Conewago Valley School District E.S. Additions and Renovations

Project Files

  • Plans
    • 11 Plumbing
      • 171-P0.1-Notes Uploaded: 4/18/2025 (136 kb)
      • 172-P0.2-ProposedSite Uploaded: 4/18/2025 (393 kb)
      • 173-P1.1-Demo Uploaded: 4/18/2025 (241 kb)
      • 174-P1.2-Demo Uploaded: 4/18/2025 (304 kb)
      • 175-P1.3-Demo Uploaded: 4/18/2025 (308 kb)
      • 176-P2.1-Piping Uploaded: 4/18/2025 (523 kb)
      • 177-P2.2-Piping Uploaded: 4/18/2025 (292 kb)
      • 178-P2.3-Piping Uploaded: 4/18/2025 (676 kb)
      • 179-P2.4-Piping Uploaded: 4/18/2025 (544 kb)
      • 180-P2.5-GndAnd2ndFl Uploaded: 4/18/2025 (682 kb)
      • 181-P3.1-Sanitary Uploaded: 4/18/2025 (581 kb)
      • 182-P3.2-Sanitary Uploaded: 4/18/2025 (376 kb)
      • 183-P3.3-Sanitary Uploaded: 4/18/2025 (750 kb)
      • 184-P3.4-Sanitary Uploaded: 4/18/2025 (759 kb)
      • 185-P3.6-Roof Uploaded: 4/18/2025 (296 kb)
      • 186-P4.1-Enlarged Uploaded: 4/18/2025 (704 kb)
      • 187-P4.2-Enlarged Uploaded: 4/18/2025 (582 kb)
      • 188-P5.1-Dtls Uploaded: 4/18/2025 (175 kb)
    • 10 Mechanical
      • 151-M0.1-Notes Uploaded: 4/18/2025 (140 kb)
      • 152-M1.1-Demo Uploaded: 4/18/2025 (245 kb)
      • 153-M1.2-Demo Uploaded: 4/18/2025 (268 kb)
      • 154-M1.3-Demo Uploaded: 4/18/2025 (323 kb)
      • 155-M2.1-1stFl Uploaded: 4/18/2025 (578 kb)
      • 156-M2.2-1stFl Uploaded: 4/18/2025 (384 kb)
      • 157-M2.3-1stFl Uploaded: 4/18/2025 (764 kb)
      • 158-M2.4-1stFl Uploaded: 4/18/2025 (603 kb)
      • 159-M2.5-GndAnd2ndFl Uploaded: 4/18/2025 (1517 kb)
      • 160-M3.1-Piping Uploaded: 4/18/2025 (830 kb)
      • 161-M3.2-Piping Uploaded: 4/18/2025 (309 kb)
      • 162-M3.3-Piping Uploaded: 4/18/2025 (1939 kb)
      • 163-M3.4-Piping Uploaded: 4/18/2025 (1121 kb)
      • 164-M3.5-Piping Uploaded: 4/18/2025 (1359 kb)
      • 165-M4.1-Roof Uploaded: 4/18/2025 (402 kb)
      • 166-M5.1-MechRm Uploaded: 4/18/2025 (398 kb)
      • 167-M5.2-BldSec Uploaded: 4/18/2025 (695 kb)
      • 168-M6.1-Schedules Uploaded: 4/18/2025 (165 kb)
      • 169-M6.2-Dtls Uploaded: 4/18/2025 (205 kb)
      • 170-M6.3-Dtls Uploaded: 4/18/2025 (212 kb)
    • 04 Code
      • 029-CC0-Code Uploaded: 4/18/2025 (5460 kb)
      • 030-CC1-CodeCompliance Uploaded: 4/18/2025 (2701 kb)
    • 03 Civil
      • 007-C002-PCSMSupportInfo Uploaded: 4/18/2025 (2259 kb)
      • 008-C003-EandSSupportInfo Uploaded: 4/18/2025 (2248 kb)
      • 009-C101-Existing Uploaded: 4/18/2025 (1375 kb)
      • 010-C102-Demo Uploaded: 4/18/2025 (1437 kb)
      • 011-C103-Layout Uploaded: 4/18/2025 (1177 kb)
      • 012-C104-Grading Uploaded: 4/18/2025 (1498 kb)
      • 013-C104.1-Grading Uploaded: 4/18/2025 (1763 kb)
      • 014-C105-PCSM Uploaded: 4/18/2025 (1497 kb)
      • 015-C106-Utility Uploaded: 4/18/2025 (1479 kb)
      • 016-C107-Landscape Uploaded: 4/18/2025 (1698 kb)
      • 017-C301-StormProfiles Uploaded: 4/18/2025 (826 kb)
      • 018-C401-UtilityProfile Uploaded: 4/18/2025 (791 kb)
      • 019-C501-Dtls Uploaded: 4/18/2025 (914 kb)
      • 020-C502-Dtls Uploaded: 4/18/2025 (954 kb)
      • 021-C503-Dtls Uploaded: 4/18/2025 (854 kb)
      • 022-C504-Dtls Uploaded: 4/18/2025 (4244 kb)
      • 023-C601-Dtls Uploaded: 4/18/2025 (846 kb)
      • 024-C602-Dtls Uploaded: 4/18/2025 (1347 kb)
      • 025-C603-Dtls Uploaded: 4/18/2025 (1212 kb)
      • 026-C701-EandS Uploaded: 4/18/2025 (1604 kb)
      • 027-C702-Dtls Uploaded: 4/18/2025 (1203 kb)
      • 028-C703-Dtls Uploaded: 4/18/2025 (1189 kb)
      • Thumbs Uploaded: 4/18/2025 (16 kb)
    • 02 Phasing
      • 005-PH1.1-Phasing Uploaded: 4/18/2025 (2133 kb)
      • 006-PH1.2-Phasing Uploaded: 4/18/2025 (2825 kb)
    • 13 Electrical
      • 192-E0.1-SymbolSchedule Uploaded: 4/18/2025 (165 kb)
      • 193-E1.1-DemoSite Uploaded: 4/18/2025 (411 kb)
      • 194-E1.2-Site Uploaded: 4/18/2025 (344 kb)
      • 195-E2.1-Demo Uploaded: 4/18/2025 (1418 kb)
      • 196-E3.1-Lighting Uploaded: 4/18/2025 (534 kb)
      • 197-E3.2-Lighting Uploaded: 4/18/2025 (451 kb)
      • 198-E3.3-Lighting Uploaded: 4/18/2025 (497 kb)
      • 199-E3.4-Lighting Uploaded: 4/18/2025 (414 kb)
      • 200-E3.5-Lighting Uploaded: 4/18/2025 (386 kb)
      • 201-E4.1-Power Uploaded: 4/18/2025 (697 kb)
      • 202-E4.2-Power Uploaded: 4/18/2025 (288 kb)
      • 203-E4.3-Power Uploaded: 4/18/2025 (2167 kb)
      • 204-E4.4-Power Uploaded: 4/18/2025 (1365 kb)
      • 205-E4.5-Power Uploaded: 4/18/2025 (1017 kb)
      • 206-E4.6-Roof Uploaded: 4/18/2025 (210 kb)
      • 207-E5.1-MechElec Uploaded: 4/18/2025 (202 kb)
      • 208-E5.2-Office Uploaded: 4/18/2025 (411 kb)
      • 209-E6.1-FireAlarm Uploaded: 4/18/2025 (559 kb)
      • 210-E7.1-Clocks Uploaded: 4/18/2025 (559 kb)
      • 211-E8.1-Security Uploaded: 4/18/2025 (569 kb)
      • 212-E9.1-CableTray Uploaded: 4/18/2025 (506 kb)
      • 213-E10.1-PowerRiserDemo Uploaded: 4/18/2025 (119 kb)
      • 214-E10.2-PowerRiserDiagram Uploaded: 4/18/2025 (139 kb)
      • 215-E10.3-TelecomRiser Uploaded: 4/18/2025 (130 kb)
      • 216-E11.1-Dtls Uploaded: 4/18/2025 (184 kb)
      • 217-E11.2-Dtls Uploaded: 4/18/2025 (124 kb)
      • 218-E11.3-Dtls Uploaded: 4/18/2025 (124 kb)
      • 219-E11.4-Dtls Uploaded: 4/18/2025 (163 kb)
      • 220-E11.5-Dtls Uploaded: 4/18/2025 (124 kb)
    • 01 General
      • 0001-CoverV1 Uploaded: 4/18/2025 (210 kb)
      • 002-CS2-GenInfo Uploaded: 4/18/2025 (287 kb)
      • 003-CoverV2 Uploaded: 4/18/2025 (210 kb)
      • 004-CS2-GenInfoV2 Uploaded: 4/18/2025 (287 kb)
    • 12 Fire Protection
      • 189-PF0.1-Notes Uploaded: 4/18/2025 (405 kb)
      • 190-FP2.1-1stFl Uploaded: 4/18/2025 (527 kb)
      • 191-PF2.2-1stFl Uploaded: 4/18/2025 (398 kb)
    • 08 Food
      • 120-K101-KitchenEquip Uploaded: 4/18/2025 (684 kb)
      • 121-K300-Plumbing Uploaded: 4/18/2025 (536 kb)
      • 122-K400-Electrical Uploaded: 4/18/2025 (537 kb)
    • 07 Interior
      • 099-I4.1-Casework Uploaded: 4/18/2025 (926 kb)
      • 100-I4.2-HeadStart Uploaded: 4/18/2025 (290 kb)
      • 101-I4.3-KG Uploaded: 4/18/2025 (1080 kb)
      • 102-I4.3A-KGAlt Uploaded: 4/18/2025 (273 kb)
      • 103-I4.4-1stGrade Uploaded: 4/18/2025 (938 kb)
      • 104-I4.5-2ndGrade Uploaded: 4/18/2025 (504 kb)
      • 105-I4.6-3rdGrade Uploaded: 4/18/2025 (953 kb)
      • 106-I4.7-SpecialEd Uploaded: 4/18/2025 (713 kb)
      • 107-I4.8-SpecialEd Uploaded: 4/18/2025 (648 kb)
      • 108-I4.9-SpecialEd Uploaded: 4/18/2025 (616 kb)
      • 109-I4.10-SGI Uploaded: 4/18/2025 (574 kb)
      • 110-I4.11-CLA Uploaded: 4/18/2025 (402 kb)
      • 111-I4.12-Art Uploaded: 4/18/2025 (419 kb)
      • 112-I4.13-Media Uploaded: 4/18/2025 (432 kb)
      • 113-I4.13S-MediaAlt Uploaded: 4/18/2025 (5890 kb)
      • 114-I4.14-Admin Uploaded: 4/18/2025 (566 kb)
      • 115-I4.14S-Admin Uploaded: 4/18/2025 (493 kb)
      • 116-I4.15-Misc Uploaded: 4/18/2025 (578 kb)
      • 117-I4.16-Cafeteria Uploaded: 4/18/2025 (345 kb)
      • 118-I7.1-1stFlFlPatten Uploaded: 4/18/2025 (909 kb)
      • 119-I7.2-1stFlColor Uploaded: 4/18/2025 (1275 kb)
    • 06 Architectural
      • 037-A1.0-Floor Uploaded: 4/18/2025 (1792 kb)
      • 038-A1.1-1stFlA Uploaded: 4/18/2025 (1720 kb)
      • 039-A1.2-1stFlB Uploaded: 4/18/2025 (860 kb)
      • 040-A1.3-1stFlC Uploaded: 4/18/2025 (838 kb)
      • 041-A1.4-1stFlD Uploaded: 4/18/2025 (820 kb)
      • 042-A1.5-GndAnd2ndFl Uploaded: 4/18/2025 (1086 kb)
      • 043-A1.6-Roof Uploaded: 4/18/2025 (1223 kb)
      • 044-A1.7-RCP Uploaded: 4/18/2025 (2228 kb)
      • 045-A1.8-RCP Uploaded: 4/18/2025 (1222 kb)
      • 046-A1.9-RCP Uploaded: 4/18/2025 (846 kb)
      • 047-A1.10-RCP Uploaded: 4/18/2025 (720 kb)
      • 048-A2.1-ExtElev Uploaded: 4/18/2025 (1531 kb)
      • 049-A2.2-ExtElev Uploaded: 4/18/2025 (866 kb)
      • 050-A2.3-ExtElev Uploaded: 4/18/2025 (571 kb)
      • 051-A2.4-ExtElev Uploaded: 4/18/2025 (414 kb)
      • 052-A2.5-ExtElev Uploaded: 4/18/2025 (559 kb)
      • 053-A2.6-ExtElev Uploaded: 4/18/2025 (527 kb)
      • 054-A2.7-IntElevGym Uploaded: 4/18/2025 (1521 kb)
      • 055-A2.8-IntElevCafeteria Uploaded: 4/18/2025 (831 kb)
      • 056-A2.9-IntElevLobby Uploaded: 4/18/2025 (1086 kb)
      • 057-A2.10-IntElevColor Uploaded: 4/18/2025 (508 kb)
      • 058-A2.11-IntElevColor Uploaded: 4/18/2025 (495 kb)
      • 059-A2.12-IntElevColor Uploaded: 4/18/2025 (537 kb)
      • 060-A2.13-IntElevColor Uploaded: 4/18/2025 (386 kb)
      • 061-A3.1-BldSecs Uploaded: 4/18/2025 (1974 kb)
      • 062-A3.2-WallSec Uploaded: 4/18/2025 (1804 kb)
      • 063-A3.3-WallSec Uploaded: 4/18/2025 (1618 kb)
      • 064-A3.4-WallSec Uploaded: 4/18/2025 (1290 kb)
      • 065-A3.5-WallSec Uploaded: 4/18/2025 (1088 kb)
      • 066-A3.6-WallSec Uploaded: 4/18/2025 (957 kb)
      • 067-A3.7-WallSec Uploaded: 4/18/2025 (1006 kb)
      • 068-A3.8-WallSec Uploaded: 4/18/2025 (1123 kb)
      • 069-A3.9-WallSec Uploaded: 4/18/2025 (815 kb)
      • 070-A4.1-Toilet Uploaded: 4/18/2025 (860 kb)
      • 071-A4.2-Toilet Uploaded: 4/18/2025 (284 kb)
      • 072-A4.3-Ramp Uploaded: 4/18/2025 (710 kb)
      • 073-A4.4-Ramp Uploaded: 4/18/2025 (953 kb)
      • 074-A4.5-Gym Uploaded: 4/18/2025 (803 kb)
      • 075-A4.6-Courtyard Uploaded: 4/18/2025 (460 kb)
      • 076-A4.7-Dock Uploaded: 4/18/2025 (521 kb)
      • 077-A4.8-MechYard Uploaded: 4/18/2025 (411 kb)
      • 078-A4.9-Plaza Uploaded: 4/18/2025 (359 kb)
      • 079-A5.1-Dtls Uploaded: 4/18/2025 (784 kb)
      • 080-A5.2-Dtls Uploaded: 4/18/2025 (471 kb)
      • 081-A5.3-Dtls Uploaded: 4/18/2025 (388 kb)
      • 082-A5.4-Dtls Uploaded: 4/18/2025 (700 kb)
      • 083-A5.5-Dtls Uploaded: 4/18/2025 (239 kb)
      • 084-A5.6-RoofDtl Uploaded: 4/18/2025 (517 kb)
      • 085-A6.0-ColorSchemeSchedule Uploaded: 4/18/2025 (251 kb)
      • 086-A6.1-RmFinishSchedule Uploaded: 4/18/2025 (273 kb)
      • 087-A6.2-SignSchedule Uploaded: 4/18/2025 (280 kb)
      • 088-A6.3-SignSchedule Uploaded: 4/18/2025 (225 kb)
      • 089-A6.4-DoorSchedule Uploaded: 4/18/2025 (251 kb)
      • 090-A6.5-DoorSchedule Uploaded: 4/18/2025 (250 kb)
      • 091-A6.6-HMFrameDtl Uploaded: 4/18/2025 (416 kb)
      • 092-A6.7-HMFrameDtl Uploaded: 4/18/2025 (566 kb)
      • 093-A6.8-AlumStorefrontElev Uploaded: 4/18/2025 (342 kb)
      • 094-A6.9-AlumStorefrontElev Uploaded: 4/18/2025 (298 kb)
      • 095-A6.10-AlumStorefrontDtl Uploaded: 4/18/2025 (536 kb)
      • 096-A6.11-AlumStorefrontDlt Uploaded: 4/18/2025 (893 kb)
      • 097-A6.12-AlumStorefrontDtl Uploaded: 4/18/2025 (482 kb)
      • 098-A6.13-AlumStorefrontDtlExisting Uploaded: 4/18/2025 (536 kb)
    • 05 Demo
      • 031-D1.0-AlterationNotes Uploaded: 4/18/2025 (222 kb)
      • 032-D1.1-Demo Uploaded: 4/18/2025 (574 kb)
      • 033-D1.2-Demo Uploaded: 4/18/2025 (505 kb)
      • 034-D1.3-Demo Uploaded: 4/18/2025 (669 kb)
      • 035-D1.4-Demo Uploaded: 4/18/2025 (608 kb)
      • 036-D1.5-RoofDemo Uploaded: 4/18/2025 (338 kb)
    • 09 Structural
      • 123-S1.1-Foundation Uploaded: 4/18/2025 (858 kb)
      • 124-S1.2-Foundation Uploaded: 4/18/2025 (277 kb)
      • 125-S1.3-Foundation Uploaded: 4/18/2025 (343 kb)
      • 126-S1.4-Foundation Uploaded: 4/18/2025 (1205 kb)
      • 127-S1.5-Foundation Uploaded: 4/18/2025 (269 kb)
      • 128-S1.6-FoundationSchedule Uploaded: 4/18/2025 (555 kb)
      • 129-S1.7-FoundationSchedule Uploaded: 4/18/2025 (308 kb)
      • 130-S2.1-RoofFraming Uploaded: 4/18/2025 (381 kb)
      • 131-S2.2-RoofFraming Uploaded: 4/18/2025 (377 kb)
      • 132-S2.3-RoofFraming Uploaded: 4/18/2025 (401 kb)
      • 133-S2.4-RoofFraming Uploaded: 4/18/2025 (432 kb)
      • 134-S2.5-HighRoofFraming Uploaded: 4/18/2025 (292 kb)
      • 135-S2.6-HighRoofFraming Uploaded: 4/18/2025 (296 kb)
      • 136-S2.7-LintelFraming Uploaded: 4/18/2025 (300 kb)
      • 137-S2.8-LintelFraming Uploaded: 4/18/2025 (454 kb)
      • 138-S2.9-LintelFraming Uploaded: 4/18/2025 (281 kb)
      • 139-S2.10-LintelFraming Uploaded: 4/18/2025 (330 kb)
      • 140-S2.11-LintelFraming Uploaded: 4/18/2025 (245 kb)
      • 141-S2.12-MasonryNotes Uploaded: 4/18/2025 (514 kb)
      • 142-S2.13-MasonryNotes Uploaded: 4/18/2025 (306 kb)
      • 143-S2.14-SteelNotes Uploaded: 4/18/2025 (287 kb)
      • 144-S3.1-WallSecs Uploaded: 4/18/2025 (293 kb)
      • 145-S3.2-WallSecs Uploaded: 4/18/2025 (326 kb)
      • 146-S3.3-WallSecs Uploaded: 4/18/2025 (185 kb)
      • 147-S3.4-WallSec Uploaded: 4/18/2025 (426 kb)
      • 148-S3.5-WallSecs Uploaded: 4/18/2025 (355 kb)
      • 149-S4.1-FramingElev Uploaded: 4/18/2025 (195 kb)
      • 150-S4.2-RoofLoading Uploaded: 4/18/2025 (285 kb)
  • Specs
    • DIV 22
      • DIV 22 Uploaded: 4/18/2025 (767 kb)
    • DIV 6
      • 061000-RoughCarpentry Uploaded: 4/18/2025 (545 kb)
      • 064023-IntArchWoodwork Uploaded: 4/18/2025 (484 kb)
    • DIV 21
      • DIV 21 Uploaded: 4/18/2025 (571 kb)
    • DIV 5
      • 051200-StructSteelFraming Uploaded: 4/18/2025 (483 kb)
      • 052100-SteelJoistFraming Uploaded: 4/18/2025 (462 kb)
      • 053100-SteelDecking Uploaded: 4/18/2025 (500 kb)
      • 054000-ColdFormedMetalFraming Uploaded: 4/18/2025 (494 kb)
      • 055000-MetalFab Uploaded: 4/18/2025 (500 kb)
      • 058100-ExpJointCoverAssemblies Uploaded: 4/18/2025 (463 kb)
    • DIV 2
      • 024119-SelectiveDemo Uploaded: 4/18/2025 (470 kb)
    • DIV 4
      • 042000-UnitMasonry Uploaded: 4/18/2025 (567 kb)
    • DIV 33
      • 331113-FacilityWaterDistPiping Uploaded: 4/18/2025 (465 kb)
      • 331313-SanitarySewers Uploaded: 4/18/2025 (461 kb)
      • 334200-StormUtilityDrainagePiping Uploaded: 4/18/2025 (499 kb)
      • 334713-PondLiners Uploaded: 4/18/2025 (456 kb)
    • DIV 0
      • 001-Cover Uploaded: 4/18/2025 (298 kb)
      • 002-TOC Uploaded: 4/18/2025 (154 kb)
      • 003-ITB Uploaded: 4/18/2025 (86 kb)
      • 004-InstructToBid Uploaded: 4/18/2025 (685 kb)
      • 005-SuppInstructToBid Uploaded: 4/18/2025 (136 kb)
      • 006-BidFormGC Uploaded: 4/18/2025 (117 kb)
      • 007-BidFormMEP Uploaded: 4/18/2025 (250 kb)
      • 008-QstmtAIA Uploaded: 4/18/2025 (843 kb)
      • 009-NonCollusionAffidavit Uploaded: 4/18/2025 (72 kb)
      • 010-NonDiscriminationAffidavit Uploaded: 4/18/2025 (67 kb)
      • 011-AgmtAIA Uploaded: 4/18/2025 (320 kb)
      • 012-SchoolCodeAgmt Uploaded: 4/18/2025 (68 kb)
      • 013-eVerifyAct Uploaded: 4/18/2025 (60 kb)
      • 014-WCAffidavit Uploaded: 4/18/2025 (63 kb)
      • 015-BidBondAIA Uploaded: 4/18/2025 (92 kb)
      • 016-PandPBondAIA Uploaded: 4/18/2025 (477 kb)
      • 017-GenCond Uploaded: 4/18/2025 (3934 kb)
      • 018-SuppGenCond Uploaded: 4/18/2025 (236 kb)
      • 019-SpecialConditions Uploaded: 4/18/2025 (72 kb)
      • 020-ReleaseOfLiens Uploaded: 4/18/2025 (73 kb)
      • 021-TaxExempt Uploaded: 4/18/2025 (65 kb)
      • 022-PrevailingWages Uploaded: 4/18/2025 (65 kb)
      • 023-PlanCon Uploaded: 4/18/2025 (61 kb)
    • DIV 28
      • DIV 28 Uploaded: 4/18/2025 (683 kb)
    • DIV 27
      • DIV 27 Uploaded: 4/18/2025 (942 kb)
    • DIV 9
      • 092236.23-MetalSuspensionGypBoardCeilingSys Uploaded: 4/18/2025 (464 kb)
      • 092900-GypBoard Uploaded: 4/18/2025 (488 kb)
      • 093000-Tiling Uploaded: 4/18/2025 (477 kb)
      • 095113-AcousticalCeilings Uploaded: 4/18/2025 (486 kb)
      • 096466-WoodAthleticFlooring Uploaded: 4/18/2025 (466 kb)
      • 096513-ResilientBase Uploaded: 4/18/2025 (463 kb)
      • 096519-ResilientTileFlooring Uploaded: 4/18/2025 (469 kb)
      • 096723-ResinousFlooring Uploaded: 4/18/2025 (480 kb)
      • 096813-TileCarpeting Uploaded: 4/18/2025 (512 kb)
      • 097200-Wallcovering Uploaded: 4/18/2025 (473 kb)
      • 097723-FabricWrappedPanels Uploaded: 4/18/2025 (461 kb)
      • 099123-Painting Uploaded: 4/18/2025 (521 kb)
      • 099600-HighPerformanceCoatings Uploaded: 4/18/2025 (473 kb)
    • DIV 26
      • DIV 26 Uploaded: 4/18/2025 (3177 kb)
    • DIV 8
      • 080671-DoorHdwSchedule Uploaded: 4/18/2025 (4436 kb)
      • 081113-HMDoorsAndFrames Uploaded: 4/18/2025 (498 kb)
      • 081416-FlushWoodDoors Uploaded: 4/18/2025 (472 kb)
      • 083113-AccessDoors Uploaded: 4/18/2025 (474 kb)
      • 083523-90MinAccordionAccessFireDoor Uploaded: 4/18/2025 (471 kb)
      • 084113-AlumFrameEntrances Uploaded: 4/18/2025 (498 kb)
      • 085820-PassThroughWindows Uploaded: 4/18/2025 (455 kb)
      • 087100-DoorHdw Uploaded: 4/18/2025 (575 kb)
      • 088000-GenGlazing Uploaded: 4/18/2025 (505 kb)
      • 088100-FireRatedGlazing Uploaded: 4/18/2025 (490 kb)
      • 088810-FireRatedFramesAndGlazing Uploaded: 4/18/2025 (473 kb)
    • DIV 23
      • DIV 23 Uploaded: 4/18/2025 (1965 kb)
    • DIV 7
      • 071110-Waterproofing Uploaded: 4/18/2025 (464 kb)
      • 072100-ThermalInsulation Uploaded: 4/18/2025 (475 kb)
      • 074123-MetalWallPanels Uploaded: 4/18/2025 (606 kb)
      • 074243-CompositeMetalPanelAssemblies Uploaded: 4/18/2025 (475 kb)
      • 074293-LinearMetalCeilings Uploaded: 4/18/2025 (523 kb)
      • 075323-EPDMRoofing Uploaded: 4/18/2025 (479 kb)
      • 076200-SheetMetalFlashing Uploaded: 4/18/2025 (497 kb)
      • 077200-RoofAccessories Uploaded: 4/18/2025 (456 kb)
      • 078413-FirestopSys Uploaded: 4/18/2025 (479 kb)
      • 079200-JointSealants Uploaded: 4/18/2025 (494 kb)
    • DIV 12
      • 122413-RollerWindowShades Uploaded: 4/18/2025 (470 kb)
      • 123216-EdCasework Uploaded: 4/18/2025 (512 kb)
      • 123627-LibraryFurniture Uploaded: 4/18/2025 (475 kb)
      • 123661-SimulatedStoneFab Uploaded: 4/18/2025 (453 kb)
      • 124813-EntranceFloorMats Uploaded: 4/18/2025 (464 kb)
      • 126613-TelescopingBleachers Uploaded: 4/18/2025 (489 kb)
    • DIV 11
      • 111313-DockBumpers Uploaded: 4/18/2025 (452 kb)
      • 111319-DockLevelers Uploaded: 4/18/2025 (495 kb)
      • 111480-PhysEdEquip Uploaded: 4/18/2025 (502 kb)
      • 114000-FoodSvcEquip Uploaded: 4/18/2025 (705 kb)
    • DIV 32
      • 321216-AsphaltPaving Uploaded: 4/18/2025 (455 kb)
      • 321313-CementConcreteSidewalkPaving Uploaded: 4/18/2025 (461 kb)
      • 321373-ConcretePavingJointSealants Uploaded: 4/18/2025 (466 kb)
      • 321726-TactileWarningSurface Uploaded: 4/18/2025 (463 kb)
      • 321816-PlaygroundSurfacingSys Uploaded: 4/18/2025 (479 kb)
      • 323113-ChainLinkFences Uploaded: 4/18/2025 (476 kb)
      • 323121-AlumLouverFences Uploaded: 4/18/2025 (468 kb)
      • 323333-Bollards Uploaded: 4/18/2025 (455 kb)
      • 323343-Signage Uploaded: 4/18/2025 (467 kb)
      • 329200-TurfAndGrasses Uploaded: 4/18/2025 (461 kb)
      • 329300-Plants Uploaded: 4/18/2025 (516 kb)
    • DIV 10
      • 101100-VisualDisplay Uploaded: 4/18/2025 (582 kb)
      • 101112-SpecialtyBldProducts Uploaded: 4/18/2025 (471 kb)
      • 101115-VinylGraphics Uploaded: 4/18/2025 (483 kb)
      • 101200-DisplayCases Uploaded: 4/18/2025 (471 kb)
      • 101419-DimensionalLtrSignage Uploaded: 4/18/2025 (517 kb)
      • 101423-PanelSigns Uploaded: 4/18/2025 (481 kb)
      • 102113-ToiletCompartments Uploaded: 4/18/2025 (467 kb)
      • 102123-CubicleTracks Uploaded: 4/18/2025 (456 kb)
      • 102238-OperablePartitions Uploaded: 4/18/2025 (464 kb)
      • 102800-ToiletAccessories Uploaded: 4/18/2025 (454 kb)
      • 104416-FireExtinguishers Uploaded: 4/18/2025 (453 kb)
      • 105113-MetalLockers Uploaded: 4/18/2025 (518 kb)
    • DIV 31
      • 311000-SiteClearing Uploaded: 4/18/2025 (461 kb)
      • 312000-EarthMoving Uploaded: 4/18/2025 (491 kb)
      • 312319-Dewatering Uploaded: 4/18/2025 (475 kb)
      • 315000-ExcavationSupport Uploaded: 4/18/2025 (457 kb)
    • DIV 1
      • 011000-Summary Uploaded: 4/18/2025 (96 kb)
      • 012200-UnitPrices Uploaded: 4/18/2025 (107 kb)
      • 012300-Alternates Uploaded: 4/18/2025 (87 kb)
      • 012500-Substitutions Uploaded: 4/18/2025 (118 kb)
      • 012600-Modification Uploaded: 4/18/2025 (67 kb)
      • 012700-CuttingAndPatch Uploaded: 4/18/2025 (148 kb)
      • 012800-FieldEngineering Uploaded: 4/18/2025 (80 kb)
      • 012900-AppForPmt Uploaded: 4/18/2025 (72 kb)
      • 013100-ProjCoordination Uploaded: 4/18/2025 (90 kb)
      • 013150-ProjMeetings Uploaded: 4/18/2025 (84 kb)
      • 013200-ConstProgressDoc Uploaded: 4/18/2025 (130 kb)
      • 013300-Submittals Uploaded: 4/18/2025 (174 kb)
      • 014000-QualityReq Uploaded: 4/18/2025 (145 kb)
      • 014100-Safety Uploaded: 4/18/2025 (75 kb)
      • 015000-TempFacilities Uploaded: 4/18/2025 (133 kb)
      • 017200-ProjRecDoc Uploaded: 4/18/2025 (68 kb)
      • 017700-Closeout Uploaded: 4/18/2025 (74 kb)
      • 017800-FinalCleaning Uploaded: 4/18/2025 (68 kb)
      • 017823-OandM Uploaded: 4/18/2025 (81 kb)
      • 017900-Warranties Uploaded: 4/18/2025 (69 kb)
    • DIV 3
      • 033000-CastInPlaceConcrete Uploaded: 4/18/2025 (528 kb)
      • 034500-PrecastArchConcrete Uploaded: 4/18/2025 (480 kb)
      • 035416-HydrualicCementUnderlayment Uploaded: 4/18/2025 (471 kb)

Project Info

Project #
Project Name Conewago Valley School District E.S. Additions and Renovations
Location 1189 W. Elm Avenue, Hanover, PA 17331
Address Map It 1189 W. Elm Avenue
City Hanover
State PA
Zip 17331
Bid Date May 22, 2025
Bid Time 9:00 AM
Site Meeting Date April 24, 2025
Site Meeting Time 3:00 PM
 
Scope
ECI is seeking bids from sub-contractors and suppliers for the general construction and site work for the Conewago Valley School District Elementary School Additions and Renovations project. The project consists of selective demo of existing building, and construction of additions and renovations. For a full scope of work please see the complete project documents. 


Additional Bid Info:

  • Our bids are due to the owner on May 22nd, at 2:00PM AM. Please have your bids to us no later than May 22nd at 9am. 
  • There is a pre bid meeting at the Elementary School on April 24th, at 3:00pm. If you are biding demolition or site and need to see existing conditions this would be a good opportunity.
  • RFIs need to be received 7 days prior to bid date if you want them to be addressed.  
  • This project will begin approximately June of 2025.
  • Substantial completion: August 13th, 2027
  • Final completion: October 12, 2027
  • Phased Construction, bid accordingly. See phasing plan.
  • This project is bidding as a multi-prime project. Plumbing, HVAC, and Electrical contractors are required to bid directly to the owner.
  • Prevailing wages do apply. Please bid accordingly.
  • The project involves 4 alternates. Please review spec section 012300 and provide all that effect your scope with your bid.
  • There are 7 unit prices. Please review 012200 and provide all that apply with your bid.
  • No substitutions requests will be considered during the bid period. Bids shall be based on products from one of the manufactures specified or an "equal" product.
  • Substitution requests submitted more than 60 days after Notice to Proceed must be accompanied by a credit proposal.
  • The project owner or eciConstruction will not pay any materials increases after a bid is submitted. Please include any required materials increases in your bid. 
Plans
Plans are available in the plan room for download. 
Other Info

Estimators

Company Estimator Phone Extension Fax Email
eciConstruction, LLC Chris Hinton 717-638-3310 csh@eciConstruction.com
eciConstruction, LLC Nick Yinger 717-638-3325 nay@eciconstruction.com

If you have project-related questions, please contact your contractor or use the "Submit Question" tab.
If you are having technical difficulties downloading, please email support@pipelinesuite.com or call 949-222-0400.