond-2010 - Sample Uploaded: 4/15/2025 (284 kb)
      • 006012 A701-2018 - Instructions to Bidders - 001 Uploaded: 4/15/2025 (358 kb)
      • 006013 G706A-1994 - Form Liens Sample Uploaded: 4/15/2025 (239 kb)
      • 006014 C132-2019 - Working Draft - 001 Uploaded: 4/15/2025 (584 kb)
    • DIV 32
      • 321216 - Asphalt Paving Uploaded: 4/15/2025 (55 kb)
      • 321313 - Concrete Paving Uploaded: 4/15/2025 (72 kb)
      • 321723 - Pavement Markings Uploaded: 4/15/2025 (64 kb)
      • 323100 - Steel Ornamental Fence Uploaded: 4/15/2025 (124 kb)
      • 323110 - Industrial Aluminum Gate Uploaded: 4/15/2025 (74 kb)
      • 323113 - Chain Link Fences and Gates Uploaded: 4/15/2025 (51 kb)
      • 323120 - High Speed Slide Gate Operator Uploaded: 4/15/2025 (55 kb)
      • 323223 - Segmental Retaining Walls Uploaded: 4/15/2025 (60 kb)
      • 323300 Site Furnishings Strada Uploaded: 4/15/2025 (88 kb)
      • 329115 Soil Preparation Performance Specification Strada Uploaded: 4/15/2025 (180 kb)
      • 329200 Turf and Grasses Strada Uploaded: 4/15/2025 (124 kb)
      • 329300 Plants Strada Uploaded: 4/15/2025 (174 kb)
    • DIV 31
      • 310516 - Aggregate Uploaded: 4/15/2025 (46 kb)
      • 311000 - Site Clearing Uploaded: 4/15/2025 (47 kb)
      • 312000 - Earth Moving Uploaded: 4/15/2025 (96 kb)
    • South Bld
      • DIV 2
        • 024119 Selective Demolition Uploaded: 4/15/2025 (118 kb)
        • 028000 Asbestos Abatement CCA Harrisburg 02-17-25 Uploaded: 4/15/2025 (322 kb)
      • DIV 14
        • 142400 Hydraulic Elevators Uploaded: 4/15/2025 (184 kb)
      • DIV 22
        • 220010 Plumbing General Requirements Uploaded: 4/15/2025 (29 kb)
        • 220513 Common Motor Requirements for Plumbing Equipment Uploaded: 4/15/2025 (10 kb)
        • 220517 Sleeves and Sleeve Seals for Plumbing Piping Uploaded: 4/15/2025 (18 kb)
        • 220518 Escutcheons for Plumbing Piping Uploaded: 4/15/2025 (14 kb)
        • 220523.12 Ball Valves for Plumbing Piping Uploaded: 4/15/2025 (16 kb)
        • 220523.14 Check Valves for Plumbing Piping Uploaded: 4/15/2025 (16 kb)
        • 220529 Hangers and Supports for Plumbing Piping and Equipment Uploaded: 4/15/2025 (47 kb)
        • 220553 Identification for Plumbing Piping and Equipment Uploaded: 4/15/2025 (18 kb)
        • 220719 Plumbing Piping Insulation Uploaded: 4/15/2025 (66 kb)
        • 220800 Commissioning of Plumbing Uploaded: 4/15/2025 (23 kb)
        • 220801 Operation and Maintenance Data Uploaded: 4/15/2025 (42 kb)
        • 221116 Domestic Water Piping Uploaded: 4/15/2025 (28 kb)
        • 221119 Domestic Water Piping Specialties Uploaded: 4/15/2025 (21 kb)
        • 221316 Sanitary Waste and Vent Piping Uploaded: 4/15/2025 (37 kb)
        • 221319 Sanitary Waste Piping Specialties Uploaded: 4/15/2025 (20 kb)
        • 221319.13 Sanitary Drains Uploaded: 4/15/2025 (10 kb)
        • 221413 Facility Storm Drainage Piping Uploaded: 4/15/2025 (35 kb)
        • 221423 Storm Drainage Piping Specialties Uploaded: 4/15/2025 (13 kb)
        • 221429 Sump Pumps Uploaded: 4/15/2025 (9 kb)
        • 223300 Electric Domestic-Water Heaters Uploaded: 4/15/2025 (28 kb)
        • 224213.13 Commercial Water Closets Uploaded: 4/15/2025 (18 kb)
        • 224213.16 Commercial Urinals Uploaded: 4/15/2025 (12 kb)
        • 224216.13 Commercial Lavatories Uploaded: 4/15/2025 (20 kb)
        • 224216.16 Commercial Sinks Uploaded: 4/15/2025 (19 kb)
        • 224713 Drinking Fountains Uploaded: 4/15/2025 (14 kb)
      • DIV 9
        • 092116.23 Gypsum Board Shaft Wall Assemblies Uploaded: 4/15/2025 (106 kb)
        • 092216 Non-Structural Metal Framing Uploaded: 4/15/2025 (123 kb)
        • 092900 Gypsum Board Uploaded: 4/15/2025 (116 kb)
        • 093013 Ceramic Tiling Uploaded: 4/15/2025 (135 kb)
        • 095113 Acoustical Panel Ceilings Uploaded: 4/15/2025 (140 kb)
        • 095133.21 Torsion Ceiling System Uploaded: 4/15/2025 (124 kb)
        • 095300 Acoustical Suspension Ceiling Assemblies Uploaded: 4/15/2025 (80 kb)
        • 096500 Resilient Flooring Uploaded: 4/15/2025 (131 kb)
        • 096513 Resilient Base and Accessories Uploaded: 4/15/2025 (106 kb)
        • 096519 Resilient Tile Flooring Uploaded: 4/15/2025 (101 kb)
        • 096813 Tile Carpeting Uploaded: 4/15/2025 (108 kb)
        • 097200 Wall Coverings Uploaded: 4/15/2025 (86 kb)
        • 098316 Spray-On System Uploaded: 4/15/2025 (110 kb)
        • 098433.11 Sound-Absorbing Wall Panels Uploaded: 4/15/2025 (98 kb)
        • 098433.12 Acoustical Wall Panels Uploaded: 4/15/2025 (57 kb)
        • 098433.13 Acoustical Wall Panels Uploaded: 4/15/2025 (81 kb)
        • 099123 Interior Painting Uploaded: 4/15/2025 (148 kb)
        • 099600 High Performance Paints Uploaded: 4/15/2025 (156 kb)
      • DIV 21
        • 210010 Fire Protection General Requirements Uploaded: 4/15/2025 (30 kb)
        • 210517 Sleeves and Sleeve Seals for Fire-Suppression Piping Uploaded: 4/15/2025 (19 kb)
        • 210518 Escutcheons for Fire-Suppression Piping Uploaded: 4/15/2025 (13 kb)
        • 210523 General-Duty Valves for Fire Protection Piping Uploaded: 4/15/2025 (20 kb)
        • 210529 Hangers and Supports for Fire Suppression Piping and Equipment Uploaded: 4/15/2025 (28 kb)
        • 210553 Identification for Fire-Suppression Piping and Equipment Uploaded: 4/15/2025 (20 kb)
        • 211313 Wet-Pipe Sprinkler Systems Uploaded: 4/15/2025 (39 kb)
      • DIV 8
        • 081113 Hollow Metal Doors and Frames Uploaded: 4/15/2025 (161 kb)
        • 081216 Interior Aluminum and Glass Framing System Uploaded: 4/15/2025 (120 kb)
        • 081416 Flush Wood Doors Uploaded: 4/15/2025 (118 kb)
        • 083113 Access Doors and Frames Uploaded: 4/15/2025 (96 kb)
        • 084113 Exterior Aluminum-Framed Entrances and Storefronts Uploaded: 4/15/2025 (144 kb)
        • 084413 Glazed Aluminum Curtain Walls Uploaded: 4/15/2025 (148 kb)
        • 087100 Door Hardware Uploaded: 4/15/2025 (317 kb)
        • 087113 Automatic Door Operators Uploaded: 4/15/2025 (111 kb)
        • 088000 Glazing Uploaded: 4/15/2025 (151 kb)
        • 088300 Mirrors Uploaded: 4/15/2025 (101 kb)
      • DIV 7
        • 070150.19 Preparation for Reroofing Uploaded: 4/15/2025 (119 kb)
        • 071416 Cold Fluid-Applied Waterproofing Uploaded: 4/15/2025 (113 kb)
        • 072100 Thermal Insulation Uploaded: 4/15/2025 (103 kb)
        • 074100 Preformed Metal Standing Seam Roof Uploaded: 4/15/2025 (129 kb)
        • 074213.13 Formed Metal Wall Panels Uploaded: 4/15/2025 (133 kb)
        • 075423 Thermoplastic-Polyolefin TPO Roofing Uploaded: 4/15/2025 (165 kb)
        • 076200 Sheet Metal Flashing and Trim Uploaded: 4/15/2025 (149 kb)
        • 077100 Roof Specialties Uploaded: 4/15/2025 (131 kb)
        • 077200 Roof Accessories Uploaded: 4/15/2025 (123 kb)
        • 078443 Joint Firestopping Uploaded: 4/15/2025 (123 kb)
        • 079100 Preformed Joint Seals Uploaded: 4/15/2025 (88 kb)
        • 079200 Joint Sealants Uploaded: 4/15/2025 (164 kb)
      • DIV 10
        • 101423 Panel Signage Uploaded: 4/15/2025 (90 kb)
        • 102113.19 Plastic Toilet Compartments Uploaded: 4/15/2025 (106 kb)
        • 102600 Wall and Door Protection Uploaded: 4/15/2025 (102 kb)
        • 102800 Toilet Bath and Laundry Accessories Uploaded: 4/15/2025 (101 kb)
        • 104413 Fire Protection Cabinets Uploaded: 4/15/2025 (89 kb)
        • 104416 Fire Extinguishers Uploaded: 4/15/2025 (86 kb)
      • DIV 28
        • 284621.11 Addressable Fire-Alarm Systems Uploaded: 4/15/2025 (62 kb)
      • DIV 27
        • 270526 Grounding and Bonding for Communications Systems Uploaded: 4/15/2025 (33 kb)
        • 270528 Pathways for Communications Systems Uploaded: 4/15/2025 (29 kb)
        • 270529 Hangers and Supports for Communications Systems Uploaded: 4/15/2025 (24 kb)
        • 270544 Sleeves and Sleeve Seals for Communications Pathways and Cabling Uploaded: 4/15/2025 (19 kb)
      • DIV 13
        • 134800 Sound Control Access Systems Uploaded: 4/15/2025 (103 kb)
        • 134800.1 Sound Control Window Systems Uploaded: 4/15/2025 (103 kb)
      • DIV 26
        • 260010 Electrical General Requirements Uploaded: 4/15/2025 (31 kb)
        • 260519 Low-Voltage Electrical Power Conductors and Cables Uploaded: 4/15/2025 (29 kb)
        • 260526 Grounding and Bonding for Electrical Systems Uploaded: 4/15/2025 (29 kb)
        • 260529 Hangers and Supports for Electrical Systems Uploaded: 4/15/2025 (23 kb)
        • 260533 Raceways and Boxes for Electrical Systems Uploaded: 4/15/2025 (53 kb)
        • 260544 Sleeves and Sleeve Seals for Electrical Raceways and Cabling Uploaded: 4/15/2025 (20 kb)
        • 260553 Identification for Electrical Systems Uploaded: 4/15/2025 (43 kb)
        • 260800 Commissioning of Electrical Systems Uploaded: 4/15/2025 (26 kb)
        • 260801 Operation and Maintenance Data Uploaded: 4/15/2025 (42 kb)
        • 260932 Distributed Digital Lighting Control System Uploaded: 4/15/2025 (348 kb)
        • 262416 Panelboards Uploaded: 4/15/2025 (36 kb)
        • 262726 Wiring Devices Uploaded: 4/15/2025 (30 kb)
        • 262816 Enclosed Switches and Circuit Brekers Uploaded: 4/15/2025 (15 kb)
        • 264100 Facility Lightning Protection Uploaded: 4/15/2025 (27 kb)
        • 265119 LED Interior Lighting Uploaded: 4/15/2025 (22 kb)
        • 265619 LED Exterior Lighting Uploaded: 4/15/2025 (32 kb)
      • DIV 12
        • 122200.1 Pipe Grid Uploaded: 4/15/2025 (71 kb)
        • 122200.2 Curtains Uploaded: 4/15/2025 (75 kb)
        • 122413 Roller Window Shades Uploaded: 4/15/2025 (96 kb)
        • 123661.16 Solid Surfacing Countertops Uploaded: 4/15/2025 (84 kb)
        • 123661.19 Quartz Agglomerate Countertops Uploaded: 4/15/2025 (96 kb)
      • DIV 23
        • 230010 Mechanical General Requirements Uploaded: 4/15/2025 (47 kb)
        • 230513 Common Motor Requirements for HVAC Equipment Uploaded: 4/15/2025 (44 kb)
        • 230516 Expansion Fittings and Loops for HVAC Piping Uploaded: 4/15/2025 (12 kb)
        • 230517 Sleeves and Sleeve Seals for HVAC Piping Uploaded: 4/15/2025 (22 kb)
        • 230518 Escutcheons for HVAC Piping Uploaded: 4/15/2025 (12 kb)
        • 230523 General-Duty Valves for HVAC Piping Uploaded: 4/15/2025 (31 kb)
        • 230529 Hangers and Supports for HVAC Piping and Equipment Uploaded: 4/15/2025 (51 kb)
        • 230530 HVAC Roof Accessories Uploaded: 4/15/2025 (62 kb)
        • 230548 Vibration Controls for HVAC Uploaded: 4/15/2025 (18 kb)
        • 230553 Identification for HVAC Piping and Equipment Uploaded: 4/15/2025 (34 kb)
        • 230593 Testing Adjusting and Balancing for HVAC Uploaded: 4/15/2025 (104 kb)
        • 230713 Duct Insulation Uploaded: 4/15/2025 (50 kb)
        • 230719 HVAC Piping Insulation Uploaded: 4/15/2025 (67 kb)
        • 230719 HVAC Piping Insulation VRF projects Uploaded: 4/15/2025 (69 kb)
        • 230800 Commissioning of HVAC Uploaded: 4/15/2025 (25 kb)
        • 230801 Operation and Maintenance Data Uploaded: 4/15/2025 (41 kb)
        • 230923 Direct Digital Control DDC System for HVAC Uploaded: 4/15/2025 (188 kb)
        • 232113 Hydronic Piping Uploaded: 4/15/2025 (54 kb)
        • 232116 Hydronic Piping Specialties Uploaded: 4/15/2025 (29 kb)
        • 232300 Refrigerant Piping Uploaded: 4/15/2025 (58 kb)
        • 233113 Metal Ducts Uploaded: 4/15/2025 (70 kb)
        • 233300 Air Duct Accessories Uploaded: 4/15/2025 (55 kb)
        • 233319 Duct Silencers Uploaded: 4/15/2025 (23 kb)
        • 233346 Flexible Ducts Uploaded: 4/15/2025 (14 kb)
        • 233423 HVAC Power Ventilators Uploaded: 4/15/2025 (28 kb)
        • 233713 Grilles Registers and Diffusers Uploaded: 4/15/2025 (12 kb)
        • 237433 Dedicated Outdoor-Air Units Uploaded: 4/15/2025 (62 kb)
        • 238126 Split-System Air-Conditioners Uploaded: 4/15/2025 (24 kb)
        • 238129 Variable-Refrigerant-Flow HVAC Systems Uploaded: 4/15/2025 (203 kb)
        • 238239 Wall Unit Heaters Uploaded: 4/15/2025 (13 kb)
      • DIV 6
        • 061053 Miscellaneous Rough Carpentry Uploaded: 4/15/2025 (112 kb)
        • 061600 Sheathing Uploaded: 4/15/2025 (109 kb)
        • 062023 Interior Finish Carpentry Uploaded: 4/15/2025 (99 kb)
        • 064116 Plastic-Laminate-Clad Architectural Cabinets Uploaded: 4/15/2025 (99 kb)
      • DIV 5
        • 051200 Structural Steel Framing Bala Uploaded: 4/15/2025 (116 kb)
        • 051213 Architecturally Exposed Structural Steel Framing Bala Uploaded: 4/15/2025 (110 kb)
        • 052100 Steel Joist Framing Bala Uploaded: 4/15/2025 (99 kb)
        • 053100 Steel Decking Bala Uploaded: 4/15/2025 (151 kb)
        • 054000 Cold-Formed Metal Framing Bala Uploaded: 4/15/2025 (140 kb)
        • 055113 Metal Pan Stairs Bala Uploaded: 4/15/2025 (172 kb)
        • 055213 Pipe and Tube Railings Uploaded: 4/15/2025 (108 kb)
        • 057313 Glazed Decorative Metal Railings Uploaded: 4/15/2025 (132 kb)
        • 057500 Decorative Formed Metal Uploaded: 4/15/2025 (97 kb)
      • DIV 4
        • 042000 Unit Masonry Bala Uploaded: 4/15/2025 (171 kb)
        • 042613 Masonry Veneer Uploaded: 4/15/2025 (171 kb)
        • 047200 Cast Stone Masonry Uploaded: 4/15/2025 (100 kb)
      • DIV 3
        • 032000 Concrete Reinforcing Bala Uploaded: 4/15/2025 (98 kb)
        • 033000 Cast-In-Place Concrete Bala Uploaded: 4/15/2025 (212 kb)
        • 034900 Glass-Fiber-Reinforced Concrete GFRC Uploaded: 4/15/2025 (107 kb)
    • DIV 48
      • 481400N_ Solar Panel System IFB-20250411 Uploaded: 4/15/2025 (88 kb)
    • DIV 33
      • 331000 - Water Utilities Uploaded: 4/15/2025 (96 kb)
      • 333000 - Sanitary Sewerage Uploaded: 4/15/2025 (80 kb)
      • 334000 - Stormwater Utilities Uploaded: 4/15/2025 (92 kb)
    • North Bld
      • DIV 10
        • 10 2113-19N_Plastic Toilet Compartments Uploaded: 4/15/2025 (33 kb)
        • 10 2213N_Wire Mesh Partitions Uploaded: 4/15/2025 (54 kb)
        • 10 2600N_Wall and Door Protection Uploaded: 4/15/2025 (35 kb)
        • 10 2800N_Toilet and Bath Accessories Uploaded: 4/15/2025 (29 kb)
        • 10 4413N_Fire Extinguisher Cabinets Uploaded: 4/15/2025 (40 kb)
        • 10 4416N_Fire Extinguishers Uploaded: 4/15/2025 (28 kb)
        • 10 7300N_Prefabricated Custom Awning Uploaded: 4/15/2025 (48 kb)
        • 10 7413N_TEMP PH Uploaded: 4/15/2025 (70 kb)
        • 10 7713N_Bollard Covers Uploaded: 4/15/2025 (21 kb)
      • DIV 4
        • 04 2200N_Concrete Unit Masonry Uploaded: 4/15/2025 (96 kb)
        • 04 2613N_Masonry Veneer Uploaded: 4/15/2025 (73 kb)
        • 04 7200N_Cast Stone Masonry Uploaded: 4/15/2025 (29 kb)
      • DIV 3
        • 03 3000_Cast-In-Place Concrete Uploaded: 4/15/2025 (214 kb)
        • 03 4100_Precast Structural Concrete Uploaded: 4/15/2025 (175 kb)
        • 03 4500N_Precast Architectural Concrete Uploaded: 4/15/2025 (112 kb)
      • DIV 12
        • 12 2413N_Roller Window Shades Uploaded: 4/15/2025 (32 kb)
      • DIV 11
        • 11 1300N_Loading Dock Equip Uploaded: 4/15/2025 (49 kb)
        • 11 3100N_Residential Appliances Uploaded: 4/15/2025 (25 kb)
        • 11 5353N_Trolly Hoist Uploaded: 4/15/2025 (39 kb)
      • DIV 5
        • 05 1200_Structural Steel Uploaded: 4/15/2025 (138 kb)
        • 05 2000_Steel Joists Uploaded: 4/15/2025 (48 kb)
        • 05 3000_Metal Decking Uploaded: 4/15/2025 (118 kb)
        • 05 4000N_Cold Formed Metal Framing Uploaded: 4/15/2025 (75 kb)
        • 05 5100N_Metal Stairs and Railings Uploaded: 4/15/2025 (71 kb)
        • 05 5113N_Prefab Alum Access Ladders Uploaded: 4/15/2025 (51 kb)
        • 05 5213N_Pipe and Tube Railings Uploaded: 4/15/2025 (73 kb)
        • 05 5600N_Safety Rails Uploaded: 4/15/2025 (50 kb)
      • DIV 13
        • 13 1116N_Computer Room Air Containment Sys Uploaded: 4/15/2025 (126 kb)
        • 13 3419N_Prefabricated Sound Walls Uploaded: 4/15/2025 (54 kb)
        • 13 3433N_Prefabricated Penthouse Enclosure Uploaded: 4/15/2025 (70 kb)
      • DIV 7
        • 07 1313N_Under Slab Vapor Barrier Uploaded: 4/15/2025 (38 kb)
        • 07 1350N_Below Grade Waterproofing System Uploaded: 4/15/2025 (46 kb)
        • 07 2100N_Thermal Insulation Uploaded: 4/15/2025 (53 kb)
        • 07 4213.13N_Formed Metal Wall Panels Uploaded: 4/15/2025 (56 kb)
        • 07 5013N_IRMA Roofing System Uploaded: 4/15/2025 (78 kb)
        • 07 5423N_Thermoplastic-Polyolefin TPO Roofing Uploaded: 4/15/2025 (131 kb)
        • 07 6200N_Sheet Metal Flashing and Trim Uploaded: 4/15/2025 (66 kb)
        • 07 7100N_Roofing Specialities Uploaded: 4/15/2025 (51 kb)
        • 07 7213N_Prefabricated Roof Penetration Housing Uploaded: 4/15/2025 (24 kb)
        • 07 8100N_Applied Fireproofing Uploaded: 4/15/2025 (63 kb)
        • 07 8413N_Penetration Firestopping Uploaded: 4/15/2025 (88 kb)
        • 07 9200N_Joint Sealants Uploaded: 4/15/2025 (69 kb)
      • DIV 6
        • 06 1000N_Rough Carpentry Uploaded: 4/15/2025 (62 kb)
        • 06 4023N_Interior Architectural Woodwork Uploaded: 4/15/2025 (111 kb)
      • DIV 21
        • 21 05 00N_Common Work Results for Fire Suppress Uploaded: 4/15/2025 (52 kb)
        • 21 05 48N_ Vib Contr for Fire-Supp. Piping Uploaded: 4/15/2025 (117 kb)
        • 21 13 13N_ Wet Pipe Sprinkler Systems Uploaded: 4/15/2025 (92 kb)
        • 21 13 16N_Pipe and single interlocked Uploaded: 4/15/2025 (232 kb)
      • DIV 9
        • 09 2216N_Non Structural Metal Framing Uploaded: 4/15/2025 (51 kb)
        • 09 2900N_Gypsum Board Uploaded: 4/15/2025 (67 kb)
        • 09 3000N_Tiling Uploaded: 4/15/2025 (74 kb)
        • 09 5123N_Acoustic Tile Ceilings Uploaded: 4/15/2025 (66 kb)
        • 09 6513N_Resilient Base and Accessories Uploaded: 4/15/2025 (37 kb)
        • 09 6813N_Tile Carpeting Uploaded: 4/15/2025 (45 kb)
        • 09 6900N_Access Flooring Uploaded: 4/15/2025 (68 kb)
        • 09 7713N_Stretch Fabric Wall System Uploaded: 4/15/2025 (58 kb)
        • 09 9113N_Exterior Painting Uploaded: 4/15/2025 (54 kb)
        • 09 9600_High Performance Coatings Uploaded: 4/15/2025 (58 kb)
      • DIV 2
        • 02 4116N_Structure Demolition Uploaded: 4/15/2025 (44 kb)
      • DIV 8
        • 08 1113N_Hollow Metal Doors and Frames Uploaded: 4/15/2025 (77 kb)
        • 08 1216N_Interior Aluminum and Glass Framing System Uploaded: 4/15/2025 (53 kb)
        • 08 3113N_Access Doors and Frames Uploaded: 4/15/2025 (33 kb)
        • 08 3323N_Overhead Coiling Doors Uploaded: 4/15/2025 (53 kb)
        • 08 4233N_Revolving Security Door Uploaded: 4/15/2025 (58 kb)
        • 08 5113N_Fixed AluminumWindow Units Uploaded: 4/15/2025 (50 kb)
        • 08 7100N_Door Hardware Uploaded: 4/15/2025 (113 kb)
        • 08 7113N_Hardware Sets Uploaded: 4/15/2025 (44 kb)
        • 08 8000N_Glazing Uploaded: 4/15/2025 (73 kb)
        • 08 8836N_Switchable Privacy Glazing Uploaded: 4/15/2025 (36 kb)
        • 08 9000N_Louvers Uploaded: 4/15/2025 (53 kb)
      • DIV 23
        • 23 01 10N_Basic Mechanical Requirements Uploaded: 4/15/2025 (80 kb)
        • 23 01 11N_Basic Mechanical Materials Uploaded: 4/15/2025 (44 kb)
        • 23 01 12N_Basic Piping Materials Uploaded: 4/15/2025 (52 kb)
        • 23 05 13N_Common Motor Requirements Uploaded: 4/15/2025 (64 kb)
        • 23 05 14N_Variable Frequency Drives Uploaded: 4/15/2025 (93 kb)
        • 23 05 19N_Meters Gages-HVAC Piping Uploaded: 4/15/2025 (42 kb)
        • 23 05 23N_General Duty Valves-HVAC Piping Uploaded: 4/15/2025 (64 kb)
        • 23 05 29N_Hangers Supports Uploaded: 4/15/2025 (89 kb)
        • 23 05 33N_Heat Tracing-Fuel Oil Piping Uploaded: 4/15/2025 (64 kb)
        • 23 05 34N_Electric Heating Uploaded: 4/15/2025 (42 kb)
        • 23 05 35N_ Snow Melting System Uploaded: 4/15/2025 (68 kb)
        • 23 05 48N_Noise Vibration and Seismic Controls Uploaded: 4/15/2025 (80 kb)
        • 23 05 53N_Identification-HVAC Uploaded: 4/15/2025 (59 kb)
        • 23 05 93N_Testing Adjusting and Balancing Uploaded: 4/15/2025 (98 kb)
        • 23 07 00N_HVAC Insulation Uploaded: 4/15/2025 (148 kb)
        • 23 08 00N_Commissioning of HVAC Uploaded: 4/15/2025 (50 kb)
        • 23 09 00N_Building Mgmt System Uploaded: 4/15/2025 (282 kb)
        • 23 10 00N_Fuel Oil System Uploaded: 4/15/2025 (166 kb)
        • 23 10 10N_Fuel Oil Piping Uploaded: 4/15/2025 (76 kb)
        • 23 21 13N_Hydronic Piping Uploaded: 4/15/2025 (99 kb)
        • 23 21 16N_Hydronic Piping Specialities Uploaded: 4/15/2025 (69 kb)
        • 23 22 13N_Steam and Condensate Piping Uploaded: 4/15/2025 (76 kb)
        • 23 23 00N_Refrigerant Piping Uploaded: 4/15/2025 (69 kb)
        • 23 31 13N_Metal Ducts Uploaded: 4/15/2025 (108 kb)
        • 23 33 00N_Air Duct Uploaded: 4/15/2025 (91 kb)
        • 23 33 19N_HVAC Silencers Uploaded: 4/15/2025 (43 kb)
        • 23 34 23N_HVAC Power Ventilators Uploaded: 4/15/2025 (85 kb)
        • 23 37 00N_Air Outlets Uploaded: 4/15/2025 (39 kb)
        • 23 74 13N_Package Roof Top Air Conditioners Uploaded: 4/15/2025 (110 kb)
        • 23 81 23N_Computer Room Air Conditioners Units Uploaded: 4/15/2025 (103 kb)
        • 23 81 25N_XDM Split Indoor Chiller Uploaded: 4/15/2025 (138 kb)
        • 23 81 26N_HVAC Variable Refrigrt Flow VRF Uploaded: 4/15/2025 (137 kb)
        • 23 81 27N_Air Cooled Direct Expansion Split-Sys Uploaded: 4/15/2025 (77 kb)
        • 23 81 35N_In-Row Cooling Unit Uploaded: 4/15/2025 (185 kb)
        • 23 84 13N_Humidifiers Uploaded: 4/15/2025 (45 kb)
      • DIV 22
        • 22 05 00N_ Common Work Results for Plumbing Uploaded: 4/15/2025 (67 kb)
        • 22 05 16N_ Expansion Fittings Loops for Plumb Piping Uploaded: 4/15/2025 (28 kb)
        • 22 05 19N_ Meters and Gauges for Plumbing Piping Uploaded: 4/15/2025 (44 kb)
        • 22 05 23N_ General Duty Valves for Plumbing Piping Uploaded: 4/15/2025 (34 kb)
        • 22 05 29N_ Hangers and Supports for Plumb Piping Uploaded: 4/15/2025 (58 kb)
        • 22 05 33N_ Heat Tracing for Plumbing Piping Uploaded: 4/15/2025 (55 kb)
        • 22 05 48N_ Vib Controls for Plumb Piping Uploaded: 4/15/2025 (45 kb)
        • 22 05 53N_ Identification for Plumb Pipe Uploaded: 4/15/2025 (36 kb)
        • 22 07 00N_ Plumbing Insulation Uploaded: 4/15/2025 (89 kb)
        • 22 11 16N_ Domestic Water Piping Uploaded: 4/15/2025 (88 kb)
        • 22 11 19N_ Domestic Water Piping Specialties Uploaded: 4/15/2025 (52 kb)
        • 22 13 16N_ Sanitary Waste and Vent Piping Uploaded: 4/15/2025 (73 kb)
        • 22 13 19N_ Sanitay Waste Piping Specialties Uploaded: 4/15/2025 (48 kb)
        • 22 33 00N_ Electric Domestic Water Heaters Uploaded: 4/15/2025 (42 kb)
        • 22 40 00N_ Plumbing Fixtures Uploaded: 4/15/2025 (46 kb)
      • DIV 28
        • 28 31 00-0822 Fire Detection and Alarm Uploaded: 4/15/2025 (173 kb)
      • DIV 26
        • 26 00 10-0822 Basic Electrical Req Uploaded: 4/15/2025 (76 kb)
        • 26 00 20-0822 Electrical PrePurchase Req Uploaded: 4/15/2025 (22 kb)
        • 26 00 30-0822 Standards Uploaded: 4/15/2025 (15 kb)
        • 26 00 40-0822 Miscellaneous Work Uploaded: 4/15/2025 (36 kb)
        • 26 00 60-0822 Mats and Pads Uploaded: 4/15/2025 (26 kb)
        • 26 05 13-0822 Medium Voltage Cables Uploaded: 4/15/2025 (44 kb)
        • 26 05 19-0822 Low Voltage Power Conductors Uploaded: 4/15/2025 (40 kb)
        • 26 05 20-0822 DLO Cable Uploaded: 4/15/2025 (24 kb)
        • 26 05 26-0822 Grounding and Bonding Sys Uploaded: 4/15/2025 (44 kb)
        • 26 05 28-0822 Soil Resisitvity Testing Uploaded: 4/15/2025 (18 kb)
        • 26 05 29-0822 Hangers and Supports Uploaded: 4/15/2025 (34 kb)
        • 26 05 34-0822 Raceways for Electrical Sys Uploaded: 4/15/2025 (58 kb)
        • 26 05 35-0822 Boxes for Electrical Sys Uploaded: 4/15/2025 (23 kb)
        • 26 05 36-0822 Cable Trays Uploaded: 4/15/2025 (31 kb)
        • 26 05 37-0822 Wire Basket Uploaded: 4/15/2025 (33 kb)
        • 26 05 48-0822 Vibr and Seismic Controls Uploaded: 4/15/2025 (47 kb)
        • 26 05 53-0822 Identification of Electrical Sys Uploaded: 4/15/2025 (40 kb)
        • 26 05 73-0822 AFSCCS Study Uploaded: 4/15/2025 (13 kb)
        • 26 08 10-0822 Commissioning Uploaded: 4/15/2025 (59 kb)
        • 26 09 13-0822 Electrical Power Monitoring Uploaded: 4/15/2025 (75 kb)
        • 26 12 15-0822 Liquid Filled Pad Mtd Uploaded: 4/15/2025 (54 kb)
        • 26 13 21-0822 Metal Enclosed Load Interrupter Switchgear Uploaded: 4/15/2025 (407 kb)
        • 26 20 10-0822 Portable Load Bank Uploaded: 4/15/2025 (37 kb)
        • 26 20 11-0822 Radiator Load Bank Uploaded: 4/15/2025 (45 kb)
        • 26 22 00-0822 Low Voltage Transformers Uploaded: 4/15/2025 (29 kb)
        • 26 23 00-0822 Low Voltage Swgr Uploaded: 4/15/2025 (510 kb)
        • 26 24 13-0822 Low Voltage Group Mtd Uploaded: 4/15/2025 (61 kb)
        • 26 24 16-0822 Panelboards Uploaded: 4/15/2025 (40 kb)
        • 26 25 00-0822 Enclosed Bus Assemblies Uploaded: 4/15/2025 (32 kb)
        • 26 25 01-0822 Critical Busway Assemblies Uploaded: 4/15/2025 (84 kb)
        • 26 26 00-0822 PDUs Uploaded: 4/15/2025 (78 kb)
        • 26 27 26-0822 Wiring Devices Uploaded: 4/15/2025 (41 kb)
        • 26 28 00-0822 Low Voltage Circuit Protective Devices Uploaded: 4/15/2025 (36 kb)
        • 26 28 16-0822 Enclosed Switches and Circuit Breakers Uploaded: 4/15/2025 (26 kb)
        • 26 32 00-0822 Generators Uploaded: 4/15/2025 (440 kb)
        • 26 32 10-0822 Generator Control Swgr Uploaded: 4/15/2025 (580 kb)
        • 26 33 02-0822 Lithium Batteries Uploaded: 4/15/2025 (38 kb)
        • 26 33 53-0822 CRITICAL UPS Uploaded: 4/15/2025 (534 kb)
        • 26 33 54-0822 UPS Uploaded: 4/15/2025 (138 kb)
        • 26 41 00-0822 Facility Lightning Protection Uploaded: 4/15/2025 (33 kb)
        • 26 43 13-0822 Surge Supression Uploaded: 4/15/2025 (51 kb)
    • ARM Group LLC Geotechnical Engineering Report 10.21.2024 Uploaded: 4/15/2025 (7945 kb)
    • ARM Group LLC Hazmat Survey Report Final 11.07.2023 Uploaded: 4/15/2025 (18380 kb)
    • ARM Group LLC Phase I ESA Report 11.3.2023 Uploaded: 4/15/2025 (23009 kb)
    • ARM Group LLC Phase II Limited ESA Soil Vapor Report 11.9.2023 Uploaded: 4/15/2025 (1451 kb)

Project Info

Project #
Project Name CCA 25th Street Harrisburg
Location Harrisburg, PA
Address Map It 555 South 25th Street
City Harrisburg
State PA
Zip 17104
Bid Date May 22, 2025
Bid Time 2:00 PM
 
Scope eci construction is seeking bids for The Commonwealth Charter Academy Renovations/Addition.

 This Project consists of the demolition of a portion of an existing primary school building 
and the construction of a new building (North Building) adjacent to the existing building, 
which is being renovated (South Building) as well. This will include, but are not limited to:  Demolition, Foundations, bearing precast walls, structural steel framing/ roof framing/composite roof deck, cmu & gwb/metal stud partitions, GWB & ACT suspended ceilings, Interior/exterior doors, windows, hardware and architectural fitting and finishes.

 Prebid Meeting: Initial Prebid meeting for all bidders will be held at 555 S. 25th Street, 
Harrisburg, PA 17104; 11:00 AM, local time on April 22, 2025. A second Walkthrough will be 
held at 11 AM, on May 6, 2025. 
  • Duration: 427 Calendar Days from NTP
  • Prevailing Wages Apply
  • 4  Alternates (Spec 012300)
  • Multi Prime Project
  • RFI Deadline 7 Days Prior of the bid date.
  • Our bids are due to the owner on May 22nd, 2025, at 2PM. Please have bids to us no later than Wednesday, May 21st, 2025, at 2pm.
  • Please respond with your intentions to bid by clicking YES, NO, UNSURE on the Invitation. 
Plans All Plans and Specs are available in the Pipeline Plan Room for this project.


Other Info Project Contacts:

Brandon
 Stum:
 bws@eciconstruction.com or 717-638-3332 - Divisions 2, 6, 7, 8, 9, 10, 11 & 12

Nate Goodyear:
 neg@eciconstruction.com or 717-638-3321 - Divisions 3, 4, 5, 31 & 32

Notices

If you are looking for attached files related to a Notice, go back to the Home tab ("Project Files" are on the right side).
Title Created By Created On
Invite Typo's Brandon Stum 4/15/2025

If you have project-related questions, please contact your contractor or use the "Submit Question" tab.
If you are having technical difficulties downloading, please email support@pipelinesuite.com or call 949-222-0400.