DESIGN-BUILD (DB), P-1401 REPLACE BACKUP POWER GENERATION UPS, PLC’S

Project Files

  • RFIs and PPIs
    • Attachment_C___Pre_Proposal_Inquiry__PPI__form.xlsx Uploaded: 4/23/2025 (11 kb)
  • RFP and Scope
    • 25R2511_General_Requirements.pdf Uploaded: 4/23/2025 (227 kb)
    • Attachment_A___FINAL_DB_RFP.pdf Uploaded: 4/23/2025 (7486 kb)
    • Attachment_B___WD_VA20250160.docx Uploaded: 4/23/2025 (25 kb)
    • Attachment_D___P1401_Price_Schedule_Form.pdf Uploaded: 4/23/2025 (139 kb)
    • Attachment_E___PIEE_Vendor_Access_Instructions.pdf Uploaded: 4/23/2025 (510 kb)
    • Attachment_F___P_1401_Final_DB_RFP_0001.pdf Uploaded: 4/23/2025 (147 kb)
  • Amendments
    • 0001
      • 25R2511_SF30_Amendment_0001.pdf Uploaded: 5/8/2025 (504 kb)
      • Attachment_G___SECNAV_5512.pdf Uploaded: 5/8/2025 (1872 kb)
      • Attachment_H___ODP.xlsx Uploaded: 5/8/2025 (14 kb)
      • Attachment_I___NSA_HR_Main_Site_Base_Map_NH139.pdf Uploaded: 5/8/2025 (10516 kb)
    • 0003
      • 25R2511SF30Amendment0003.pdf Uploaded: 5/28/2025 (461 kb)
      • AttachmentL-SiteVisitLog.pdf Uploaded: 5/28/2025 (1536 kb)
    • 0002
      • 25R2511_SF30_Amendment_0002.pdf Uploaded: 5/21/2025 (721 kb)
      • Attachment_J___Cost_Loaded_Network_Analysis_Schedules.pdf Uploaded: 5/21/2025 (84 kb)
      • Attachment_K___NH139_MCX_Parking_Lot.pdf Uploaded: 5/21/2025 (9766 kb)

Project Info

Project # 2519-04
Project Name DESIGN-BUILD (DB), P-1401 REPLACE BACKUP POWER GENERATION UPS, PLC’S
Location NSA Hampton Roads, Norfolk, Virginia
Address
City
State
Zip
Bid Date June 18, 2025
Bid Time 12:00 PM
Site Meeting Date May 28, 2025
Site Meeting Time 9:00 AM
 
Scope
This project is for the Replacement of Backup Power Generation at at NH139 
Naval Support Activity Hampton Roads, Virginia. The work includes the complete design for the 
replacement of backup generation, UPS, and PLC’s and incidental related work. Contractor will follow 
UFC 3-501-01 for replacement equipment and installation compliance. Equipment and any installation 
must comply with current requirements. The replaces systems must work correctly with all necessary 
interfaces whether specifically indicated or not. The reference drawings may not be accurate and the 
contractor accepts that their inclusion in the RFP is to aid in evaluation, but cannot be held to be verified 
or complete. Any discrepancy, error, or omissions in these old as-built drawings do not relieve the 
Contractor of the obligation to perform this work and no extra compensation will be allowed for same. 
In submitting a proposal for this work, it is understood that the Contractor takes full responsibility of all 
work performed including all professional services of verifying the existing systems interoperability with 
the facility.
Plans Please find the following in the Pipeline Online Planning Room (PipelineOPR):
-General Requirements
-Scope of Work
-All Documents
Other Info If you have any questions, please reach out to Adam Mangus (estimating@miggov.com), Jose Gutierrez (757-759-6165). Additionally, please submit all quotes to Estimating@miggov.com. Visit miggov.com for more information.

Notices

If you are looking for attached files related to a Notice, go back to the Home tab ("Project Files" are on the right side).
Title Created By Created On
Amendment 1 Amy Fanghella 5/8/2025
Amendment 2 Amy Fanghella 5/21/2025
Amendment 3 Amy Fanghella 5/28/2025

If you have project-related questions, please contact your contractor or use the "Submit Question" tab.
If you are having technical difficulties downloading, please email support@pipelinesuite.com or call 949-222-0400.