DESIGN-BUILD (DB), P-1401 REPLACE BACKUP POWER GENERATION UPS, PLC’S

Project Files

  • 01 RFP SCOPE
    • 25R2511 General Requirements.pdf Uploaded: 4/24/2025 (235 kb)
    • Attachment_A___FINAL_DB_RFP.pdf Uploaded: 4/24/2025 (7486 kb)
    • Attachment_B___WD_VA20250160.docx Uploaded: 4/24/2025 (25 kb)
    • Attachment_C___Pre_Proposal_Inquiry__PPI__form.xlsx Uploaded: 4/24/2025 (11 kb)
    • Attachment_D___P1401_Price_Schedule_Form.pdf Uploaded: 4/24/2025 (139 kb)
    • Attachment_E___PIEE_Vendor_Access_Instructions.pdf Uploaded: 4/24/2025 (510 kb)
    • Attachment_F___P_1401_Final_DB_RFP_0001.pdf Uploaded: 4/24/2025 (147 kb)
  • 03 AMENDMENTS
    • 002
      • 25R2511 SF30 Amendment 0002.pdf Uploaded: 5/21/2025 (721 kb)
      • Attachment_J___Cost_Loaded_Network_Analysis_Schedules.pdf Uploaded: 5/21/2025 (84 kb)
      • Attachment_K___NH139_MCX_Parking_Lot.pdf Uploaded: 5/21/2025 (9766 kb)
    • 001
      • 25R2511 SF30 Amendment 0001.pdf Uploaded: 5/9/2025 (504 kb)
      • Attachment_G___SECNAV_5512.pdf Uploaded: 5/9/2025 (1872 kb)
      • Attachment_H___ODP.xlsx Uploaded: 5/9/2025 (14 kb)
      • Attachment_I___NSA_HR_Main_Site_Base_Map_NH139.pdf Uploaded: 5/9/2025 (10516 kb)

Project Info

Project # 1232-25
Project Name DESIGN-BUILD (DB), P-1401 REPLACE BACKUP POWER GENERATION UPS, PLC’S
Location Naval Support Activity Hampton Roads Norfolk, Virginia
Address
City
State
Zip
Bid Date June 18, 2025
Bid Time 10:00 AM
 
Scope SAW Eastern JV (a joint venture between SAW Contracting and Eastern Coast Construction) invites you to bid on the subject project.

The project includes the Replacement of Backup Power Generation at at NH139
Naval Support Activity Hampton Roads, Virginia. The work includes the complete design for the replacement of backup generation, UPS, and PLC’s and incidental related work. Contractor will follow UFC 3-501-01 for replacement equipment and installation compliance. Equipment and any installation must comply with current requirements. The replaces systems must work correctly with all necessary
interfaces whether specifically indicated or not. The reference drawings may not be accurate and the contractor accepts that their inclusion in the RFP is to aid in evaluation, but cannot be held to be verified or complete. Any discrepancy, error, or omissions in these old as-built drawings do not relieve the Contractor of the obligation to perform this work and no extra compensation will be allowed for same.
In submitting a proposal for this work, it is understood that the Contractor takes full responsibility of all work performed including all professional services of verifying the existing systems interoperability with the facility.
Plans Please find the following in the Pipeline Online Planroom: 

01 RFP/SCOPE
02 PLANS/SPECS
03 AMENDMENTS



Other Info

Please visit our website www.easterncoastconstruction.com under “Bid Board” for all projects currently bidding with download links. 

 

Please send all proposals to bids@easterncoastconstruction.com and thank you for the support!

Notices

If you are looking for attached files related to a Notice, go back to the Home tab ("Project Files" are on the right side).
Title Created By Created On
Amendment 001 - Bid Extension and Site Visit Information Emery Chickey 5/9/2025
SITE VISIT WEDNESDAY 28 MAY 0900 Emery Chickey 5/14/2025
Amendment 002 Emery Chickey 5/21/2025

Estimators

Company Estimator Phone Extension Fax Email
Eastern Coast Construction Emery Chickey 757-276-8550 Emery.c@easterncoastconstruction.com

Contacts
Type Company Estimator Phone Extension Fax Email
Estimator Eastern Coast Construction Cebert White 757-355-0148 bids@easterncoastconstruction.com

If you have project-related questions, please contact your contractor or use the "Submit Question" tab.